Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.2 LAdmitted-Finance | -20.52% | ₹1.2 L | L1 | Admitted-Finance |
| 2 | L2₹1.4 L+₹19,464.22 (15.6%)Admitted-Finance | -7.98% | ₹1.4 L+₹19,464.22 (15.6%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/s. Geetika Construction L1 | satish kumar sharma contractor L2 |
|---|---|---|---|---|---|
| .01PART- B (Item Rate Basis) | |||||
| 1.00 | Cleaning of roof of various bldg including brooming of surface by broom neatly clean the surface by removing the dust and other unwanted material laid on surface by manually, and dispose the rubbish dust and other material outside the campus including all required labour T&P and as per directions of engineer in charge. | 1,000 | P.Sqm | 7 ₹7,000 Lowest | 7.9 ₹7,900 |
Tender Value
₹2 L
EMD Value
₹4,000
Closing Date
24 Aug 2026, 3:00 pmClosed
SE CIVIL JVVNL
SE CIVIL JVVNL OPH, RAM MANDIR BANI PARK JAIPUR
Roof leakage treatment of residential and non-residential buildings of JVVNL under Bharatpur Circle.
2026_JVVNL_591577_28
E-NIT 11/2026-27
Open Tender
Civil Works
Percentage
60 days
Bharatour
Please refer Tender documents.
3 documents required · 3 mandatory
₹236
AO(O and M) JVVNL BTP Through NEFT/RTGS/IMPS/UPI
₹4,000
Yes
27 Aug 2026
22 Aug 2026
25 Aug 2026
22 Aug 2026
24 Aug 2026
22 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.001 | PART-A (Bldg.) | - | - | - | - |
| 1 | B-14/14.55: Dismantling old plaster or skirting, raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 meter lead. | 20 | Sqm | 17 | ₹340 |
| 2 | B-12/12.3 : Plaster on new surface on walls in cement sand mortar 1:6 including racking of joint etc. complete fine finish : : B-12/12.3.2 : 20mm thick. | 20 | Sqm | 228 | ₹4,560 |
| 3 | B-10/10.22 Providing gola 75x75 mm in cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 stone aggregate 10mm and down gauge) including finishing with cement mortar 1:3 (1 cement : 3 fine sand) as per standard design : | 20 | Mtr. | 122 | ₹2,440 |
| 4 | B-3/3.8 : Providing & fixing precast cement concrete coping 1 : 2 : 4 mix 50mm thick complete as per specification : | 3 | sqm | 440 | ₹1,320 |
| 5 | B-15/15.29: Providing and Applying ACRYLIC emulsion polymer waterproofing chemical coating, on over roof on over roof slabs/terrace/balconies/parapet wall etc.with following method/specification:
Paint the surface with regular paint brush so as to obtain approximately 0.3mm thickness coating. apply the 2nd coat next day at right angles to the 1st coat so that total thickness of the coating should be approximately 0.6mm coverage by using above formulation will be 40 ft2/ litre of chemical. painted surface does not require any external water curing since chemical will hold sufficient water for curing.After the primer coat Apply 2 coats of modified acrylic emulsion polymer water proofing compound having solar heat reduction properties coating @ 0.330 KG/SQM on the surface of the interval of 3-4 hours. Undulation on the surface is repair before the waterproofing work. | 220 | Sqm | 579 | ₹1,27,380 |
| 6 | B-12/12.7 : Finishing with neat cement (punning). | 300 | Sqm | 40 | ₹12,000 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.11 MB
Tendernotice_2.pdf
PDF • 2.31 MB
BOQ_1050949.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .