Tender Value
₹3 L
EMD Value
₹6,000
Closing Date
8 Sept 2026, 6:00 pmClosed
XEN REW JAMMU
XEN REW JAMMU
Construction of Protection work at Bangwad near House of Mohan,Som nath ,Girdari Milkhi pyt dori block kharah balli under the scheme capex budget pri plan for the year
2026_RDPR_323013_2
e-NIT No. 521-RE WJ of 2026-27 dated 01-09-2026
Open Tender
Civil Works
Percentage
30 days
XEN REW JAMMU
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
MH0515
₹6,000
Yes
12 Sept 2026
1 Sept 2026
9 Sept 2026
1 Sept 2026
8 Sept 2026
1 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:ALL KINDS OF SOIL | 15.89 | CUM | 479.3 | ₹7,613.68 |
| 2 | P/L CEMENT CONCRETE OF 1 5 10 MIX EXCL THE COST OF CENTERING AND SHUTTERING ALL COMPLETE WITH 40MM NOMINAL AGGREGATES | 1.77 | CUM | 4,826.5 | ₹8,542.91 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 MIX with 20mm nominal aggregates all complete. | 36 | CUM | 5,733.6 | ₹2,06,409.6 |
| 4 | SUPPLY AND FILLING OF STONES | 15 | CUM | 900 | ₹13,500 |
| 5 | CENTERING AND SHUTTERING INL PROPPING , REMOVAL OF FORMWORK. | 65 | SQM | 286.35 | ₹18,612.75 |
| 6 | SAND FOR 10 KM | 17.28 | CUM | 279.04 | ₹4,821.81 |
| 7 | AGG FOR 25 KM | 34.56 | CUM | 465.14 | ₹16,075.24 |
| 8 | STONES FOR 10 KM | 20 | CUM | 328.31 | ₹6,566.2 |
| 9 | SAND FOR 50 MTRS BY MANUAL LABOUR | 17.3 | CUM | 200.67 | ₹3,471.59 |
| 10 | AGG FOR 50 MTRS BY MANUAL LABOUR | 39 | CUM | 200.67 | ₹7,826.13 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.97 MB
BOQ_1086000.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .