Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹55.9 CrAdmitted-Finance | ₹55.9 Cr | L1 | Admitted-Finance |
| 2 | L2₹65.3 CrAdmitted-Finance | ₹65.3 Cr | L2 | Admitted-Finance |
| 3 | L3₹67.6 CrAdmitted-Finance | ₹67.6 Cr | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | Rejected-Technical Non responsive |
| Sl No | Description | Qty | Unit | Manda Projects Pvt Ltd L1 | M/s Dhani Ram Ram Chander L3 | Kaveri Engineering Projects Pvt Ltd L2 |
|---|---|---|---|---|---|---|
| 1.00 | Uprooting Juli Flora /sarkanda Uprooting Juli Flora /sarkanda, pahari kikar or arrows upto 0.50m. depth below ground level. | 5,51,844.4 | Sqm | 6 ₹33.1 L | 6.75 ₹37.2 L | 7.36 ₹40.6 L |
| 2.00 | Bush or jungle clearance from side slopes of lined channels with Khurpa. | 61,920 | RMt | 5 ₹3.1 L | 5.1 ₹3.2 L | 5.56 ₹3.4 L |
| 3.00 | Collection of kattals, brick bats etc. from bed including stacking of collected material out side of the canal. | 250 | Cum | 30 ₹7,500 | 33 ₹8,250 | 36 ₹9,000 |
| 4.00 | Construction of Bench Mark muttam of size 30x30x75 cms in cement concrete (1:3:6) with 750 mm long 25x25x4 mm. MS angle iron embedded including cost of material, curing, transportation and fixing at site with all leads and lift complete. | 130 | Each | 550 ₹71,500 | 545 ₹70,850 | 594.6 ₹77,298 |
| 5.00 | Dismantling upto 1.5m in foundation and/or 1.5m above ground level including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material, and stacking serviceable material within a lead of 1000m. [MoRTH Specification clause 202] Removing hume pipes class NP3/NP4 Above 900 mm dia | 4,150.42 | Cum | 200 ₹8.3 L | 219 ₹9.1 L | 238.93 ₹9.9 L |
| 6.00 | Dismantling upto 1.5m in foundation and/or 1.5m above ground level including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material, and stacking serviceable material within a lead of 1000m. [MoRTH Specification clause 202] Dismantling Brick/Tile work In cement mortar | 7,260.9 | Cum | 200 ₹14.5 L | 179 ₹13.0 L | 195.29 ₹14.2 L |
| 7.00 | Dismantling of lining and disposing of the material with in 1/2 km lead double tile lining | 1,741.04 | Sqm | 50 ₹87,052 | 50 ₹87,052 | 54.55 ₹94,973.73 |
| 8.00 | Earth work excavation in ordinary soil for main canal and branches having discharge 10 cumecs and above; Kassi work undressed. | 4,90,050.29 | Per | 60 ₹2.9 Cr | 20 ₹98.0 L | 49.1 ₹2.4 Cr |
| 9.00 | Earthwork rehandling undressed, Kassi work. | 1,454.26 | Cum | 20 ₹29,085.20 | 16.5 ₹23,995.29 | 18 ₹26,176.68 |
| 10.00 | Add extra for earth taken from private land, land to be arranged by the contractor through private negotiations. Item applicable on certification by Ex. En. that no earth is available within canal boundary. for uncommand area | 3,59,050.73 | Cum | 20 ₹71.8 L | 1 ₹3.6 L | 12 ₹43.1 L |
Tender Value
₹60.0 Cr
EMD Value
₹1.2 Cr
Closing Date
10 Aug 2023, 6:00 pmClosed
Chief Engineer
Office of the Chief Engineer Water Resources(North) Hanumangarh
Rehabilitation of different reaches of various canals of Sidhmukh Irrigation project sub-project. District Hanumangarh
2023_WRDAS_347660_1
CE_NIB_01_2023-24
Open Tender
Civil Works
1095 days
Hanumangarh Distt.
As per bid documents
3 documents required · 3 mandatory
₹20,000
Executive Engineer, Water Resources Division
₹1.2 Cr
Yes
Hanumangarh
6 Oct 2023
4 Jul 2023
11 Aug 2023
4 Jul 2023
10 Aug 2023
4 Jul 2023
4 Jul 2023 - 12 Jul 2023
12 Jul 2023
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.98 MB
BiD_DoC_B_SiD.pdf
Tender Documents • 3.82 MB
BOQ_618360.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid