| 1 | L1₹2.2 LQualified | L1 | Qualified MSE, MII, Category: General | |
| 2 | L2₹2.3 L+₹10,425 (4.68%)Qualified 00 BYE PASS ROAD BAHERI BYE PASS ROAD BAHERI BYE PASS ROAD BAHERI BAREILLY UTTAR PRADESH 243201 | BAREILLY | UTTAR PRADESH | 243201 | L2 | Qualified MSE, MII, Category: General | |
| 3 | L3₹2.5 L+₹28,845 (12.9%)Qualified A 530 D D A COLONY KHYALA KHYALA WEST DELHI DELHI 110018 | WEST DELHI | DELHI | 110018 | L3 | Qualified MSE, MII, Category: General |
Tender Value
Refer Docs
EMD Value
Exempted
Closing Date
22 Oct 2026, 7:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Published by the portal on this tender, for queries and grievance redressal.
Repair and Maint of E M items transformer and Voltage
9991309
GEM/2026/B/8122162
Two Packet Bid
Taking down of step Up and down transformer 160KVA after
Jammu, Jammu And Kashmir
Total value wise evaluation
BOQ
4 documents required · 4 mandatory
3 yrs
₹1.3 L
50%
AGE E/M, HQ CWE AIRFORCE JAMMU, Department of Military Affairs, Indian Army, Ministry of Defence, (Ranbir Singh Salathia)
Exempted
Yes
28 Oct 2026
12 Oct 2026
23 Oct 2026
| Item No | Item Title | Description | Qty | Unit | Consignee | Delivery (days) |
|---|---|---|---|---|---|---|
| 1 | Taking down of step Up and down transformer 160KVA after dismentling HT LT | Taking down of step Up and down transformer 160KVA after dismentling HT LT side cable terminnals earthing connections opening top cover taking out transformer oil transformer core carefully cleaning the sludge and carbon particle from main tank and conservator tank taking out burnt HT LT bush rods and HT LT bushing and reassembling refilling the transformer oil making electrical earthing connections using suitable size of Al Cu lugs after repair replacement of burnt unsv parts including transportation from site to repairer shop and back to site incl testing and recommissioning complete | 1 | Each Job | Jammu | 45 |
| 2 | Gasket set 6 mm thick superior quality on top cover plate | Gasket set 6 mm thick superior quality on top cover plate of the transformer of any capacity 160 KVA all as specified | 1 | Each | Jammu | 45 |
| 3 | LT Porcelain bushing with brass stud screwed with brass nuts bolts | LT Porcelain bushing with brass stud screwed with brass nuts bolts and cork washer for transformer of capacity 160 KVA to 200 KVA 415 volts 3 phase 4 wire system all as spd | 4 | Each | Jammu | 45 |
| 4 | HT 11 kV porcelain bushing with brass stud screwed with brass nuts | HT 11 kV porcelain bushing with brass stud screwed with brass nuts bolts and cork washer for transformer of capacity 160 KVA to 200 KVA all as spd | 3 | Each | Jammu | 45 |
| 5 | Painting of transformer of rating 160 KVA and voltage stabilizer with two coat | Painting of transformer of rating 160 KVA and voltage stabilizer with two coat of super enamelled synthetic paint of smoke grey colour complete after preparing of old surface by scratching the old paint complete. | 1 | Each | Jammu | 45 |
| 6 | Supply filling and top up with new Transformer oil of electric strength | Supply filling and top up with new Transformer oil of electric strength more than 40 KV at gap 4 mm confirming to IS 335 1993 complete all as specified and as directed. | 115 | Per Litrs | Jammu | 45 |
| 7 | Filtration dehydration of transformer oil of three phase servo voltage | Filtration dehydration of transformer oil of three phase servo voltage stabilizer 200 KVA located at Dharati for increasing dielectric strength not less than 45 KV. | 450 | Ltrs | Jammu | 45 |
| 8 | Rewinding of transformer 160 kVA complete using appropriate size of copper | Rewinding of transformer 160 kVA complete using appropriate size of copper wound wire HT coils all as secified | 40 | Kg | Jammu | 45 |
| 9 | Shifting of transformer from work shop to AF Stn including connecting | Shifting of transformer from work shop to AF Stn including connecting before the testing and disconnecting after testing all connection complete all as specified. | 1 | Each Job | Jammu | 45 |
| 10 | Material and Labour for arrange temporary power supply through comercial | Material and Labour for arrange temporary power supply through comercial for the continue supply of the AF Stn. Including necessary temporary connections with HT LT net work shall be contractors own arrangement at no extra cost complete all as specified. | 1 | Each Job | Jammu | 45 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_9991309.pdf
GEM_BID • 0.16 MB
bidvolt_2026-10-06-14-56-46_65bc32640a92cdb3a5b3253a86a6310f.pdf
BOQ • 0.07 MB
csvvolt_2026-10-06-14-56-46_c4645578642763cab0a85e5c5841aedd.csv
BOQ • 0.00 MB
ATCPOLE_5bac8320-fad1-45a2-a7f21791455046843_consignee@geafjmu.docx
GEM_OTHER • 0.01 MB
gtc.pdf
GEM_OTHER • 0.71 MB
corrigendum_4669235.pdf
PDF • 0.12 MB
2657c7ca70287299b5181580fdb5a7ab.pdf
PDF • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .