| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAccepted-Finance | ₹1.5 Cr | L1 | Accepted-Finance The report is attached along |
| 2 | L2₹1.6 CrRejected-Finance | ₹1.6 Cr | L2 | Rejected-Finance The report is attached along |
| 3 | L3₹1.7 CrRejected-Finance | ₹1.7 Cr | L3 | Rejected-Finance The report is attached along |
| 4 | L4₹1.9 CrRejected-Finance | ₹1.9 Cr | L4 | Rejected-Finance The report is attached along |
| 5 | L5₹2.0 CrRejected-Finance | ₹2.0 Cr | L5 | Rejected-Finance The report is attached along |
| Sl No | Description | Qty | Unit | R.K GUPTA AND CO. L3 | S KUMAR CREATION PRIVATE LIMITED L7 | DEVESH CONSTRUCTIONS L1 | ALHADIN CONSTRUCTION L6 | ASHOK KUMAR GARG CONTRACTOR L5 | M/S VIKAS DUGGAL L4 | Cee Kay EPC Projects Pvt Ltd L2 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Material Required | ||||||||||
| 1.01 | Galvanized steel poles of tubular in design and swaged of the length 7 meters, with top cap welded and lightning spike and including MUFF | 880 | Nos | 8,200 ₹72.2 L | 11,201 ₹98.6 L | 7,600 ₹66.9 L | 9,500 ₹83.6 L | 8,850 ₹77.9 L | 7,000 ₹61.6 L | 8,420 ₹74.1 L |
| 1.02 | Galvanized steel poles of tubular in design and swaged of the length 8 meters, with top cap welded and lightning spike and including MUFF | 221 | Nos | 8,900 ₹19.7 L | 13,551 ₹29.9 L | 9,250 ₹20.4 L | 11,500 ₹25.4 L | 11,047 ₹24.4 L | 8,500 ₹18.8 L | 9,500 ₹21.0 L |
| 1.03 | Stay arrangement for 7M/8M steel poles of Galvanised Steel | 110 | Nos | 2,450 ₹2.7 L | 3,501 ₹3.9 L | 2,800 ₹3.1 L | 3,000 ₹3.3 L | 2,500 ₹2.8 L | 1,500 ₹1.6 L | - |
| 1.04 | Formed OFC Dead End and Termination Fittings including all supporting items. | 221 | Nos | 1,200 ₹2.7 L | 1,501 ₹3.3 L | 1,270 ₹2.8 L | 2,500 ₹5.5 L | 1,600 ₹3.5 L | 1,200 ₹2.7 L | - |
| 1.05 | OFC suspension fittings including all supporting items. | 880 | Nos | 800 ₹7.0 L | 1,001 ₹8.8 L | 1,000 ₹8.8 L | 1,800 ₹15.8 L | 1,600 ₹14.1 L | 900 ₹7.9 L | - |
| 1.06 | Adjustable Cable Storage Bracket. | 221 | Nos | 550 ₹1.2 L | 902 ₹2.0 L | 600 ₹1.3 L | 1,300 ₹2.9 L | 1,000 ₹2.2 L | 650 ₹1.4 L | - |
| 2.00SERVICES REQUIRED | ||||||||||
| 2.01 | Erection of 7 m / 8m poles including excavation, fixing of MUFF, concreting, curing, Backfilling, Reinstatement, Compaction of earth, Stay arrangements etc. and sign writing on poles with paint | 1,101 | Nos | 3,500 ₹38.5 L | 3,851 ₹42.4 L | 2,800 ₹30.8 L | 3,300 ₹36.3 L | 4,000 ₹44.0 L | 1,200 ₹13.2 L | 3,700 ₹40.7 L |
| 2.02 | Slinging / Laying of ADSS / AOF including fixing of installation accessories and fixtures etc. splicing & jointing of OF cable, Link Testing & Acceptance Testing and makeover of route with As Built Diagram (ABD) of installed cost towards collection of ADSS Cable / AOF Cable from BSNL’s Store Depot. | 44 | Km | 42,000 ₹18.5 L | 55,000 ₹24.2 L | 29,000 ₹12.8 L | 79,000 ₹34.8 L | 65,000 ₹28.6 L | 1,92,000 ₹84.5 L | 45,000 ₹19.8 L |
Tender Value
₹2.2 Cr
EMD Value
₹4.3 L
Closing Date
15 Jan 2026, 12:30 pmClosed
Chief General Manager, BSNL Himachal Pradesh Circl
O/o CGMT BSNL HP, Block no. 11, SDA Complex, Kasumpti, Shimla.
Tender for comprehensive construction of ADSS OFC, including Supply and installation of related ADSS OFC accessories, supply and erection of 7m/8m tubular poles along with associated accessories, slinging of ADSS Cable, testing and commissioning
2025_BSNL_259565_1
HPCO-23/11/24/2025-CFA-HPCO
Open Tender
OFC Laying Works
1095 days
Mandi and Kullu OA
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,360
Yes
AO(Claim), O/o CGMT, BSNL HP
₹4.3 L
Yes
25 Apr 2026
18 Dec 2025
16 Jan 2026
25 Dec 2025
15 Jan 2026
25 Dec 2025
25 Dec 2025 - 5 Jan 2026
Material Required
Galvanized steel poles of tubular in design and swaged of the length 7 meters, with top cap welded and lightning spike and including MUFF
Galvanized steel poles of tubular in design and swaged of the length 8 meters, with top cap welded and lightning spike and including MUFF
Stay arrangement for 7M/8M steel poles of Galvanised Steel
Formed OFC Dead End and Termination Fittings including all supporting items.
OFC suspension fittings including all supporting items.
Adjustable Cable Storage Bracket.
SERVICES REQUIRED
Erection of 7 m / 8m poles including excavation, fixing of MUFF, concreting, curing, Backfilling, Reinstatement, Compaction of earth, Stay arrangements etc. and sign writing on poles with paint
Slinging / Laying of ADSS / AOF including fixing of installation accessories and fixtures etc. splicing & jointing of OF cable, Link Testing & Acceptance Testing and makeover of route with As Built Diagram (ABD) of installed cost towards collection of ADSS Cable / AOF Cable from BSNL’s Store Depot.
Construction of Joint Chamber as per EI supply & fixing of G.I. Pipe & PLB pipe for bringing down the of cable, supply of stone slab for covering the chamber and sand for filling the chamber
Installation of FDF and WSC/FTB, leading-in arrangement, jointing of pigtails and other related activity for construction of ADSS/Aerial OFC routes
Quoted Price iro Estimated Cost @
Please Enable Macros to View BoQ information
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 12.58 MB
approvedTender44kmMNDKLU.pdf
Tender Documents • 12.56 MB
BOQ_300008.xls
BOQ • 0.28 MB
taxdetailsADSSlaying.pdf
Additional Documents • 0.76 MB