| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹8.9 LAdmitted-Finance | -0.09% | ₹8.9 L | L1 | Admitted-Finance |
| 2 | L2₹8.9 LAdmitted-Finance | -0.07% | ₹8.9 L | L2 | Admitted-Finance |
| 3 | L3₹8.9 LAdmitted-Finance | -0.05% | ₹8.9 L | L3 | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹8.9 L
EMD Value
₹8,897
Closing Date
12 Jan 2026, 4:00 pmClosed
Cheif Executive Officer Zilla Parishad Pune
Yashwantrao Chavan Bhavan Pune Camp Pune 411001
1.PROVIDING UNDER GROUND DRAINAGE LINE FROM ROYAL CRYSTAL SOCIETY TO JATHAR HOUSE AT VARSOLI TALUKA- MAVAL DISTRICT PUNE (Z.P.Regd.M.S.S.)
2026_RDPUN_1266288_1
ZP/PUNE/RWS/E-Tender/ 22 /2025-26
Open Tender
Civil Works - Water Works
180 days
Pune
Please refer Tender Notice
3 documents required · 3 mandatory
₹590
₹8,897
Yes
4 Mar 2026
5 Jan 2026
13 Jan 2026
5 Jan 2026
12 Jan 2026
5 Jan 2026
Item No-1 Providing ISI standard R.C.C. pipes in standard lengths of following class and diameter suitable for either collar joints or rubber ring joints, excluding GST lev-ied by GOI & GOM in all respect including inspec- tion charges, transport to departmental stores, unloading and stacking etc. complete as per IS-458/1988. Note :One collar should be supplied with each full length plain ended RCC pipe, cost including in rates below. One rubber ring should be supplied with each full length of socketed pipe, cost included in rates below. 450 mm dia.RCC NP II class pipe
Item No-2 Excavation for foundation / pipe trenches in earth, soils of all types, sand, gravel and soft murum, including removing the excavated material upto a distance of 50 metres and lifts as below, stacking and spreading as directed, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. (Bd-A-1/259)
Item No- Excavation for foundation / pipe trenches in soft rock and old cement and lime masonry foundation asphalt road including removing the excavated material upto a distance of 50 M beyond the area and lifts as below, stacking as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. (Bd-A-4/259)
Item No-4 Filling in plinth and floors murum bedding in trenches with approved murum from excavated materials from foundation in 15 cm to 20 cm layers including watering and compaction, etc. complete. (Bd-A-10/263)
Item No-5 Lowering, laying and jointing in proper grade and alignment R.C.C. pipes with collar joints in C.M.1:1 proportion or socketed R.C.C. pipes with rubber joints (excluding cost of rubber ring or R.C.C.collar,) including cost of conveyance from stores to site of work, cost of jointing material, labour, etc. complete as directed by Engineerin- charge (For all class of pipes.) as per IS- 783-1985. 450 mm dia.RCC NP II class pipe
Item No.7 :- Providing and constructing B.B. masonry circular manhole without conical shape excluding excavation, RCC 1:2:4 proportion, 20 cm bedding brick masonry in CM 1:4 proportion, 23 cm thick for 2 M depth from top 35 cm thick for 2 M below it and 45 cm thick for balance depth, RCC slab at top and at 2 M depth from top for supporting brick masonry above it, plastering with smooth finish in CM 1:2 proportion, C.C. 1:2:4 finishing channels in smooth rendering, providing C.I. dapuri type steps each weighing 5.5 kg.,providing and fixing S.F.R.C. frame and co ver of 56 cm dia. at top including cost of all materials and labour do etc complete Circular chamber 1.00 m depth Chamber 60 x 45
Item No-7 Providing and laying in situ Cement Concrete M-15 of trap/ granite / quartzite / gneiss metal for foundation and bedding including bailing out water, form work, compaction, curing, etc. complete.(Cement 5.90 bags /cum)
Item No-8 Refilling the trenches with available excavated stuff with soft material first over pipeline and then hard material in 15 cm layers with all leads and lifts including consolidation, surcharging, etc. complete.
Item No-7 Disposal of excavated stuff about 3 km ect..complete
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 4.95 MB
Tendernotice_2.pdf
PDF • 0.85 MB
Tendernotice_3.pdf
PDF • 0.06 MB
Tendernotice_4.pdf
PDF • 0.07 MB
Tendernotice_5.pdf
PDF • 2.95 MB
BOQ_2181562.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid