Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.7 CrAccepted-Finance | ₹2.7 Cr | 1 | Accepted-Finance Accept |
| 2 | 2₹2.7 Cr+₹53,824 (0.20%)Accepted-Finance | ₹2.7 Cr+₹53,824 (0.20%) | 2 | Accepted-Finance Accept |
| 3 | 3₹2.7 Cr+₹1.0 L (0.39%)Accepted-Finance | ₹2.7 Cr+₹1.0 L (0.39%) | 3 | Accepted-Finance Accept |
| 4 | 4₹2.7 Cr+₹1.4 L (0.51%)Accepted-Finance | ₹2.7 Cr+₹1.4 L (0.51%) | 4 | Accepted-Finance Accept |
| 5 | 5₹2.7 Cr+₹2.6 L (0.95%)Accepted-Finance | ₹2.7 Cr+₹2.6 L (0.95%) | 5 | Accepted-Finance Accept |
Tender Value
Refer Docs
EMD Value
₹2.7 L
Closing Date
30 Jun 2021, 11:00 amClosed
Deputy Conservator of Forest, UT, Chandigarh
Forest and Wildlife Department, 2nd floor, Paryavaran Bhawan, Madhya Marg, Sector 19B, Chandigarh
Plantation and its maintenance, clearance and dressing of fire line etc
2021_CHD_60279_1
FOR/21/835/09.06.2021
Open Tender
Composite Works
Item Rate
365 days
Chandigarh
As per tender document
6 documents required · 6 mandatory
₹0
₹2.7 L
27 Jul 2021
9 Jun 2021
30 Jun 2021
9 Jun 2021
30 Jun 2021
9 Jun 2021
9 Jun 2021 - 30 Jun 2021
Amount
Item with Detailed Specifications
Plantation of live hedge i.e. Arundo donex rhizomes along the bank of nepli main choe in Upper Nepli beats in Nepli Block, Nepli Range during 2021-22.
Plantation and patch sowing work on hill top in U/Lower Neplii beats in Nepli Block, Nepli Range during 2021-2022
Preparation of Medicinal Plants Beds near Nepli Inspection Hut in Upper Nepli Bet, Nepli Block, Nepli Range 2021-22.
Maintenance of lawn on the top of dam body and slope of Mudranwala dam no 2 near Inspection-Hut in Upper Nepli beat, Nepli range during 2021-2022
Remvoal of harmful weeds i.e. parthenium from Nepli forest area. in upper and lower Nepli beat, Nepli block nepli range during 2021-22.
Maintenance of lawn at Nepli range office in L/Nepli Beat, Nepli Block,Nepli range during 2021-2022
Maintenance of tracking path in Upper and Lower Nepli beat in Nepli Block, Nepli Range during 2021-22
Maintenance of main road of Upper and Lower Nepli beats in Nepli Block, Nepli Range during 2021-22
Mtc. of Ghatiwala track route in Lower Nepli Beat, Nepli Block, Nepli Range during 2021-22
Maintenance of ornamental plants for the beautification of main entry gate,nepli inspection house & other important sites of lower & upper nepli beat, nepli range during 2021-2022
Preparation of flowering beds and platation of flowering plants for the beautification of main entry gates & range office in lower nepli beat, nepli range during 2021-2022
6th year maintenance of fruit bearing plants to create habitat for wildlife plot adjoining village saketri in Lower Nepli beat, Nepli range during 2021-2022.
5th year maintenance of fruit bearing plants to create habitat for wildlife plot near old govt. quater in Lower Nepli beat, Nepli range during 2021-2022
4th year maintenance of fruit bearing plants to create habitat for wildlife plot near new entry gate no.1 in Lower Nepli beat, Nepli range during 2021-2022
3rd year maintenance of fruit bearing plants to create habitat for wildlife plot around range office in Lower Nepli beat, Nepli range during 2021-2022.
3rd year maintenance of fruit bearing plants to create habitat for wildlife plot near range office in Lower Nepli beat, Nepli range during 2021-2022.
2nd year maintenance of fruit bearing plants to create habitat for wildlife plot adjoining nepli main road in Upper Nepli beat, Nepli range during 2021-2022
1st year maintenance of fruit bearing plants to create habitat for wildlife plot adjoining Nepli main road in Lower Nepli beat, Nepli range during 2021-2022
Prepration of flowering beds in the lawn of inspection hut in U/Nepli beat,Nepli Range during 2021-2022
Maintenance of lawn at Nepli Inspection Hut in U/Nepli Beat, Nepli Block,Nepli range during 2021-2022
Maintenance of last two years old plantation on hill top in U/Lower Nepli beats in Nepli Block, Nepli Range during 2021-2022
Watering to last two years old plantation in Upper & Lower Nepli beat, Nepli block, Nepli range during 2021-2022
Watering to new plantation in Upper & Lower Nepli beat, Nepli block, Nepli range during 2021-2022
Clearance & maintenance of approach ways to silt retention dams at various points in Upper Nepli Beat,Nepli Block, Nepli Range during 2021-22
Clearance & maintenance of approach ways to silt retention dams at various points in Lower Nepli Beat,Nepli Block, Nepli Range during 2021-22
Removal of Alluvium from Neem Wala Dam No. 1 to retain the water for wildlife in upper Nepli Beat, Nepli Block in Nepli Range during 2021-22
Removal of Alluvium from Neem Wala Dam No. 2 to retain the water for wildlife in upper Nepli Beat, Nepli Block in Nepli Range during 2021-22
Up keeping and cleaning of road surface and parking place from gate no.1 to causeway near range office in Lower Nepli Beat, Nepli Block, Nepli Range, during 2021-22
Night watch keepar duty at main entry gate no.2 in Lower Nepli Beat, Nepli Block,Nepli Range, during 2021-22.
Vigilant duty at gate adjoining village Saketri in Lower Nepli Beat, Nepli Block, Nepli Range, during 2021-22.
Vigilant duty in Upper Nepli Beat & Lower Nepli Beat, Nepli Block, Nepli Range, during 2021-22
Clearance of polythene waste in front area of Sukhna wildlife sanctuary in L/ Nepli Beat, Nepli Block, Nepli Range, during 2021-22
Night watch keepar duty at Nepli inspection hut in Upper Nepli Beat, Nepli Block,Nepli Range, during 2021-22.
Cleaning of six no. toilets on main entry gate and near range office ting of water from water tanker to fill 3 no.x1000 liter water storage capacity in each tank Lower Nepli Beat, Nepli Block, Nepli Range, during 2021-22
Vigilant duty at new entry gate no.1 in Lower Nepli Beat, Nepli Block, Nepli Range, during 2021-22
Vigilant duty at gate adjoining village Mahadevpur in Lower Nepli Beat, Nepli Block, Nepli Range, during 2021-22
Clearance and dressing of fire line in Upper and Lower Neplii beats in Nepli Block, Nepli Range during 2021-22
Vigilant duty during night time in Upper & Lower Nepli Beat, Nepli Block, Nepli Range, during 2021-202
Opening of Nepli main choe bed at various mandering points to avoid bank cutting in L/Nepli Block, Nepli Range during 2021-22
5th year maintenance of CAMPA plantation planted in l/nepli beat during 2016-2017 in lieu of permission granted to remove 108 nos. trees for p.g.i. project during 2013-14, in l/Nepli Beat, Nepli Block, Nepli Range during 2021-22.
3rd year maintenance of CAMPA plantation planted in l/nepli beat during 2018-2019 in lieu of permission granted to remove 108 nos. trees for p.g.i. project during 2013-14, in l/Nepli Beat, Nepli Block, Nepli Range during 2021-22
NAVPREET SINGH AND COMPANY
ABDUL GAFUR AND COMPANY
MS SAHADAR ALI CONTRACTOR
JAMEEL KHAN AND COMPANY
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .