| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Admitted-Finance | Admitted-Finance |
Tender Value
₹27 L
EMD Value
₹27,000
Closing Date
12 Aug 2020, 2:00 pmClosed
SE GCC CBE
182,DR.SUBBARAYAN STREET, TATABAD, COIMBATORE DT - 641 012.
18/2020-21 of SE GCC CBE
2020_EB_173995_1
18/2020-21 of SE GCC CBE
Open Tender
Civil Works
Item Wise
90 days
coimbatore
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹27,000
Yes
26 Aug 2020
30 Jul 2020
12 Aug 2020
30 Jul 2020
12 Aug 2020
30 Jul 2020
Amount
Clearing Light Jungle and disposed away from the site as per direction of Engineer incharge including Cost of labour,lead,lift,etc,complete
Earth work excavating and depositing on bank with initial lead of 10m and initial llift of 2.0m in hard stiff clay , Stiff black cotton soil, hard red earth, shales, Murram, gravel, stoney earth mixed with small size boulders etc., as per standard specification complete..( Levelling the Site )
Earth work excavation in hard gravelly soil. Stiff black cotton soil, hard red earth, shales, Murram, gravel, stoney earth mixed with small sized boulders etc., complete as per standard specification. (For Foundation)
Supplying and filling with M. sand for foundation and basement including cost of sand, filling charges as per standard specification (watering & consolidation) with all leads and lifts as per standard specification, etc., complete.
Plain cement concrete in CC 1:3 :6 using 20 mm HBG metal for padding concrete including cost of cement, all materials, labour charges consolidation, curing, all leads, lifts, as per standard specification etc., complete.
RCC in CC 1:1 1/2:3, mix using 12 to 20 mm HBG machine crushed metal for raft concrete without form work including cost of cement, all materials labour, curing, all leads & lifts, vibrating charges, as per standard specification, etc., complete. ( but excluding cost of steel reinforcement)
Plain cement concrete in CC 1:2 :4 using 20mm HBG metal with out form work, including cost of cement, all materials, labour charges including consolidation, curing, all leads, lifts, as per standard specification etc., complete.
Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid)
Supplying and filling in gravel for foundation and basement including cost of gravel, filling charges as per standard specification (watering & consolidation) with all leads and lifts as per standard specification, etc., complete.
Supplying and fabrication of template and Labour charge for fixing template in correct level and alignment etc complete
Supplying and Fabrication of 20mm dia sizes of M.S grouting bolt including cutting, bending, threading 1.20 m length including galvanizaion and providing 2 nos. nuts with washer etc and fixing them in plinth including cost of material, Labour lead, lift, etc., complete, as per standard specification.
Providing steel reinforcement RTS rods of approved brand for all RCC works, including cost of steel RTS rods, binding wire, labour charges for cutting, straightening bending as per type design drawing, placing aligning, and tying properly with all leads and lift as per standard specification, etc., complete
Plastering with CM 1:3, 12mm thick, including cost of cement, labour, curing, all leads and lifts etc., complete. as per standard specification
colour washing with two coats of cement paint over one coat of white cement of approved quality and colour on exterior surfaces including through scrapping, clean removal of dirt, cost of all materials, scaffolding, Labour, Lead, Lift etc., complete and including necessary crack filling paste, where ever required.
Disposal of excavated earth away from site,including spreading and levelling labour, lead, lift as per standard specification, etc., complete.
SGST to be quoted in Percentage (value alone)Ex. 9%, it should be entered as 9 only
CGST to be quoted in Percentage (value alone)Ex. 9%, it should be entered as 9 only
Inter-state GST @18% for other than Tamil Nadu supplier. If the contractor is within Tamil Nadu may be quoted as "0" only
S RATHIKA CONSTRUCTIONS
GOLDEN CONSTRUCTIONS
MSS CONTRACTORS
ARAVIND ASSOCIATES
m r and co
JERALIN JERISH
ASAITHAMBI.M
MK DHANALAKSHMI ENGINEERING PRIVATE LIMITED
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .