Tender Value
₹1.9 Cr
EMD Value
₹11.5 L
Closing Date
30 Sept 2026, 12:00 pm7d left
SE BANDA CIRCLE PWD BANDA
OFFICE OF THE SE BANDA CIRCLE PWD BANDA
CONSTRUCTION WORK OF LINK ROAD OF MANTORIA TALAB TO PINDKHAR LINK ROAD -INCLUDING 5 YEARS MAINTENANCE-
2026_CEBAN_1185542_4
3699/35 C - Banda Circle/2026 Dt. 02-09-2026
Open Tender
Civil Works
Percentage
365 days
BANDA
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,720
Yes
₹11.5 L
Yes
OFFICE OF THE SE BANDA CIRCLE PWD BANDA
18 Sept 2026
18 Sept 2026
30 Sept 2026
18 Sept 2026
30 Sept 2026
18 Sept 2026
25 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of embankment with approved material obtained from borrow pits with a lift up to 1.5 meter transporting to sites spreading grading to require slope and compaction to meet requirement of table 300.1 & 300.2 with a lead up to 50 meter as per MORD technical specification cause 301.5 MORD sepecification 301.5(i) S.No. 3.4 | 7,171.2 | cum | 85 | ₹6,09,552 |
| - | Construction of Subgrade and Earthen Shoulders with Stablization of Soil with 2% slaked limeConstruction of Subgrade and Earthen Shoulders with approved material obtained from borrow pits with all lifts and loads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m. as per technical specification clause 303.1 including stablization with 2% slaked lime including mixing with rotavator complete. | 4,811.4 | cum | 319 | ₹15,34,836.6 |
| - | Providing, Laying and spreading material on a prepared sub grade, adding cement @ 2% by weight of the spread material manually mixing in place with rotavator and compacting with the road roller at OMC to achive the desired unconfined compressive strength and to form a layer of sub base. | 948 | cum | 2,500 | ₹23,70,000 |
| - | Providing, Laying and spreading material on a prepared sub grade, adding cement @ 4% by weight of the spread material manually mixing in place with rotavator and compacting with the road roller at OMC to achive the desired unconfined compressive strength and to form a layer of sub base. | 1,260 | cum | 3,125 | ₹39,37,500 |
| - | Providing and applying tack coat with V.G.-10 bitumen using bitumen pressure dristributor @ 0.35 to 0.45 kg. per sqm. on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. | 9,000 | sqm | 24 | ₹2,16,000 |
| - | Providing laying & rolling of open graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line ,grade and level to serve as wearing course on a previously prepared base including mixing in a suitable plant ,laying and rolling with a three wheel 80-100 KN static roller capacity finished to required level and grades to be followed by seal coat . Claues 508 | 9,000 | sqm | 197 | ₹17,73,000 |
| - | Providing and laying seal coat Type-C sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using As per Technical Specification Clause 510 | 9,000 | sqm | 76 | ₹6,84,000 |
| - | Construction of Subgrade and Earthen Shoulders with Stablization of Soil with 2% slaked limeConstruction of Subgrade and Earthen Shoulders with approved material obtained from borrow pits with all lifts and loads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m. as per technical specification clause 303.1 including stablization with 2% slaked lime including mixing with rotavator complete. | 2,436.48 | Cum | 319 | ₹7,77,237.12 |
| - | Maintenance of bituminous surface road and gravel or WBm road including filling pot holes and patch repair etc.restoration of rain cuts and dressing of side slop / berms, making up of berms/shoulders maintenance of drain, maintenance of culvert, maintennance of guard rails and parapet. maintenance of road sign, speed breakers, standing tree at adjacent to road wherever required maintenance of 200m Stone(Hectometr) and kilometr stones, cutting of branches of trees, shurb and trimming of grass and weeds etc. white whashing of parapet including CD Work,painting of guard stones, refixing of displaced guard stone (as per performance Index Anexure-1) mentioned in GO No. 17/2024/sa-113/23-1-2024-23- 1099/113/2023 dated 16.01.2024 & Enc lettere по. 3689/C-OPRMC/MUL-2023-24 dated 17.02.2024 subjected to approval from Govt. Maintence of 1st year after completion of work @Zero % of total cost of PC work | 1 | Job | - | - |
| - | Maintenance cost for 2nd year @ 0.75% cost of PC Work | 1 | Job | 89,265.94 | ₹89,265.94 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.35 MB
Tendernotice_2.pdf
PDF • 1.21 MB
BOQ_2236188.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .