Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹9.3 L
Closing Date
3 Sept 2021, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer EDD leh
Office of the Executive Engineer EDD Leh
Supply, Installation, Testing and Commissioning for creation of 100KVA Distribution Transformer Substation along with laying of HT/LT Line at Murgi of Nubra Section on full turnkey basis under District Capex 2021-22.
2021_PDNRE_3727_1
NIT NO 46 of ED Leh of DC of 2021-22
Open Tender
Electrical Works
Turn-key
60 days
LEH
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,000
Payable To Executive Engineer EDD Leh
Exempted
7 Sept 2021
15 Jul 2021
4 Sept 2021
16 Jul 2021
3 Sept 2021
16 Jul 2021
120 days
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.05 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.07 MB
SBDMurgiDC.pdf
Tender Documents • 0.63 MB
BOQ_9229.xls
BOQ • 0.32 MB
TRansformerGTPTechSpecs.pdf
Additional Documents • 0.18 MB
AneexuresandDrawings.pdf
Additional Documents • 7.18 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .