Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-Finance 238 SHAPUR BANDORA PONDA GOA | PONDA | GOA | ₹1.1 Cr | L1 | Accepted-Finance L1 |
| 2 | L2₹1.3 CrRejected-Finance | ₹1.3 Cr | L2 | Rejected-Finance L2 |
Tender Value
₹1.4 Cr
EMD Value
₹2.7 L
Closing Date
13 May 2026, 3:00 pmClosed
Executive Engineer
WD-XVIII(R),PWD,Ponda-Goa.
Construction of road and reconstruction of culvert along with pathway at Madapai in V.P. Tivrem Orgao of Priol Constituency in Ponda Taluka. (Retender)
2026_PWD_29128_1
PWD/DIV.XVIII(R)/TECH/2026/F- 5/07/2026-27 LINE-2
Open Tender
Civil Works
210 days
Madapai in V.P. Tivrem Orgao of Priol
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
₹2.7 L
19 May 2026
7 May 2026
15 May 2026
7 May 2026
13 May 2026
7 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Demolishing R.C.C. work including stacking of steel bars & disposal of unserviceable within 50 mts. lead. | 65.25 | Cu m | 1,618 | ₹1,05,574.5 | 11 |
| 2Earthwork in excavation of foundation of structures of culverts, abutments piers, retaining walls etc. as per drawing and technical specification, in all types of strata comprising any of the material such as soil, silt sand, clay, gravel, murrum of all varieties shingles, pebbles all types of conglomerates, laterite rock etc soft rock, ordinary rock or disintegrated rock fissured shattered/ decomposed rock or weathered rock all such material as described under appendix to those specification either in full or in parts as the case may be adopting mechanical means (hydraulic excavator) or any approved method or methods as the case may be convenient or permitted inclusive of chiseling and wedging etc in all conditions such as dry, moist, saturated, submerged, foul condition etc including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing sides, ramming of bottoms, getting out the excavated soil/rock to be leveled and neatly dressed, | ||||||
| 2.01 | pumping and bailing out of water, back filling the excavated earth to the extent required and utilizing the remaining earth locally for road work, barricading, danger lightening, guarding and disposal of excavated earth as directed by the engineer in charge all complete including all leads and lifts and up to depth of excavation as per MoRT & H Specification 304. | 1,472.24 | Cu m | 25 | ₹36,806 | 13 |
| 3TRANSPORTATION AND CARRIAGE OF MATERIALS | ||||||
| 3.01 | (A) By Tipper truck including loading, unloading and stacking | - | - | - | - | 15 |
| 3.02 | ii) Earth by tipper truck upto 5.00 km | 1,472.24 | Cu m | 252.26 | ₹3,71,387.26 | 16 |
| 4 | Rubble packing with hard laterite stone under floors including watering, ramming & consolidating etc. in pipeline trenches and other foundation complete. | 322.67 | Cu m | 2,211 | ₹7,13,423.37 | 17 |
| 5Centering & shuttering including Strutting, Propping & removal of formwork for : | ||||||
| 5.01 | i) Foundations, Footings, Bases for columns and mass concrete | 2,218.36 | Sq.m. | 407 | ₹9,02,872.52 | 19 |
| 6Centering & shuttering including Strutting, Propping & removal of formwork for : | ||||||
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.92 MB
Tendernotice_2.pdf
PDF • 0.49 MB
BOQ_29561.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid