| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹2.7 LAccepted-AOC | L-1 | Accepted-AOC Accepted as the bidder attains L-1 status | |
| 2 | L-2₹3.0 L+₹74,170 (32.8%)Rejected-Finance AT PO NEAR SAHID CHOUK TANDWA DISTT CHATRA JHARKHAND 825321 | CHATRA | JHARKHAND | 825321 | L-2 | Rejected-Finance Rejected as the bidder attains L-2 status | |
| 3 | L-3₹3.1 L+₹84,450 (37.4%)Rejected-Finance 42 11 DIPKA PALI ROAD DIPKA DIPKA KORBA CHHATTISGARH 495452 | KORBA | CHHATTISGARH | 495452 | L-3 | Rejected-Finance Rejected as the bidder attains L-3 status | |
| 4 | L-4₹4.4 L+₹2.1 L (93.2%)Rejected-Finance 0 GOPAL GANJ CHABUTRA KE SAMNE PRATAPGARH PRATAPGARH PRATAPGARH RAJASTHAN 312605 | PRATAPGARH | RAJASTHAN | 312605 | L-4 | Rejected-Finance Rejected as the bidder attains L-4 status |
Tender Value
₹5.5 L
EMD Value
₹6,900
Closing Date
2 Mar 2025, 5:00 pmClosed
Staff Officer (EnM)
Office of the General Manager, Dipka Area, Ph. No. 9424141353
Replacement of faulty lightning arresters and revival of its earthen system at 33 KV Main and Old substation and receiving end of various sector substation, 6.6 KV/3.3 KV/433 V installed at different location in Dipka Expansion Project.
2025_SECL_329011_1
SECL/GM/DA/SO(EnM)/ e-tender/24-25/82 dtd-13/02/25
Open Tender
Electrical and Maintenance Works
Item Rate
15 days
Dipka Expansion Project, Dipka Area
Please refer to tender documents
5 documents required · 5 mandatory
₹6,900
6 Apr 2025
14 Feb 2025
4 Mar 2025
14 Feb 2025
2 Mar 2025
15 Feb 2025
14 Feb 2025 - 21 Feb 2025
Amount
Providing and erection of non-linear resistor type lightning arrester suitable for 6.6 KV overhead line, complete set (one set consisting of 3 no's of lightning arresters) rating 6 KV, 10 KA with clamps and nut-bolts etc. as required. To be installed at starting & receiving point (at last pole of overhead line) of the substation.
Providing and erection of non-linear resistor type lightning arrestor suitable for 3.3 KV overhead line, complete set (one set consisting of 3 no's of lightning arrestors) rating 3 KV, 10 KA with clamps and nut-bolts etc. as required. To be installed at starting & receiving point (at last pole of overhead line) of the substation.
Earthing with G.I. earth plate 600 mm X 600 mm X 6 mm thick including accessories, and providing masonry enclosure with cover plate having locking arrangement and watering pipe of 2.7 metre long etc. with charcoal/ coke and salt as required.
Supplying and laying 25 mm X 5 mm G.I strip at 0.50 metre below ground as strip earth electrode, including connection/ terminating with G.I. nut, bolt, spring, washer etc. as required. (Jointing shall be done by overlapping and with 2 sets of G.I. nut bolt & spring washer spaced at 50mm)
Note: 1). The estimated cost is excluding CMPF @ 12% and CMPS @ 7%. These statutory payment as applicable shall be reimbursed to the contractor on production of proof of payment limited to the maximum likely number of workmen to be deployed per day is 05 nos. 2). Test report from NABL/ Any Govt. laboratory as per the relevant india standard is required. The test report should not be older than 5 years from date of opening and the test report must consist of the following tests :- i). Lightning impulse voltage withstand test. ii). Power frequency voltage withstand test (Dry) iii). Heat dissipation test iv). Test to verify long term stability under continuous operating.
Total impact of GST for the purpose of CTC
AJAY ENTERPRISES (BID ID -1134483)
SHASHI BHUSHAN SINGH (BID ID -1130925)
V R ENTERPRISES (BID ID -1132208)
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .