| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.3 LAccepted-AOC 37 B PHASE 3 INDUSTRIAL ESTATE GANGYAL JAMMU | ₹9.3 L | L1 | Accepted-AOC lowest bidder |
| 2 | L2₹9.3 LRejected-AOC JAMMU AND KASHMIR | ₹9.3 L | L2 | Rejected-AOC not lowest bidder |
| 3 | L3₹10.0 LRejected-AOC HOUSING COLONY UDHAMPUR | UDHAMPUR | JAMMU AND KASHMIR | 182101 | ₹10.0 L | L3 | Rejected-AOC not lowest bidder |
| 4 | L4₹10.0 LRejected-AOC 0 0 0 NEAR DAK BUNGLOW NH 1 A NH 1A UDHAMPUR UDHAMPUR JAMMU KASHMIR 182101 UDYAM JK 22 0002496 01AFRPJ1985K1Z4 R M | UDHAMPUR | JAMMU AND KASHMIR | 182101 | ₹10.0 L | L4 | Rejected-AOC not lowest bidder |
| Sl No | Description | Qty | Unit | M/S K S ENGG WORKS L1 | Shivam enterprises L4 | M.S J K HYDRAULIC ENGGG AND FABRICATOR WORKS L3 | js electrical and machanical works L2 |
|---|---|---|---|---|---|---|---|
| 1.01 | Motorization of existing manually operated hoisting mechanism of Summer Gates of unit No. 06 installed at Tawi Pump House, Jammu by way of providing AC motor 5HP, 3 ph., 415 V, 50 cycle of 1000 RPM of reputed make (or equivalent as per site requirement) ,Reduction Gear mechanism of worm gear type of reputed make(confirming to relevant IS code)Which must be compatible with the capacity of motor in terms of operation and designed in such way that it must meet the criteria of required final optimum speed of gate with which it has to be moved during operation. Providing of standard make electromagnetic brake mechanism ,spring loaded type with suitable drum diameter and desired brake torque rating (conforming to relevant IS code) which must be compatible with the capacity of motor in terms of operation and having provision for various adjustments of tension springs of brake shoes as required as per site requirement. Providing of floating shafts to transmit the RPM of reduction gear to the existing hoisting mechanism when electrically operated. The floating shaft shall be provided in such a way that it can be easily disconnected when operation of hoisting mechanism is required manually or providing suitable arrangement for manual operation of gate in case of failure of power supply/electro mech. defect. Providing and fitting of suitable size platform using MS Plate/ ISMB-200 /channel etc as per Actual site requirement to accommodate the motor, reduction gear box and electromagnetic brakes. Installation of complete system i.e. motor, reduction gear, electromagnetic brakes , floating shaft and other accessories like coupling pulley sets ,nuts bolts. Providing and fitting of field traveling limit switch with reduction gear so as to restrict the hoisting and lowering of Summer Gate up to extreme positions. Fabrication, Providing and fitting of MS sheet canopy fixed with Suitable MS frame over motor to protect from water falling from the floor of the pump House. Providing & installation of floor/wall mounted IP54 indoor type electrical Control Panel Board suitable for motor installed for Motorised gate operation complete with TPN/MCCB of suitable rating for isolation/safety at incoming, reversing DOL starter for upward and downward movement of gate (having suitable rating contactors for main power, forward and reverse rotation of motor) suitable protection relay against overload, phase failure. MCB(2A) for control circuit protection push buttons for ON/OFF, upward, downward movement of gate , emergency stop and provided with Local/remote operation selector switch, limit switch wiring, suitable indications, voltmeter, ammeter and fitted in powder coated suitable size CRCA enclosure hinged door with lock and complete with wiring .Fitting on MS sheet /angle frame. Repairs and servicing of summer and winter gate of unit no 6 at Tawi pump House Jammu it involves servicing and checking, cleaning of intermediate reduction gears, bearings, replacement of damaged bearings, and refilling new gear oil in reduction gear box and cleaning and greasing gears of winch machine . Repair/re-adjustment/ realignment / resetting of channel grooves for main gate and providing of additional strength to the channel grooves as and where required by removing weaken /cracked weld and rewelding. Cleaning metal surfaces of summer and winter gates and painting with one coat of anticorrosive primer and two coats of epoxy paint, cleaning all wire ropes and lubricating with cadmium compound. Complete job includes design, fabrication, installation including material cost, labour charges, carriage charges Testing and commissioning. Strengthening /Repairs/ servicing of Hoisting system of gates (motorized summer gate unit No. 01 to 05) and winter gates installed at Tawi Pump House, Jammu. Cleaning and lubrication of all the intermediate reduction gears and bearings. Replacement of damaged bearings, oil seals, refilling new gear oil. The job also includes replacement of worn-out brake leathers and rivets of electromagnetic brakes, replacement of tension springs. Dismounting 05 nos. motors from platform, shifting to workshop for repairs. Complete rewinding of stator of 5 HP, 415 V AC motor -01 No. by way of extraction of burnt out coils, P/F new coils wound of requisite gauge copper wire using suitable superior quality insulation material, varnishing and drying under controlled temperature. Job includes greasing of bearings, replacing damaged bearing -01 no and re assembling of motors. Complete servicing of other 5HP motors 415 volt -04 no’s. by way of dismantling, cleaning, varnishing and drying under controlled temperature to achieve proper IR value, cleaning and re greasing of bearings. Shifting back to Pump House installation of repaired motors, reduction gear, and electromagnetic brakes and floating shaft on base frame/ platform and fitting of traveling limit switch. Fabrication / Repair / readjustment / realignment / resetting of channel grooves for main gate and providing of additional strength to the channel grooves as and where required. Replacement of damaged contactors, overload relay, pushes buttons etc. Testing of complete system after installation. Complete servicing of winch machines of summer gates .cleaning and painting of steel wire ropes of the gates by way of cleaning ropes and applying two coat of cadmium compound. Cleaning metal surfaces of all the gates, applying one coat of anticorrosive primer and two coats of epoxy paint. Fabrication, Providing and fitting of MS sheet canopy fixed with Suitable MS frame over motor to protect from water falling from the floor of pump House. Complete job includes testing and commissioning of gates after repair works. The job includes cost of material(consume able /non consume able, like welding electrodes, gas for cutting, grease etc all included ), labour charges for skilled/ semiskilled/unskilled) and carriage charges, loading unloading ,shifting to site of installation, charges of all tools and tackles. | 1 | Job | 5,20,000 ₹5.2 L | 5,65,000 ₹5.7 L | 5,64,000 ₹5.6 L | 5,08,000 ₹5.1 L |
| 1.02 | Fabrication, providing and fitting new Trash of size 2.10 wide x 3.30 high (lower portion) for bay no.6. Frame fabricated out of MS angle 75x75x8 and inner members of trash rack comprises of MS flat 75x8 - 21 nos. which are supported by 03 Nos. equally spaced supports of MS flat of 75x8. Painted with one coat of red oxide primer and two coats of black enamel paint after cleaning and preparing surface for application of paint Installation of new trash rack in the groove of bay no.6. Job involves construction of temporary bund with the help gunny/ sand bags, de-watering the sump to carry out the work. Extraction of damaged trash rack by way of cutting of fasteners/embedded parts using tools and tackles clearing bay, making it ready for fitment of new trash rack. Shifting and lowering, placing and holding of New trash rack in the bay in river (approx. 50 feet below from the floor level of pump House) using gantry crane/ manual labour, special tools and tackles /making temporary arrangement. Fitting the trash rack with beam between upper and lower portion by fasteners and welding work and fixing it tightly with civil structure to hold it tightly in its position during all condition even during heavy floods. Replacement damaged strips of existing lower strip type trash racks of bay No. 01 of size 2.10 m × 3.30 m at Tawi Pump House, Jammu by way of extraction of damaged by cutting of fasteners, trash rack member ,lifting and shifting trash rack to safe working place/workshop for carrying out repair works. Cutting/Dismantling damaged/corroded/distorted inner vertical strips and frame work members of the trash rack with the help of gas cutter. Straightening of the framework member made out of MS Angle 75x75x8 with the help of power pressing, hammering etc. Providing and Fabrication of 24 Nos. inner vertical strips of length 1.57 m/e made out of MS flat of 75x8 mm-40.0 m in lieu of the badly damaged/corroded/missing ones and cutting partially damaged strips, straightening, refitting. Painting of trash rack with one coat of red oxide primer and two coats of black enamel paint after cleaning and preparing surface for application of paint. Shifting trash rack to lowering site and lowering and holding with the help of crane /special tools and tackles and placing and Fitting the trash rack with beam (which is fixed between upper and lower portion) by fasteners and welding work and fixing it tightly with civil structure to hold it solidly in its position during all condition /even during heavy floods. The complete job includes constructing temporary bunds from gunny/sand bags with the help of lift and lowering and placing by manual labour to control the flow of water (cost of gunny bags, sand , manual labour for sand filling , lifting, shifting, lowering and placing included )and deployment of dewatering pump to extract out the stagnant water from the sump so as to make the conditions suitable for extraction of trash rack and lowering and fitting of new and repaired trash racks after dismantling of the trash rack by way of cutting the fasteners and subsequently the embedded trash rack with the help of cutter and extraction of the damaged trash Rack segments from its grooves with the help of crane and manual labour and other equipments required and further removal of sand bags. The job is carried out with the help of skilled labour and special tools and tackles and making temporary arrange to carry out the job on inclined trash rack in the Tawi River. Providing and fitting of new strips in place of missing/badly damaged strips of existing upper strip type trash racks of size 2.10 mx1.83 m bay No. 01 to 06 at Tawi Pump House, Jammu by way of cutting partially damaged/ badly damaged strips from the frame of trash racks and taking to safe working place, straightening, refitting partially damaged strips and providing and fitting new strips in place of badly damaged /missing strips. The job is carried out with the help of skilled labour and special tools and tackles and making temporary arrange to carry out the job on inclined trash rack in the Tawi River.
The complete job detailed as under:
Bay No. 1: Cutting of 02 Nos. badly and 02 Nos. partially damaged strips. Straightening and refitting 02 nos. providing and fitting of 07Nos. new strips (02 Nos. in place of damaged ones and 05 No. in place of strips missing due to flash floods).
Bay No. 2: Cutting of 03 Nos. partially/badly damaged strip then providing and fitting of 06 Nos. new strips (01 Nos. in place of damaged ones and 05 Nos. in place of strips missing due to flash floods) and repairing 02 nos.
Bay No. 3: Cutting of 02 Nos. damaged strips and then providing and fitting of 06 Nos. new strips (02 Nos. in place of damaged ones and 04 Nos. in place of strips missing due to flash floods).
Bay No. 4: Cutting of 03 Nos. partially /badly damaged strips then repairing one and providing and fitting of 08 Nos. new strips (02 Nos. in place of damaged ones and 06 No. in place of strips missing due to flash floods).
Bay No. 5: Cutting of 05 Nos. partially/badly damaged strips then repairing 03 and providing and fitting of 07 Nos. new strips (02 Nos. in place of damaged ones and 06 Nos. in place of strips missing due to flash floods).
Bay No. 6: Cutting of 04 Nos. damaged strips then repairing 02 nos. and providing and fitting of 07 Nos. new strips (02 Nos. in place of damaged ones and 05 No. in place of strips missing due to flash floods).
The above job involves welding of MS angle iron and MS flat strips at equal distance using high-quality welding electrodes. Painting of trash racks with one coat of red oxide primer and two coats of black enamel paint. Shifting the repaired trash racks back to walkway and installation in the respective grooves of their bays. The complete job includes cleaning of grooves to accommodate trash racks, cost of welding electrodes, and charges for special tools and tackles required, labour charges including risk involved in execution of job. | 1 | Job | 1,96,000 ₹2.0 L | 2,48,000 ₹2.5 L | 2,47,000 ₹2.5 L | 2,35,000 ₹2.4 L |
| 1.03 | Fabrication of new mesh type trash racks, having outer dimensions of 2.22 m × 1.70 m. Outer frame of 75×75×6 mm angle iron with two equally-spaced horizontal support & inner frame using MS Flat of 65 x 6 mm. Drilling of holes on the angle iron frame for fitment of mesh. Providing of new mesh of size 50 x 50 using 04 mm GI wire and fitment of the same with fabricated frame and finally painted with two coats of black superior quality paint. Lowering and installation into the respective grooves. Complete job includes cost of material such as angle iron, MS flat, new mesh, nuts and bolts, cutting charges and labour involved. | 1 | Job | 1,45,300 ₹1.5 L | 1,20,000 ₹1.2 L | 1,20,000 ₹1.2 L | 1,15,000 ₹1.1 L |
| 1.04 | Repairs of gangway along 06 Nos. bays in the Tawi river by way of cutting of badly damaged members-06 Nos. And p/f 08 nos. new cross members in place of badly damaged/missing 02 members and fabrication and fitting 16 feet new gangway using horizontal both members of 50x50x6 mm angle and cross members of 40x40x5 mm, supporting members ISA 75x75x8 in place of washed away portion of gangway. Painting of gangway with single coat of red oxide and two coat of black paint of reputed brand. Job includes shifting, lowering and fitting the gangway with civil structures by suitable means to hold it firmly during all times i.e. floods etc.it includes cost of material, scaffolding and temporary arrangement for shifting, lowering, holding and fitting of gangway. | 1 | Job | 65,000 ₹65,000 | 71,000 ₹71,000 | 70,000 ₹70,000 | 70,000 ₹70,000 |
Tender Value
Refer Docs
EMD Value
₹19,958
Closing Date
20 Feb 2026, 1:00 pmClosed
EXECUTIVE ENGINEER RTIC JAMMU
EXECUTIVE ENGINEER RTIC JAMMU
Reconditioning of summer / winter gates, trash racks, walkway and various electro-mechanical machinery installed at TPH, Jammu.
2026_IFC_302860_1
E-NIT 45 OF 2025-26 DTD. 11-02-2026
Open Tender
Electrical and Maintenance Works
30 days
EXECUTIVE ENGINEER RTIC JAMMU
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
Yes
EXECUTIVE ENGINEER MECHANICAL DIVISION RTIC JAMMU
₹19,958
Yes
EXECUTIVE ENGINEER RTIC JAMMU
25 Feb 2026
11 Feb 2026
21 Feb 2026
11 Feb 2026
20 Feb 2026
13 Feb 2026
12 Feb 2026
Fabrication, providing and fitting new Trash of size 2.10 wide x 3.30 high (lower portion) for bay no.6. Frame fabricated out of MS angle 75x75x8 and inner members of trash rack comprises of MS flat 75x8 - 21 nos. which are supported by 03 Nos. equally spaced supports of MS flat of 75x8. Painted with one coat of red oxide primer and two coats of black enamel paint after cleaning and preparing surface for application of paint Installation of new trash rack in the groove of bay no.6. Job involves construction of temporary bund with the help gunny/ sand bags, de-watering the sump to carry out the work. Extraction of damaged trash rack by way of cutting of fasteners/embedded parts using tools and tackles clearing bay, making it ready for fitment of new trash rack. Shifting and lowering, placing and holding of New trash rack in the bay in river (approx. 50 feet below from the floor level of pump House) using gantry crane/ manual labour, special tools and tackles /making temporary arrangement. Fitting the trash rack with beam between upper and lower portion by fasteners and welding work and fixing it tightly with civil structure to hold it tightly in its position during all condition even during heavy floods. Replacement damaged strips of existing lower strip type trash racks of bay No. 01 of size 2.10 m × 3.30 m at Tawi Pump House, Jammu by way of extraction of damaged by cutting of fasteners, trash rack member ,lifting and shifting trash rack to safe working place/workshop for carrying out repair works. Cutting/Dismantling damaged/corroded/distorted inner vertical strips and frame work members of the trash rack with the help of gas cutter. Straightening of the framework member made out of MS Angle 75x75x8 with the help of power pressing, hammering etc. Providing and Fabrication of 24 Nos. inner vertical strips of length 1.57 m/e made out of MS flat of 75x8 mm-40.0 m in lieu of the badly damaged/corroded/missing ones and cutting partially damaged strips, straightening, refitting. Painting of trash rack with one coat of red oxide primer and two coats of black enamel paint after cleaning and preparing surface for application of paint. Shifting trash rack to lowering site and lowering and holding with the help of crane /special tools and tackles and placing and Fitting the trash rack with beam (which is fixed between upper and lower portion) by fasteners and welding work and fixing it tightly with civil structure to hold it solidly in its position during all condition /even during heavy floods. The complete job includes constructing temporary bunds from gunny/sand bags with the help of lift and lowering and placing by manual labour to control the flow of water (cost of gunny bags, sand , manual labour for sand filling , lifting, shifting, lowering and placing included )and deployment of dewatering pump to extract out the stagnant water from the sump so as to make the conditions suitable for extraction of trash rack and lowering and fitting of new and repaired trash racks after dismantling of the trash rack by way of cutting the fasteners and subsequently the embedded trash rack with the help of cutter and extraction of the damaged trash Rack segments from its grooves with the help of crane and manual labour and other equipments required and further removal of sand bags. The job is carried out with the help of skilled labour and special tools and tackles and making temporary arrange to carry out the job on inclined trash rack in the Tawi River. Providing and fitting of new strips in place of missing/badly damaged strips of existing upper strip type trash racks of size 2.10 mx1.83 m bay No. 01 to 06 at Tawi Pump House, Jammu by way of cutting partially damaged/ badly damaged strips from the frame of trash racks and taking to safe working place, straightening, refitting partially damaged strips and providing and fitting new strips in place of badly damaged /missing strips. The job is carried out with the help of skilled labour and special tools and tackles and making temporary arrange to carry out the job on inclined trash rack in the Tawi River. The complete job detailed as under: Bay No. 1: Cutting of 02 Nos. badly and 02 Nos. partially damaged strips. Straightening and refitting 02 nos. providing and fitting of 07Nos. new strips (02 Nos. in place of damaged ones and 05 No. in place of strips missing due to flash floods). Bay No. 2: Cutting of 03 Nos. partially/badly damaged strip then providing and fitting of 06 Nos. new strips (01 Nos. in place of damaged ones and 05 Nos. in place of strips missing due to flash floods) and repairing 02 nos. Bay No. 3: Cutting of 02 Nos. damaged strips and then providing and fitting of 06 Nos. new strips (02 Nos. in place of damaged ones and 04 Nos. in place of strips missing due to flash floods). Bay No. 4: Cutting of 03 Nos. partially /badly damaged strips then repairing one and providing and fitting of 08 Nos. new strips (02 Nos. in place of damaged ones and 06 No. in place of strips missing due to flash floods). Bay No. 5: Cutting of 05 Nos. partially/badly damaged strips then repairing 03 and providing and fitting of 07 Nos. new strips (02 Nos. in place of damaged ones and 06 Nos. in place of strips missing due to flash floods). Bay No. 6: Cutting of 04 Nos. damaged strips then repairing 02 nos. and providing and fitting of 07 Nos. new strips (02 Nos. in place of damaged ones and 05 No. in place of strips missing due to flash floods). The above job involves welding of MS angle iron and MS flat strips at equal distance using high-quality welding electrodes. Painting of trash racks with one coat of red oxide primer and two coats of black enamel paint. Shifting the repaired trash racks back to walkway and installation in the respective grooves of their bays. The complete job includes cleaning of grooves to accommodate trash racks, cost of welding electrodes, and charges for special tools and tackles required, labour charges including risk involved in execution of job.
Fabrication of new mesh type trash racks, having outer dimensions of 2.22 m × 1.70 m. Outer frame of 75×75×6 mm angle iron with two equally-spaced horizontal support & inner frame using MS Flat of 65 x 6 mm. Drilling of holes on the angle iron frame for fitment of mesh. Providing of new mesh of size 50 x 50 using 04 mm GI wire and fitment of the same with fabricated frame and finally painted with two coats of black superior quality paint. Lowering and installation into the respective grooves. Complete job includes cost of material such as angle iron, MS flat, new mesh, nuts and bolts, cutting charges and labour involved.
Repairs of gangway along 06 Nos. bays in the Tawi river by way of cutting of badly damaged members-06 Nos. And p/f 08 nos. new cross members in place of badly damaged/missing 02 members and fabrication and fitting 16 feet new gangway using horizontal both members of 50x50x6 mm angle and cross members of 40x40x5 mm, supporting members ISA 75x75x8 in place of washed away portion of gangway. Painting of gangway with single coat of red oxide and two coat of black paint of reputed brand. Job includes shifting, lowering and fitting the gangway with civil structures by suitable means to hold it firmly during all times i.e. floods etc.it includes cost of material, scaffolding and temporary arrangement for shifting, lowering, holding and fitting of gangway.
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.22 MB
2.pdf
Tender Documents • 0.39 MB
BOQ_982991.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid