| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAdmitted-Finance | ₹1.5 Cr | L1 | Admitted-Finance |
| 2 | Rejected-Technical | - | - | Rejected-Technical Not Qualified as per NIT and SBD Criteria |
| 3 | Rejected-Technical | - | - | Rejected-Technical Not Qualified as per NIT and SBD Criteria |
| Sl No | Description | Qty | Unit | SHREE ABIRAMI ENGGINEERING WORKS L1 |
|---|---|---|---|---|
| 1.00Supply of Material for overhauling of Transformer (duly authenticated by OEM M/S BHEL) | ||||
| 1.01 | Set of Hardware ( as per list enclosed in SBD as Annexure-I ) | 1 | Set | 2,12,400 ₹2,12,400 Lowest |
| 1.02 | 25 Mtr. 16 mm dia nitrile rubber cord for top & bottom tank. | 1 | Set | 2,12,400 ₹2,12,400 Lowest |
| 1.03 | Set of Gasket (for HV Bushing , IV Bushing , LV /tertiary Bushing , Neutral Bushing , HV Turret , LV Turret , Inspection covers , radiator , conservator tank , Buchholz relay , PRV Relay , OSR , Oil pump , Valves and OLTC )along with nylon washers (1/2,1/4,1 inch) etc. | 1 | Set | 5,31,000 ₹5,31,000 Lowest |
| 1.04 | Oil Seals ( for HV Bushing , IV Bushing and OLTC) | 1 | Set | 1,59,300 ₹1,59,300 Lowest |
| 1.05 | Bushing Oil | 50 | ltrs | 138.06 ₹6,903 Lowest |
| 1.06 | Radiators (5 Flute, 32 Elements, 2630 mm Valve Centre ) | 8 | Nos. | 5,31,000 ₹42,48,000 Lowest |
| 1.07 | Neutral CT. | 1 | No. | 63,720 ₹63,720 Lowest |
| 1.08 | Crepe Paper | 50 | Kg | 1,062 ₹53,100 Lowest |
| 1.09 | Press Board | 400 | Kg | 1,062 ₹4,24,800 Lowest |
Tender Value
₹1.4 Cr
EMD Value
₹2.8 L
Closing Date
2 Nov 2022, 4:00 pmClosed
Executive Engineer TLMD -II Gladni
office of the Executive Engineer TLMD -II Gladni Jammu
Capital maintenance of 160MVA 220/132KV Auto Transformer at 710MVA 220/132/33KV Grid station Gladni
2022_PDD_186856_1
TLMD-II/J/09 of 2022-23 dated 03-09-2022
Open Tender
Electrical Works
Turn-key
120 days
Gladni
As per NIT and SBD
3 documents required · 3 mandatory
₹5,000
office of the Executive Engineer TLMD -II Gladni J
₹2.8 L
office of the Ex Engineer TLMd -II Gladni Jammu
18 Nov 2022
5 Sept 2022
4 Nov 2022
6 Sept 2022
2 Nov 2022
20 Sept 2022
8 Sept 2022 - 14 Sept 2022
16 Sept 2022
Amount
Supply of Material for overhauling of Transformer (duly authenticated by OEM M/S BHEL)
Set of Hardware ( as per list enclosed in SBD as Annexure-I )
25 Mtr. 16 mm dia nitrile rubber cord for top & bottom tank.
Set of Gasket (for HV Bushing , IV Bushing , LV /tertiary Bushing , Neutral Bushing , HV Turret , LV Turret , Inspection covers , radiator , conservator tank , Buchholz relay , PRV Relay , OSR , Oil pump , Valves and OLTC )along with nylon washers (1/2,1/4,1 inch) etc.
Oil Seals ( for HV Bushing , IV Bushing and OLTC)
Bushing Oil
Radiators (5 Flute, 32 Elements, 2630 mm Valve Centre )
Neutral CT.
Crepe Paper
Press Board
HV Bushing -245 KV 1250A, 600 CT Length (OIP)
IV Bushing - 145 KV 1250A, 600 CT Length (OIP)
Ter Bushing – 36 KV, 3150 Amp , 300 CT Length (Porcelain)
HVN Bushing– 36 KV, 3150 Amp , 300 CT Length (Porcelain)
Main & OLTC breather with silica gel. (2 Nos for main Conservator, One No. for OLTC conservator)
Air cell for main conservator. (Dia 1300 mm x 4000 mm Lg)
Set of filtration valves with gasket. (50 NB Size, gate Valve)
Cooling fan (24” Fans)
Contactor for marshalling Box
Relay for marshalling box
Rotary switch
Oil Pump o-rings
Transformer Oil
Labour cost for inspection and repair /overhauling of 160MVA,220/132KV BHEL make three phase Auto-Transformer ( All the work should be executed under the supervision of BHEL Representative/Service Engineer and its charges to be included in below quoted rates)
Erection of temporary shed for dehydration of Transformer
Draining of complete oil i.e 50.92 KL from the Transformer for carrying out Internal inspection and for replacement of all the gaskets of Transformer.
Dismantling of transformer Accessiories such as Bushings, bushing turrets, Pipe lines, Inspection covers, OLTC chamber covers, Radiator plugs for replacement of worn out gaskets with new oneS.
Inspection of Bushings, bushing turrets, Pipe lines, Inspection covers, OLTC chamber covers, Radiator plugs, gaskets,Conservator Tank, main Tank Core, winding assembly, Insulation and it's repair/replacement if required.
Erection of all Transformer Accessories as Bushings, bushing turrets, Pipe lines, Inspection covers, OLTC chamber covers, Radiator plugs after replacement of worn out gaskets with new one.
Final Erection Check
Misc. Works such as dismantling of jumpers/connectors and reconnection of same after carrying out job, testing of transformer, carriage/transportation of Filtration Plant, oil storage tanks their loading and unloading at site(L/S).
Filtration/Dehydration of Transformer oil and step by step filling as per the instruction of Service Engineer deputed by BHEL.
Final Testing and commissioning and charging of transformer
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.85 MB
SBD.pdf
Tender Documents • 4.09 MB
BOQ_477564.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .