| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAccepted-AOC | ₹1.5 Cr | L1 | Accepted-AOC technicall qualified and quoted lowest amount |
| 2 | L2₹1.5 Cr+₹6.5 L (4.44%)Rejected-Finance GANGABAKSPURWA NEAR BILGRAM CHUNGI DISTRICT HARDOI | HARDOI | HARDOI | UTTAR PRADESH | ₹1.5 Cr+₹6.5 L (4.44%) | L2 | Rejected-Finance QUOTED HIGHER RATE THAN L1 |
| 3 | L3₹1.6 Cr+₹14.6 L (9.94%)Rejected-Finance NA | NEW DELHI | DELHI | 110001 | ₹1.6 Cr+₹14.6 L (9.94%) | L3 | Rejected-Finance QUOTED HIGHER RATE THAN L1 |
| 4 | Not Admitted-Fee/PreQual/Technical 99 SUSHILA BIHAR BHUD BULANDSHAHAR | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | SHIV SUNDER CONSTRUCTION & CONSULTANTS PVT LTD L1 | PRAVEEN KUMAR BAJPAI L2 | M/s Chandra Construction L3 |
|---|---|---|---|---|---|---|
| 1.00 | CIVIL WORKS
Demolishing lime concrete manually / by machanical means and disposal of material within 50 metres lead as per direction of engineer in charge | 49.11 | Cum. | 400 ₹19,644 | 354.84 ₹17,426.19 Lowest | 373.52 ₹18,343.57 |
| 2.00 | Demolishing brick work manually/by machanical means including stacking of servicable material and disposal of unserviceable material within 50 metres lead as per direction of engineer in charge | 196.39 | Cum. | 330 ₹64,808.7 | 294.54 ₹57,844.71 Lowest | 310.04 ₹60,888.76 |
| 3.00 | Cleaning thick jungle and thorney bushes withaut uprooting | 26,695 | sqm | 4 ₹1,06,780 Lowest | 4.62 ₹1,23,330.9 | 4.87 ₹1,30,004.65 |
| 4.00 | Earth work in exavation of foundation including all lead and lift T&P etc and manual compection | 200.78 | Cum. | 120 ₹24,093.6 | 104.88 ₹21,057.81 Lowest | 110.4 ₹22,166.11 |
| 5.00 | Laying C.C. 1:4:8 in floor with Brick ballast and Coarse Sand per cum | 194.77 | Cum. | 3,900 ₹7,59,603 Lowest | 4,953.61 ₹9,64,814.62 | 5,214.33 ₹10,15,595.05 |
| 6.00 | Cement concrete in 1:3:6 in floor with coarse sand and stone aggregrate 25-40 mm gauge including cost of all Labour & Materials T&P etc. required for proper completion of the work. | 58.5 | Cum. | 7,000 ₹4,09,500 Lowest | 7,792.95 ₹4,55,887.58 | 8,203.11 ₹4,79,881.94 |
| 7.00 | M-150 class Brick work in 1:4 Cement Mortor with Cement , coarse sand But excluding Bricks including cost of all Labour & Materials T&P etc. required for proper completion of the work. | 38.2 | Cum. | 6,800 ₹2,59,760 | 2,646.11 ₹1,01,081.4 Lowest | 2,785.38 ₹1,06,401.52 |
| 8.00 | M-150 class Brick work in 1:4 Cement Mortor with Cement , coarse sand and Brick including cost of all Labour & Materials T&P etc. required for proper completion of the work. | 247.07 | Cum. | 6,300 ₹15,56,541 | 5,918.52 ₹14,62,288.74 Lowest | 6,230.02 ₹15,39,251.04 |
| 9.00 | Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia & length (hold fast lugs or dash fastener shall be paid for separately).
9.1.2 sal wood | 2.49 | cum | 90,000 ₹2,24,100 | 80,091.08 ₹1,99,426.79 Lowest | 84,306.4 ₹2,09,922.94 |
| 10.00 | Providing and fixing factory made single extruded WPC (Wood Polymer Composite) solid door/window/Ceosetory windows & other Frames/Chowkhat comprising of virgin PVC polymer of K value 58-60 (Suspension Grade), calcium carbonate and natural fibers (wood powder/ rice husk/wheat husk) and non toxic additives (maximum toxicity index of 12 for 100 gms) fabricated with miter joints after applying PVC solvent cement and screwed with full body threaded star headed SS screws having minimum frame density of 750 kg/cum, screw withdrawal strength of 2200 N (Face) & 1100 N (Edge), minimum compressive strength of 58 N/mm2, modulus of elasticity 900 N/mm2 and resistance to spread of flame of Class A category with property of being termite/borer proof, water/moisture proof and fire retardant and fixed in position with M.S hold fast/lugs/SS dash fasteners of required dia and length complete as per direction of Engineer-In-Charge. (M.S hold fast/lugs or SS dash fasteners shall be paid for separately).
Note: For WPC solid door/window frames, minus 5mm tolerance in dimensions i.e depth and width of profile shall be acceptable. Variation in profile dimensions on plus side shall be acceptable but no extra payment on this account shall be made. | 65.69 | cum | 1,150 ₹75,543.5 | 1,018.56 ₹66,909.21 Lowest | 1,072.17 ₹70,430.85 |
Tender Value
₹1.9 Cr
EMD Value
₹3.8 L
Closing Date
17 Oct 2025, 1:00 pmClosed
SE SIX CIRCLE LUCKNOW
SE Six circle lucknow
Hardoi khand sharda nahar hardoi ke antargat Salliya nirikshan bhawan avam karamchari aawas ke punar nirman ka karya
2025_UPIDC_1081543_2
03/SE-6/2025-26
Open Tender
Civil Works
Item Rate
250 days
Hardoi
please refer tender document
2 documents required · 2 mandatory
₹4,274
₹3.8 L
SE Six circle lucknow
22 Nov 2025
10 Oct 2025
17 Oct 2025
10 Oct 2025
17 Oct 2025
10 Oct 2025
13 Oct 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .