Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹21.3 L
EMD Value
₹21,340
Closing Date
29 Dec 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
BDO (VP)
vikravandi
vikravandi/AGAMT22-23/04
2022_RDTN_274085_1
vikravandi/AGAMT22-23/04
Open Tender
Civil Works
Works
60 days
VIKRAVANDI
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹21,340
Yes
29 Dec 2022
21 Dec 2022
29 Dec 2022
21 Dec 2022
29 Dec 2022
21 Dec 2022
Amount
Providing cement concrete pavement @ Anna nagar 102 M & ilular colony ( 50)m in ponnakuppam panchayat
Earth wok excavation for foundation in classes of soils except hard rock requiring blasting with initial lead and lift etc., including leveling the site etc,complete with standard specificationin hard stiff clay black cotton soil hard fred earth
Cement Concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone jelly including labour charges for mixing concrete watering and laying the concrete in layers not more the 15 cm thick compacting etc complete complying with standard specification etc c
Supplying and erecting shuttering including complying with standard speficiation including all labour charges etc.complete.
Cement Concrete : 1:2:4 with broken stone jusing 20mm gauage machine broken HBG metal including cost and conveyance and all labour charges etc.complete
Supply and fixing bitumen pad for exp joint
Name board charges
Photographic chrges
construction of School Toilet for Girls @hr sec school in ponnankuppam Panchayat
Earth work Excavation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting, Sectioning the street to lay concrete pavement per SS 20 A.
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed for foundation
Random Rubble Masonry in cement Mortar 1 : 5 for foundation and basement including necessary provision for Bond stones with simultaneous flush pointing with the same m
Filling in Basement with excavated Earth in layers of not more than 15cm. Thick well rammed, watered and consolidated complying with standard specifications etc., complete.
Supplying and Filling foundation and basement with filling M-sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications.
Brick Jelly 40mm size for filling soak pit inner etc., complete complying with standared specification.
Supplying & Erecting centering for sides & soffits including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification
Supplying and fixing of Indian type water closet including all charges e
Supplying and fixing of Europian type water closet including all charges etc.
Supplying and fixing of Europian type water closet including all charges etc.
PLASTERING with cement mortar 1:4 mix 20mm thick in all floors complying with standard specifications
Finishing the exposed surface of RCC item of work such as slabs, beams, sunshade, facia, canopy slab, staircase waist slab, landing slab etc., with CM 1:3, 10mm thick including raking the surface
Plastering with CM 1:5, 12mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Paving the flooring with special type of flooring tiles (Cement based Hydraulically pressed Anti skid tiles (20mm thick) in CM 1:3, 20mm thick
Dadooing walls with Glazed tiles of any colour and any size laid in CM 1:2, 10mm thick. and pointing with white cement 0.4 Kg per sqm mixed with colouring pigment to siut the colour of the tiles including finishing the joints neatly complying with standard Specification
Towards the cost of steel door of size 0.75mx 1.80 m including all charges etc
Door D1
Door D
Distempering two coats using best freshly burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers.
Exterior emulsion two coats using best freshly burnt shell lime in all the floors using best quality & approved variety of colouring pigments including cost of lime, colouring pigment, Fevicol type gum, brushes,scaffolding charges etc., complete
Painting two coats over new iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with best approved best quality of synthetic enamel paint of approved colour over the existing priming coat etc., complete
ELECTRIFICATION
Wiring with 2x1.50 sqm PVC insulated unsheated Sc.alu Cable of conductor of 1100V grade insulated for open Light point .(SD 18),
Wiring with 2x1.50 sqm PVC insulated unsheated Sc.alu Cable of conductor of 1100V grade insulated for open plug point .(SD 36),
Towards cost and fixing of 11 w CFL bulb fitting
Supply and Fixing of 11 W CFL in the existing light point SD - 80
Supply and fixing run off 2x1.50sqm PVC insulated Sc . Un sheated Sc conductor of 1100 v grade on 7/20 GI Bearer wire for Service Main (SD 64)
DP Main Switch (16 Amps)
Modular Switches (16 Am
Provision for 500 litre HDPE Tank
Water Supply and sanitary arrangements
Provision for supply and fixing RCC Jollies
Provision for leach pit cover slab
Provision for Handrail for ramp
Provision for Handrails for DA Toile
Provision for RWH
Provision for Lock and Key
Provision for Wash Basin
Provision for Photocharges
Provision for Name Board
Construction of Threashing Floor at Irular colony in ponnankuppam Panchayat
Earth work excavation and depositing on bank with intial lead and lift in all clasuses of soil such as Hard Gravely soil, Gravely soil except Hard Rock requiring Blasting etc complete as per SS20B for narrow foundation
Filling in Basement with Excavated Carted Earth with an average lead of 1 Km in layers not more than 15 cm thick , well ramed and consolidated complying with standard specification
Filling in Foundation and Basement with Filling Sand in layers not more than 15 cm thick , well ramed and consolidated complying with standard specification
Cement Concrete 1:4:8 mix using 40mm ISS HBG stone jelly for Foundation and flooring including cost,conveveyance of all materials and labour charges to laid in layers not more than 15cm thick, well rammed etc, complete with standard specification
Supplying and Erection centering for sides and soffiots including necessaary supports and strutting as directed by the departmental officers. Rate for 10m2 for the following items (RCC floor slab, roff slab, Rectangular / Square, Tee/ Ell beams, Lintels, StairCase Waist Slablanding slab landing beam Canopy etc in all floors with all cross Bracings using mild steel sheets of size 90cm x 60cm and 10BG stiffened withmild steel angles of size 25mmx3mm for boarding laid over country wood joists of size 10cmx6.50cm spaced at about 90cm centre to centre and supported by Casurina props of 10cm to 13cm dia spaced at 75cm centre etc, complete
Cement Concrete 1 : 3 : 6 , mix using 40mm ISS HBG stone jelly for Walls including cost,conveveyance of all materials and labour charges to laid in layers not more than 15cm thick, well rammed etc, complete with standard specification
Cement Concrete 1 : 2 : 4 , mix using 40mm ISS HBG stone jelly for Walls including cost,conveveyance of all materials and labour charges to laid in layers not more than 15cm thick, well rammed etc, complete with standard specification
Brick Work in Cement Mortor 1 : 5 mix using Country Bricks of size 22 x 11 x 7 cm including cost and conveyance of all materials and labour charges etc complete .
Plastering with Cement Mortor 1:5,12mm thick including cost and conveyance of all materials and labour charges including curing etc., complete complying with standard specification as directed by the departmental officers
Cost of Bitumen Pad
Providing Name Board
Photo Graphic Charges
Providing Horizontal filter with CC Drain @ Anjeneyar kovil 2nd street in Ponnankuppam Panchayat
Earth work excavation for foundation in all classes of soils except hard rock requiring blasting with initial lead and lift etc including levelling the site etc. complete with standard specification in hard stiff cllay, black cotton soil, hard fred earth
Cement Concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone jelly including labour charges for mixing concrete watering and laying the concrete in layers not more the 15 cm thick compacting etc complete complying with standard specification etc c
Supplying and erecting shuttering including complying with standard speficiation including all labour charges etc.complete.
Brick Work in Cement Mortor 1 : 5 mix using Country Bricks of size 8 3/4 x 4 1/4 x 2 3/4 and M.Sand inc luding cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 100 Cft
Cement Concrete : 1:2:4 with broken stone jusing 20mm gauage machine broken HBG metal including cost and conveyance and all labour charges etc.complete.
Plastering in Cement Mortor 1 : 3 mix to 20 mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Supply and filling 40mm and 20mm ISS HBG metal including cost and conveyance of metal and labour charges for filling etc complete
Supply and filling Red Gravel including cost and conveyance of Red Gravel and labour charges for filling etc complete.
Supply and filling Char coal including cost and conveyance of Char coal and labour charges for filling etc complete
Supply and filling M-Sand including cost and conveyance of M-Sand and labour charges for filling etc complete.
Labour charges for filling Metal, Gravel, Char coal and M-Sand etc
Labour charges for filling Metal, Gravel, Char coal and M-Sand etc
Supply and fixing 110mm dia PVC pipe including labour charges for fixing etc
Name board charges
Photographic chrges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Balasubramanian M
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .