Loading
Loading…
Loading…
Tender Value
Refer Docs
Closing Date
14 Nov 2024, 3:00 pmClosed
PR & CC
This Tender is for Civil, Electrical and Mechanical Jobs for development of new outlet as well as
2400016922-HD-09050
5100016922
Open Tender
Unknown (Unspecified Location)
14 Nov 2024
25 Oct 2024
14 Nov 2024
14 Nov 2024
26 Oct 2024 - 3 Nov 2024
| Item No | Item Title | Description | Qty | Unit |
|---|---|---|---|---|
| 1 | SITE CLEARANCE | SITE CLEARANCE — urface dressing of the ground including removing small plants, bushes ,vegetation (dia less than 4"") and making surface levelled a disposal of rubbish outside HPCL's premises to anunobjectionable place, as directed by the Engineer in Charge." | - | square meter |
| 2 | EXCAVATION IN EARTH UPTO | EXCAVATION IN EARTH UPTO — xcavation for foundation upto required depth below existing ground level up to 1.5 m. depth in any type of soil except hard rock . R e to include dressing the sides and bottom, bailing out of water if encountered, shoring, strutting, backfilling after the construct n of foundation, trenches/plinth beam etccompacting by the side of the foundation and disposal of surplus excavated earth within/ou ide HPCL's premises to an unobjectionable place, as directed by the Engineer in Charge including spreading, watering and compaction complete. The measurement of the excavation would be based on actual depth of excavation with applicable rate for differentdepths. | - | cubic meter |
| 3 | "EXCAVATION - 1.5TO 3 M" | "EXCAVATION - 1.5TO 3 M" — cavation for foundation upto required depth below ground level in any type of soil except hard rock . Rate to include dressing the s es and bottom, bailing out of water if encountered, shoring, strutting, backfilling after the construction of foundation, foundation trenches/plinth beam etc compacting by the side of the foundation and disposal of surplus excavated earth within/outside HPCL's pre ses to an unobjectionable place, as directed by the Engineer in Charge including spreading, watering and compaction, complete . Th measurement of the excavation would be based on actual depth of excavation with applicable rate for different depths.EXCAVATION IN E TH BETWEEN 1.5 TO 3 M | - | cubic meter |
| 4 | EXCAVATION - 3 TO 4.5 | EXCAVATION - 3 TO 4.5 — cavation for foundation upto required depth below ground level in any type of soil except hard rock . Rate to include dressing the ides and bottom, bailing out of water if encountered, shoring, strutting, backfilling after the construction of foundation, compacti by the side of the foundation and disposal of surplus excavated earth within/outside HPCL's premises to an unobjectionable place, s directed by the Engineer in Charge including spreading, watering and compaction, complete . The measurement of the excavation wou be based on actual depth of excavation with applicable rate for different depths. EXCAVATION IN EARTH BETWEEN 3 TO 4.5 | - | cubic meter |
| 5 | EXCAVATION- HARD ROCK | EXCAVATION- HARD ROCK — cavation for foundation upto required depth below existing ground level up to 1.5 m. depth in hard rock by chiselling / pneumatic d lling or Blasting. . Rate to include dressing the sides and bottom, bailing out of water if encountered, shoring, strutting, backfil ng after the construction of foundation, trenches/plinth beam etc compacting by the side of the foundation and disposal of surplus e avated earth within/outside HPCL's premises to an unobjectionable place, as directed by the Engineer in Charge including spreading, atering and compaction, complete . The measurement of the excavation would be based on actual depth of excavation with applicable ra for different depths. EXCAVATION IN HARD ROCK UPTO 1.5 MT | - | cubic meter |
| 6 | EXCAVA- HARDROCK 1.5- 3.0 | EXCAVA- HARDROCK 1.5- 3.0 — cavation for foundation upto required in hard rock and excavation shall be done by chiselling / pneumatic drilling or Blasting. R e to include dressing the sides and bottom, bailing out of water if encountered, shoring, strutting, backfilling after the construct n of foundation, trenches/plinth beam etc compacting by the side of the foundation and disposal of surplus excavated earth within/o side HPCL's premises to an unobjectionable place, as directed by the Engineer in Charge including spreading, watering and compactio complete . The measurement of the excavation would be based on actual depth of excavation with applicable rate for different depth EXCAVATION IN HARD ROCK 1.5 mts- 3.0 mts | - | cubic meter |
| 7 | EXCAVA-HARD ROCK 3.0- 4.5 | EXCAVA-HARD ROCK 3.0- 4.5 — cavation for foundation upto required in hard rock and excavation shall be done by chiselling / pneumatic drilling or Blasting. R e to include dressing the sides and bottom, bailing out of water if encountered, shoring, strutting, backfilling after the construct n of foundation, compacting by the side of the foundation and disposal of surplus excavated earth within/outside HPCL's premises to n unobjectionable place, as directed by the Engineer in Charge including spreading, watering and compaction, complete . The measur ent of the excavation would be based on actual depth of excavation with applicable rate for different depths. EXCAVATION IN HARD OCK BETWEEN 3 TO 4.5 | - | cubic meter |
| 8 | SAND FILLING - LAYERS | SAND FILLING - LAYERS — pply and filling with clean silver / river sand of approved quality in layers of 150 mm each including spreading, compacting by hand amming and watering etc, all complete as per direction of Engg.-In-Charge. Measurement basis compacted thickness only. | - | cubic meter |
| 9 | CRUSHEDSTONESA ND | CRUSHEDSTONESA ND — upply and filling with Crush Sand as per IS 21116-1980-2 & IS 486:2000 & IS383.1970 The particle shape is semi rounded or cubical & ot flakey or elongated. Dust percentage is strictly controlled 10 - 15% with fineness" | - | cubic meter |
| 10 | MURRUM FILLING - LAYERS | MURRUM FILLING - LAYERS — upplying and filling good quality murum in layers of 150 mm thick includingwatering and compacting till maximum compaction is ach ved as directed by Engineer In Charge.Compacted volume shall be considered for payment." | - | cubic meter |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
2400016922-HD-09050.pdf
TENDER_DOCUMENT • 46.02 MB
Download all tender documents and submit your bid