Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹11.1 LAdmitted-Fee/PreQual/Technical/Finance | -27.01% | ₹11.1 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹11.4 LAdmitted-Fee/PreQual/Technical/Finance | -25.01% | ₹11.4 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹12.1 LAdmitted-Fee/PreQual/Technical/Finance | -20.51% | ₹12.1 L | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹12.5 LAdmitted-Fee/PreQual/Technical/Finance | -17.61% | ₹12.5 L | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹15.2 L
EMD Value
₹30,344
Closing Date
5 Aug 2026, 6:00 pmClosed
EE WRD I BHILWARA
EE WRD I BHILWARA
Renovation Work Of Suliya Talab G.P.Suliya P.S.Kerera Dist.- Bhilwara
2026_WRDAS_578419_4
NIT-03/26-27/1428/WRD-I/BHL
Open Tender
Civil Works
Percentage
120 days
BHILWARA
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
AS NIT CONDITIONS
₹30,344
Yes
6 Aug 2026
28 Jul 2026
6 Aug 2026
28 Jul 2026
5 Aug 2026
28 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cutting & clearence of jungle, bushes, shrubs Ankra / Ipomoea , julieflora, typna, etc. on canal & bunds in dry moist / slushy conditions including disposal as per instruction of the Engineer in charge, Cost of wood has been deducted from rates and thus will be property of contractor after cutting.Ordinary | 5,000 | sqm | 1.45 | ₹7,250 |
| 2 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5 m and including dressing of excavated area, dewatering wherever required complete in all respect. Soft/Loose Soil
Soft/Loose Soil | 391.3 | cum | 76 | ₹29,738.8 |
| 3 | Supply of morrum or murda includes all lead and lefts | 300 | cum | 476 | ₹1,42,800 |
| 4 | Spreading of quarry rubbish / spalls / murranda to required grade & camber in layers not exceeding 15 cm. thickness (loose) as per specifications including dressing etc. complete. | 300 | cum | 32 | ₹9,600 |
| 5 | Providing and Laying in position of Cement concrete Nominal mix (1:3:6) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3coarse sand) and making good the joints excluding the cost of centering,shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto 20 mm | 28.65 | cum | 4,818 | ₹1,38,035.7 |
| 6 | Random rubble stone masonry (using R. R. stones where 75 % stones to be not less than 15 cm in size in any direction and weighing not less than 23 kg.) for foundation including curing all leads of all construction materials including curing etc. complete.
In cement sand mortar 1:6 | 28.75 | cum | 4,357 | ₹1,25,263.75 |
| 7 | Random rubble stone masonry (using R.R. stones where 75% stones to be not less than 15 cm in size in any direction and weighing not less than 23 Kg) for Superstructure including curing all leads of all construction materials including curign etc complete.
In cement sand mortar 1:6 | 116.6 | cum | 4,547 | ₹5,30,180.2 |
| 8 | Plaster in cement sand mortar 1:4 including racking of joints, smooth finishing & curing etc. complete including all leads of all construction materials , of thickness: 20 mm | 265 | Sqm | 299 | ₹79,235 |
| 9 | Providing and laying cement concrete coping in (1:2:4) with maximum size of crusher broken aggregate upto 20 mm including shuttering etc. with all leads of material complete in all respect in thickness of: 75mm | 22 | sqm | 480 | ₹10,560 |
| 10 | Providing, Fabrication, machining with straightening work of Guide Tee, Track, Sealing frame, Leaf frame or any part of gate's, complete as per drawing with testing, including cost of all materials, with machinery, labour, tools and tackles cutting, aligning, welding, finishing, cleaning etc., applying one coat of zinc rich epoxy primer and two coats of cold applied coal tar epoxy paint, etc., complete as per specifications and approved drawings with all lead and lifts, including packing & forwarding, transportation charges for structural steel components and other materials. | 1,000 | kg | 113.56 | ₹1,13,560 |
stage.html
html • 0.02 MB
finance_1027991.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.47 MB
Tendernotice_2.pdf
PDF • 0.67 MB
BOQ_1027991.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].