Loading…
Loading…
Tender Value
₹1.4 L
EMD Value
₹2,900
Closing Date
17 Jun 2026, 4:00 pmClosed
Executive Engineer RnB Division Gurez
Executive Engineer RnB Division Gurez
Realignment of pipe line along Wanpora-Markoot Road (Balance work)
2026_PWDJK_312117_1
Fresh E-NIT No 16 of 2026-27 EE-RnB-Grz-2058-64 E-tendering Dated-10-06-2026
Open Tender
Civil Works
20 days
Gurez
Please refer Tender documents.
5 documents required · 5 mandatory
₹200
Executive Engineer RnB Division Gurez
₹2,900
Executive Engineer RnB Division Gurez
11 Jun 2026
11 Jun 2026
18 Jun 2026
11 Jun 2026
17 Jun 2026
11 Jun 2026
15 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for oundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed 1 meter from cutting edge, All kinds of soil : | 51.93 | Cum | 479.3 | ₹24,890.05 |
| 2 | Providing and fixing G.I Pipes complete with G.I fittings excluding trenching and refilling etc.(external) 25mm dia GI | 170.69 | RM | 311.95 | ₹53,246.75 |
| 2.01 | 20mm dia GI | 170.69 | RM | 227.9 | ₹38,900.25 |
| 2.02 | 15mm dia GI | 91.44 | RM | 179.2 | ₹16,386.05 |
| 3 | Making connection of G.I. distribution branch with G.I. main of following sizes by providing and fixing Tee, including cutting and threading the pipe etc. complete. 25 to 40 mm nominal bore | 1 | RM | 730.25 | ₹730.25 |
| 4 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 46.74 | Cum | 218.4 | ₹10,208.02 |
| 5 | Carriage of materials from source to actual site of work by mechanical transport including loading ,unloading and stacking,complete. Pipes Avg lead 100kms. | 0.66 | MT | 1,149.13 | ₹758.43 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.86 MB
BOQ_1010324.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid