Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹62.7 LAdmitted-Fee/PreQual/Technical/Finance | -35.77% | ₹62.7 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹72.4 L+₹9.7 L (15.5%)Admitted-Fee/PreQual/Technical/Finance | -25.81% | ₹72.4 L+₹9.7 L (15.5%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹76.9 L+₹14.2 L (22.7%)Admitted-Fee/PreQual/Technical/Finance | -21.21% | ₹76.9 L+₹14.2 L (22.7%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹90.8 L+₹28.1 L (44.8%)Admitted-Fee/PreQual/Technical/Finance | -7.00% | ₹90.8 L+₹28.1 L (44.8%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-Name of work not mentioned on Treasury Challan |
Tender Value
₹97.6 L
EMD Value
₹2.0 L
Closing Date
24 Aug 2026, 6:00 pmClosed
Executive Engineer
RnB Division Kralpora
Construction of Retaining Wall at Govt. Degree College Kralpora
2026_PWDJK_319646_1
E tendering NIT No 28/RnB/Kralpora of 2026-27
Open Tender
Civil Works
Percentage
150 days
Kralpora
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,600
Executive Engineer RnB Division Kralpora
₹2.0 L
31 Aug 2026
5 Aug 2026
25 Aug 2026
5 Aug 2026
24 Aug 2026
5 Aug 2026
5 Aug 2026 - 18 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (Hydraulic excavator) (exceeding 30 cm in depth & 1.5 m in width as well as 10 sqm on plan) incld dressing of side slopes, disposal of excavated surplus earth upto all leads and lifts as directed by Engineer incharge at site disposed earth to levelled and neatly dressed, incld cutting of trees and removal of trunks etc. complete In all kinds of soils | 1,355 | Cum | 187.3 | ₹2,53,791.5 |
| 2 | Providing and laying of GSB using Nallah Muckmaterial for filling, including dressing of surface to required levels and grades. The work includes collection, carraige and stacking of nallah GSB from approved sources, spreading in layers not exceeding 225 mm in loose thickness, watering and compacting with vibratory Roller or any suitable means to achive required compaction and level. The finished surface shall be firm and properly set for further construction activities, the rate includes cost and carriage of all materials to site of work, with all leads, lifts, loading, unloading, stacking, haulage, and octori taxes. | 719 | Cum | 800 | ₹5,75,200 |
| 3 | Supply and filling of 60 mm graded gravel behind Retaining wall for drainage purposes, including spreading, ramming, watering and proper packing, complete in all respects, including cost and carriage of all materials to site of work, with all leads, lifts, loading, unloading, stacking, haulage, and octori taxes. | 256 | Cum | 1,000 | ₹2,56,000 |
| 4 | Supply and filling of dry stone soling in foundation trenches tightly handpacked with hand ramming, watering and compacting to required density including cost and carriage of all materials to site of work, with all leads, lifts, loading, unloading, stacking, haulage, and octori taxes. | 58.79 | Cum | 850 | ₹49,971.5 |
| 5 | Providing and laying in position cement concrete 1:4:8 grade (1 cement : 4 coarse sand : 8 graded stone aggregate 40mm nominal size) including curing but excluding the cost of centring and shuttering all work upto plinth level including cost and carriage of all materials to site of work, with all leads, lifts, loading, unloading, stacking, haulage, and octori taxes. | 46.11 | Cum | 5,500 | ₹2,53,605 |
| 6 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) including cost and carriage of all materials to site of work, with all leads, lifts, loading, unloading, stacking, haulage, and octori taxes. | 277.96 | Cum | 8,000 | ₹22,23,680 |
| 7 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement.1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) including cost and carriage of all materials to site of work, with all leads, lifts, loading, unloading, stacking, haulage, and octori taxes. | 146.16 | Cum | 9,743.7 | ₹14,24,139.19 |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars incl all leads, lifts, loading, unloading, stacking, costs and carriages incl Head load if any upto site of work complete job | 32,726.27 | Kg | 123.2 | ₹40,31,876.46 |
| 9 | Centring and shuttering of kit ply including propping, strutting & removal of the same in Foundations, footings, bases of columns etc. for mass concrete complete job | 348 | Sqm | 286.35 | ₹99,649.8 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form work for Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. | 696 | Sqm | 628.95 | ₹4,37,749.2 |
stage.html
html • 0.02 MB
finance_1059516.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
BOQ_1059516.xls
BOQ • 0.38 MB
Extension28.pdf
PDF • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .