Tender Value
₹88.5 L
EMD Value
₹1.8 L
Closing Date
13 May 2026, 11:00 amClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Revenue
BUILDINGS
13 conditions · 2 needing a document upload
For works costing more than Rs.50 lakhs - The tenderer must have minimum average annual contractual turnover of V/N or 'V' which ever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
Eligibility Criteria - For works costing more than 50 lakhs- (a) The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i) Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or (ii)Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or (iii) One similar work costing not less than the amount equal to 60% of advertised value of the tender. (b) (1) In case of tenders for composite works (e.g. works involving more than one distinct component, such as Civil Engineering works, S&T works, Electrical works, OHE works etc. and in the case of major bridges - substructure, superstructure etc.), tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i)Three similar works each costing not less than the amount equal to 30% of advertised value of each component of tender, or (ii) Two similar works each costing not less than the amount equal to 40% of advertised value of each component of tender, or (iii) One similar work each costing not less than the amount equal to 60% of advertised value of each component of tender. Note: for b(1)Separate completed works of minimum required values shall also be considered for fulfillment of technical eligibility criteria for different components. For works costing less than 50 lakhs - No specific eligibility criteria is prescribed.
22 conditions · 3 needing a document upload
Submission of Annexure-V under Document Verification Certificate- As per Advance Correction Slips to GCC - 2022, the tenderers shall submit copy of certificate stating that they are not liable to be disqualified and all their statements/documents submitted along with bid are true and factual. Standard format of the certificate to be submitted by the bidder in form of Annexure V. Non-submission of the above Certificate(s) by the bidder shall result in summarily rejection of his/their bid.
Submission of Annexure-V(A) under Document Verification Certificate : In case of other than Company/Proprietary firm, Annexure-V(A) shall also be submitted by the each member of a Partnership Firm/Joint Venture (JV) /Hindu Undivided Family (HUF) / Limited Liability Partnership (LLP) etc., as the case may be. Non-submission of the above Certificate (s) by the bidder shall result in summarily rejection of his/their bid.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Copies of the following documents are to be uploaded: (i) Details such as Name of the tenderer/ Contractor, Validity of DSC, Complete address with pin code, Contact Number (ii) Copy of PAN Card (iii) Copy of GSTIN card
A copy of NEFT form duly filled in the details as necessary to be uploaded. (The Tenderer/ Contractor not having NEFT form may down load the empty NEFT form available in document site)
The tenderer shall clearly specify whether the tender is submitted on his own (Proprietary Firm) or on behalf of a Partnership Firm / Company / Joint Venture (JV) / Registered Society / Registered Trust / Hindu Undivided Family( HUF) / Limited Liability Partnership (LLP)etc. The tenderer(s) shall enclose the attested copies of the requisite documents(including Power of Attorney, if opted) for constitution of their concern as per clause 14 of GCC Part I and as per a) Clause 17 of GCC Part I, for JV b) Clause 18 of GCC Part I, for Partnership firm
All the instructions furnished in the Technical compliance/ Commercial Compliance/ Check-list/ Undertakings are only indicative and not exhaustive; The Tenderer shall read the GCC/Tender documents for complete details.
The tenderer shall thoroughly go through the entire tender documents and strictly adhere to the instructions and directions given therein.
If the Tenderer(s) deliberately give(s) wrong information/ or create incorrect documents in his/their offer or create circumstances for the acceptance of his/their offer, the Railway reserves the right to reject such offer at any stage.
All terms and conditions in the tender documents are binding on the Tenderers
Railway reserves the right to accept or reject any or all the tenders and to award the work in whole or in part without assigning any reason.
Unreleased Bid Security, if any, held with the Railway Administration, shall not be adjusted towards the Bid Security to be remitted.
Bid Security shall be deposited either in cash through e-payment gateway or e-BG or submitted as Bank Guarantee bond from a scheduled bank of India or as mentioned in tender documents subject to exemptions provided under para5(1) (a) of Part-1 (ITT) of GCC.
In case of submission of Bid Security in the form of Bank Guarantee, the Original Bank Guarantee (other than e-BG) should be delivered in person to the Official nominated as indicated in the Tender document within 5 working days before the closing date of submission of bids.
Relocation of Cardiac catheterization Laboratory artis zee from old Railway hospital-PER to New Railway hospital-PER
MAS15OF26064RM
MAS15OF26064RM
Single
Works - General
6 Months
Chennai, Tamil Nadu
₹0
₹1.8 L
13 May 2026
6 May 2026
6 May 2026
5 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 88,50,000 | ||
| — | — | — | 35,40,000 | ||
| Dismantling, decommissioning, shifting and reinstallation of existing Artis Zee Floor Cath Lab System including floor-mounted C-arm, flat panel detector, X-ray tube assembly, patient table, monitor suspension system, control consoles, workstations, Sensis Vibe haemodynamic system, UPS with batteries, stabilizer, power injector, associated racks, cabling, lead glass shielding and all accessories; carrying out pre-dismantling checks and safe shutdown; disconnecting electrical supply, IT interfaces and earthing; careful dismantling under OEM/authorized technical supervision with necessary mechanical support; packing with anti-static and shock-proof protective materials including transport frames; loading, unloading, crane handling and transportation to new site; unloading, shifting and positioning; reinstallation including anchoring, refixing lead glass, cable re- routing with protective mesh (rodent protection), reconnection of electrical and system interfaces; complete alignment, calibration, quality assurance checks, testing, commissioning and handing over the system in satisfactory working condition, complete as directed by the Engineer-in-Charge. The item includes decommissioning at old site, packing and safe transportation of sensitive equipment, system re-erection, reinstallation of Sensis Vibe, UPS, stabilizer and power injector, lead glass removal and refixing, cable protection works, and pre- & post-installation quality assurance. Unit: Each (complete system). ( Rate is inclusive of GST) | — | 1.00 | — | — | |
| — | — | — | 53,10,000 | ||
| Providing turnkey execution support works for relocation and reinstallation of Cath Lab system including engineering coordination, preparation and submission of technical drawings, layout verification, installation assistance, mechanical handling support, provision and fixing of protective cable mesh for rodent protection, routing and dressing of cables, minor allied works required for safe equipment placement, coordination with OEM representatives, and all incidental services necessary for successful installation and commissioning of the Cath Lab system, complete as directed by the Engineer-in-Charge. The item includes project execution support, installation assistance, cable protection works, technical coordination, and allied services required for completion of the relocation work ( Rate is inclusive of GST). | — | 1.00 | — | — |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
NEFTForm.pdf
ATTACHMENT
ProcedureforLCModeofPayment.pdf
ATTACHMENT
GCCApril2022_compressed.pdf
ATTACHMENT
eTenderformApril2022.pdf
ATTACHMENT
IRGCCACS1to10_compressed.pdf
ATTACHMENT
MOVEMENTOFVEHICLESNEARRAILWAYTRACK.pdf
ATTACHMENT
SNWmasterlistason09012026.pdf
ATTACHMENT
FORMATIONBUILDINGBRIDGEPWAYWORKSJULY2024_1.pdf
ATTACHMENT
CORRECTIONSLIP11.pdf
ATTACHMENT
CATHELABAGREEMENTCOPY.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .