Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.2 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹1.8 L+₹60,209.58 (51.8%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹3.0 L+₹1.8 L (156.0%)Admitted-Finance | L3 | Admitted-Finance |
Tender Value
₹2.9 L
EMD Value
₹5,880
Closing Date
4 Aug 2026, 4:00 pmClosed
XEN REW Kathua
XEN REW Kathua
Construction of T/Road from main road near Mata to Mohra Ganthela Pyt. Adhat
2026_RDPR_317755_1
e-NIT No.140/REW/K of 2026-27 Dated 24/07/2026
Open Tender
Civil Works
Percentage
90 days
DHAR MAHANPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Rural Development and Panchayati Raj
₹5,880
17 Aug 2026
24 Jul 2026
5 Aug 2026
24 Jul 2026
4 Aug 2026
24 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil 80% | 1,012 | m3 | 187.3 | ₹1,89,547.6 |
| 2 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.Ordinary Rock 20% | 255 | m3 | 392.8 | ₹1,00,164 |
| 3 | Providing and fixing inauguration plaque made of polished granite stone, size 600 mm × 450 mm × 20 mm (or as approved), including machine-cut edges, fine polish, includinh high-quality gold paint (weather-resistant), complete with border design, cleaning, curing, and all finishing work. The plaque shall be fixed on a cement concrete pedestal/wall using stainless-steel clamps/adhesive, including all labour, materials, tools, transportation, and incidental charges to complete the job as per engineer-in-charge directions. | 1 | nos | 5,000 | ₹5,000 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.88 MB
BOQ_1042885.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .