| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.6 LAccepted-Finance CHAITALI NIWAS OPP PANCHAMOTI HOUSING SOCIETY VIJAY NAGAR DEOLALI CAMP NASHIK 422401 | NASHIK | MAHARASHTRA | 422401 | L1 | Accepted-Finance BEING L1 | |
| 2 | L2₹29.2 L+₹3.6 L (13.9%)Accepted-Finance | L2 | Accepted-Finance NOT BEING L1 | |
| 3 | L3₹29.8 L+₹4.2 L (16.2%)Accepted-Finance | L3 | Accepted-Finance NOT BEING L1 |
| Sl No | Description | Qty | Unit | M/S KANNANS L1 | SHREE SAMARTH SERVICES L2 | M/S Nilesh Enterprises L3 |
|---|---|---|---|---|---|---|
| 1.00 | Surface dressing not exc 15cm deep in soft/loose soil. | 67.58 | Square Metre | 30 ₹2,027.4 | 10 ₹675.8 Lowest | 40 ₹2,703.2 |
| 2.00 | Surface excavation averaging 15cm deep and n.exc 30cm deep and getting out in hard / dense soil complete all as specified and directed. | 137 | Square Metre | 40 ₹5,480 | 15 ₹2,055 Lowest | 420 ₹57,540 |
| 3.00 | Clearing the site by grubbing of tree stumps/trunks, roots, vegetation, bushes, shrubs, and organic matter from the ground surface, including complete cleaning and disposal of excavated/unwanted material outside MD land complete all as directed. the site limits | 3 | Each Job | 500 ₹1,500 Lowest | 2,050 ₹6,150 | 2,450 ₹7,350 |
| 4.00 | Excavation over areas not exc 1.5m deep and getting out in hard/dense soil complete all as specified and as directed | 53.61 | Cubic Metre | 220 ₹11,794.2 | 150 ₹8,041.5 Lowest | 375 ₹20,103.75 |
| 5.00 | Excavation in trenches and not exe. 1.5 m wide and not exe. 1.5 m in depth for foundation of drain, man hole , laying of UG cables etc. not exe. 10 Sq. m on plan and not exe. 1.5 m depth and getting out in soft / loose soil complete all as specified and directed. (Note : During excavation, whether carried out manually or mechanically, if any AFNET cable, signal cable, HT/LT cable, communication cable, water supply line, sewage line, or any other underground utility is damaged due to the fault, negligence, or actions of the contractors working people for whatsoever reason , the contractor shall repair, restore, or replace the damaged utility and make it good to its original specifications and functional condition, without any extra cost to Govt). | 172.37 | Cubic Metre | 220 ₹37,921.4 Lowest | 275 ₹47,401.75 | 350 ₹60,329.5 |
| 6.00 | All same as per item No 5 here-in-above but excavation in hard/dense soil -do - | 71.76 | Cubic Metre | 250 ₹17,940 | 199 ₹14,280.24 Lowest | 555 ₹39,826.8 |
| 7.00 | Returning filling in trenches including spreading, leveling, watering and well ramming in layers not exceeding 25 cm thick in soil complete all as specified and directed. | 197.56 | Cubic Metre | 35 ₹6,914.6 Lowest | 40 ₹7,902.4 | 90 ₹17,780.4 |
| 8.00 | Removal of excavated soil/ material to a distance not exc 250 metre and depositing where directed at a level not exc 1.50 metre above the starting point complete all as specified | 20.45 | Cubic Metre | 80 ₹1,636 | 20 ₹409 Lowest | 100 ₹2,045 |
| 9.00 | Removing excavated surplus soil to a distance exceeding 500 mts and depositing where directed .at a level not exceeding 1.5 M above the starting point complete all as directed | 80.55 | Cubic Metre | 80 ₹6,444 | 20 ₹1,611 Lowest | 150 ₹12,082.5 |
| 10.00 | M&L for anti-termite treatment to the backfill in contact with foundation at the rate of 7.5 litres of emulsion per square metre of vertical surface (Area of the substructure in contact with backfill to be measured) complete all as specified & as directed | 50 | Square Metre | 95 ₹4,750 | 90 ₹4,500 Lowest | 100 ₹5,000 |
Tender Value
₹25.8 L
EMD Value
₹51,600
Closing Date
9 Jul 2026, 6:00 pmClosed
GE AF OJHAR
GE AIRFORCE OJHAR AIR FORCE STATION POST OJHAR DIST NASHIK 422221
PROVISION OF GENRAL STORE AND ALLIED WORKS AT SMC 25 ED AFS DEOLALI
2026_MES_763563_2
8419/E8
Open Tender
Civil Works - Others
Item Rate
180 days
GE AF OJHAR
Please refer tender documents
8 documents required · 8 mandatory
₹500
GE AF OJHAR
₹51,600
Yes
13 Jul 2026
12 Jun 2026
11 Jul 2026
12 Jun 2026
9 Jul 2026
20 Jun 2026
12 Jun 2026 - 19 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Surface dressing not exc 15cm deep in soft/loose soil. | 67.58 | Square Metre | - | - |
| 2 | Surface excavation averaging 15cm deep and n.exc 30cm deep and getting out in hard / dense soil complete all as specified and directed | 137 | Square Metre | - | - |
| 3 | Clearing the site by grubbing of tree stumps/trunks, roots, vegetation, bushes, shrubs, and organic matter from the ground surface, including complete cleaning and disposal of excavated/unwanted material outside MD land complete all as directed. the site limits | 3 | Each Job | - | - |
| 4 | Excavation over areas not exc 1.5m deep and getting out in hard/dense soil complete all as specified and as directed | 53.61 | Cubic Metre | - | - |
| 5 | Excavation in trenches and not exe. 1.5 m wide and not exe. 1.5 m in depth for foundation of drain, man hole , laying of UG cables etc. not exe. 10 Sq. m on plan and not exe. 1.5 m depth and getting out in soft / loose soil complete all as specified and directed. | 172.37 | Cubic Metre | - | - |
| 6 | All same as per item No 5 here-in-above but excavation in hard/dense soil -do - | 71.76 | Cubic Metre | - | - |
| 7 | Returning filling in trenches including spreading, leveling, watering and well ramming in layers not exceeding 25 cm thick in soil complete all as specified and directed. | 197.56 | Cubic Metre | - | - |
| 8 | Removal of excavated soil/ material to a distance not exc 250 metre and depositing where directed at a level not exc 1.50 metre above the starting point complete all as specified | 20.45 | Cubic Metre | - | - |
| 9 | Removing excavated surplus soil to a distance exceeding 500 mts and depositing where directed .at a level not exceeding 1.5 M above the starting point complete all as directed | 80.55 | Cubic Metre | - | - |
| 10 | M&L for anti-termite treatment to the backfill in contact with foundation at the rate of 7.5 litres of emulsion per square metre of vertical surface (Area of the substructure in contact with backfill to be measured) complete all as specified & as directed | 50 | Square Metre | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
BOQ_864140.xls
BOQ • 1.73 MB
Tender8419.pdf
Tender Documents • 1.02 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .