Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.5 LAccepted-AOC | L1 | Accepted-AOC ACCEPT | |
| 2 | L2₹13.7 L+₹19,592.50 (1.45%)Rejected-AOC | L2 | Rejected-AOC REJECT |
| Sl No | Description | Qty | Unit | P.M.Marimuthu L2 | LAKSHMI ASSOCIATES L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation in all soils and sub-soils and the full depth as may be directed by the departmental officers with initial lead and lift and cleaning and levelling the site etc., complete complying with standard specification | 269 | M3 | 210 ₹56,490 | 200 ₹53,800 Lowest |
| 2.00 | Cement concrete 1:4:8 mix (one cement, four sand, eight metal )using 40mm size hard broken stones from approved quarry complying with standard specification | 34 | M3 | 5,400 ₹1,83,600 | 5,335 ₹1,81,390 Lowest |
| 3.00 | Supplying and erecting centering for side and soffits including necessary supports and strutting upto 3.29m high for plane surfaces such as side slabs of RCC boxing and similar vertical RCC slabs, FACIA, Drop etc., in all floor with all cross bracing using mild steel sheets of size of 90cm X 60cm and BG 10 stiffened with welded mild steel angles of size 25X25X3mm for boardinglaid over country wood joists of size 10cm x 6.5cm spaced at about 90cm C/C and supported by casurina props of 10cm to 13cm dia spaced at 75cm C/C etc., completed as directed. Sl.No.123B Part-II | 36 | M2 | 1,300 ₹46,800 | 1,269 ₹45,684 Lowest |
| 4.00 | Supplying and erecting centering for sides soffits including supports and strutting upto 3.29m high for plain surface such as rectangular column top and bottom slabs of boxing, sill, slabs, sun shade etc., in all floors using mild steel slabs of sizes 90cm x 60cm and BG 10stiffened with welded mild steel angles of size25X25x3mm for boarding laid over country wood joists of size 10cm X 6.5cm spaced at about 90cm C/C and supported by casurina props of 10cm to 13cm dia spaced at 75cm C/C etc., complete as directed. Sl.No.123 C
Part-II | 76 | M2 | 1,400 ₹1,06,400 | 1,385 ₹1,05,260 Lowest |
| 5.00 | Supply and Fabrication of RTS Rods in Various Dia. Including Cutting, Bending and Tying with all Labour Charges Etc., Complete. | 32.21 | Qtl | 9,200 ₹2,96,332 | 9,150 ₹2,94,721.5 Lowest |
| 6.00 | Reinforced Cement Concrete 1:1.5:3 Mix ( One Cement, One and Half Sand, Three Jelly) using 20 mm size HGB Jelly from Apprroved Quarry as per Standard Specification Etc., Complete. | 23 | M3 | 9,200 ₹2,11,600 | 9,180 ₹2,11,140 Lowest |
| 7.00 | Plastering in Cement Morter 1: 5 Mix using 12 mm Thick including Curing and all Labour Charges as per the Direction of the Departmental officers Etc., Complete | 23 | M2 | 290 ₹6,670 Lowest | 290 ₹6,670 Lowest |
| 8.00 | Cement Concrete 1:2:4 Mix ( One Cement, Two Sand, Three Jelly) using 20 mm size HGB Jelly from Apprroved Quarry as per Standard Specification Etc., Complete. | 61 | M3 | 6,700 ₹4,08,700 | 6,680 ₹4,07,480 Lowest |
| 9.00 | Conveying the excavated earth from the site from 0 to 15 km lead including loading and unloading charges etc., completed. | 269 | M3 | 200 ₹53,800 | 166 ₹44,654 Lowest |
Tender Value
₹16.2 L
EMD Value
₹16,200
Closing Date
5 May 2025, 3:00 pmClosed
The Commissioner, Coimbatore Corporation
Coimbatore Corporation, Main Office, Big bazaar street, Town hall, Coimbatore-1
Construction of Bridge across the Sengkuttai channel connecting the Thulasi Garden to Edayarpalayam Via Thiru Nagar in Ward no 94 South Zone.
2025_MAWS_550038_10
e19/2025
Open Tender
Civil Works
Works
150 days
Coimbatore corporation-
AS PER TENDER DOCUMENT
4 documents required · 4 mandatory
₹0
₹16,200
8 Aug 2025
23 Apr 2025
6 May 2025
23 Apr 2025
5 May 2025
23 Apr 2025
Amount
Earth work excavation in all soils and sub-soils and the full depth as may be directed by the departmental officers with initial lead and lift and cleaning and levelling the site etc., complete complying with standard specification
Cement concrete 1:4:8 mix (one cement, four sand, eight metal )using 40mm size hard broken stones from approved quarry complying with standard specification
Supplying and erecting centering for side and soffits including necessary supports and strutting upto 3.29m high for plane surfaces such as side slabs of RCC boxing and similar vertical RCC slabs, FACIA, Drop etc., in all floor with all cross bracing using mild steel sheets of size of 90cm X 60cm and BG 10 stiffened with welded mild steel angles of size 25X25X3mm for boardinglaid over country wood joists of size 10cm x 6.5cm spaced at about 90cm C/C and supported by casurina props of 10cm to 13cm dia spaced at 75cm C/C etc., completed as directed. Sl.No.123B Part-II
Supplying and erecting centering for sides soffits including supports and strutting upto 3.29m high for plain surface such as rectangular column top and bottom slabs of boxing, sill, slabs, sun shade etc., in all floors using mild steel slabs of sizes 90cm x 60cm and BG 10stiffened with welded mild steel angles of size25X25x3mm for boarding laid over country wood joists of size 10cm X 6.5cm spaced at about 90cm C/C and supported by casurina props of 10cm to 13cm dia spaced at 75cm C/C etc., complete as directed. Sl.No.123 C Part-II
Supply and Fabrication of RTS Rods in Various Dia. Including Cutting, Bending and Tying with all Labour Charges Etc., Complete.
Reinforced Cement Concrete 1:1.5:3 Mix ( One Cement, One and Half Sand, Three Jelly) using 20 mm size HGB Jelly from Apprroved Quarry as per Standard Specification Etc., Complete.
Plastering in Cement Morter 1: 5 Mix using 12 mm Thick including Curing and all Labour Charges as per the Direction of the Departmental officers Etc., Complete
Cement Concrete 1:2:4 Mix ( One Cement, Two Sand, Three Jelly) using 20 mm size HGB Jelly from Apprroved Quarry as per Standard Specification Etc., Complete.
Conveying the excavated earth from the site from 0 to 15 km lead including loading and unloading charges etc., completed.
P.M.Marimuthu (BID ID -1329816)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .