Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.4 LAccepted-AOC | ₹5.4 L | L1 | Accepted-AOC Quoted Lowest Rate |
| 2 | L2₹5.5 LRejected-Finance | ₹5.5 L | L2 | Rejected-Finance Quoted Higher Rate |
| 3 | L3₹5.5 LRejected-Finance TAKDAH T E DARJEELING | DARJEELING | DARJEELING | WEST BENGAL | ₹5.5 L | L3 | Rejected-Finance Quoted Highest Rate |
Tender Value
₹5.4 L
EMD Value
₹10,798
Closing Date
17 Feb 2026, 9:00 amClosed
Executive Engineer, PRDD, GTA
PANCHAYAT AND RURAL DEVELOPMENT DEPARTMENT, LUICES JUBLEE COMPLEX DARJEELING
Construction of Box Drain from Bikesh Gurung house to Bhim Kumari house, Hospital dara, Lamahatta GP, R.R.Dev.Block, GTA.
2026_GTA_1002614_2
19(NIeT)/PRDD (15CFC)/ZP/T/UtF)/GTA/2025-26
Open Tender
CIVIL WORKS
60 days
Rangli Rangliot Block
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹10,798
13 Apr 2026
10 Feb 2026
19 Feb 2026
10 Feb 2026
17 Feb 2026
10 Feb 2026
Earth work in excavation of foundation trenches or drains in all sorts of soil (including mixed soil but excluding laterite or sand stone) including removing, spreading or stacking the spoils within a lead of 75m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. .
(a) Depth of excavation not exceeding 1.500 mm.
Earth work in filling in foundation trenches or plinth with good earth in layers not exceeding 150 mm. including watering and ramming etc.layer by layer complete .(payment to be made on the basis of measurement of finished quantity of work).
(a) With earth obtained from excavation of foundation.
Laying 150 mm. to 200 mm. boulder soling including rough dressing hand packing and ramming down small pieces in the interstics without rolling but including ramming.
Cost of stone boulder 150 mm size delivered ans stacked at site.
(I) Cement concrete with graded stone ballast (40 mm size) excluding shuttering.In ground floor.
(B) With N.B variety stone metal.
(a) 1:3:6 proportion.
Plum Concrete work with 40 % Cement Concrete with 30 mm down graded stone metal and 60% stone boulder of size 150 mm and above, placed in position as directed excluding shuttering if any.
(i) (1:3:6) proportion.
Hire and labour charge for shuttering with centreing and necessary staging up to 4 m. using approved stout props and thick hard wood planks of approved thick ness with required bracing for concrete slabs, beams, columns, lintels curved or staight including fitting fixing and striking out after complection of works. (up to roof of ground floor).
( c ) 9 to 12 mm. thick approved quality ply board shuttering in any concrete work.
Add 18% GST
Add 1% Labour Cess
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
techsummary_2457384.pdf
BOQ Comparative Chart
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.22 MB
Tendernotice_2.pdf
PDF • 1.25 MB
BOQ_2457384.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid