| 1 | L1₹8.1 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹8.3 L+₹17,209.44 (2.12%)Rejected-Finance R O KHONI PO HATKOTI TEHSIL JUBBAL DISTT SHIMLA H P | SHIMLA | HIMACHAL PRADESH | 170009 | L2 | Rejected-Finance rejected due to higher rates | |
| 3 | L3₹8.8 L+₹66,622.44 (8.22%)Rejected-Finance VILL DHAR P O DHAR TEHSIL JUBBAL DISTT SHIMLA H P | SHIMLA | HIMACHAL PRADESH | 170009 | L3 | Rejected-Finance rejected due to higher rates |
Tender Value
₹9.5 L
EMD Value
₹19,000
Closing Date
30 Jul 2021, 6:00 pmClosed
Executive Engineer Jubbal
HPPWD JUBBAL
SH Formation cutting 5/7 mtr wide in Km 1/495 to 1/885,C/O breast wall at RD 0/0 to 0/020 and C/O HPC at RD 0/495 and 0/975
2021_PWD_50257_6
PW-JD/E-Tender/2021-22 -3151-53 DT15.7.2021
Open Tender
Civil Works - Roads
Item Rate
60 days
JUBBAL
Please refer Tender documents.
9 documents required · 9 mandatory
₹350
₹19,000
15 Sept 2021
24 Jul 2021
31 Jul 2021
24 Jul 2021
30 Jul 2021
24 Jul 2021
Amount
Excavation in earth work in hilly area in all heights and depths in all kinds of soil including saturated soil comprising of mixed soil, ordinary and hard rock. All work of rock cutting by blasting shall be carried out by taking all necessary precautions against soil erosion,damage to hill side.Water pollution, etc and to protect soil stability of hill side rock shall be excavated with chiseling and wedging our rock (where blasting is prohibited).All earth work in cutting/excavation including rock excavation shall be carried out true to line, grades ,slops, width,camber, super elevation and level as shown on the drawing as per direction of Engineer in Charge in conformity with the requirement of technical specification for rural roads august 2004 clause 16.2 of general conditions of contract to achieve designed formation width including hauling and stacking of material useful for construction at suitable sites and stage, disposal of unsuitable cut material in specificied manner, trimmingfilling of unevenness blindage and finishing of the road to specified diamensions or as directed by Engineer in charge for smooth riding.The recovery of useful stones shall be made from the contractor and recovery of 178.87 cubic meter useful stones shall be made @ 170/-per cubic meter on prorata basis in each running bill. Any loss to the public and private property during the course of excavation shall be resorted by the contractor what so ever the nature of the same may be.The servicable material will be stacked out specified /dimension in all leads and lifts as per the direction of Engineer in Charge.
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a any lead and lift , dressing of sides and bottom and backfilling in trenches with excavated suitable material.useful material available from excavation to be properly stacked and handed over to the department free of cost including all leads and lifts, as per HPPWD, specification of 1990 volume-I or as directed by the Engineer-In-Charge
Providing and Laying concrete concrete 1:6:12 (1cement: 6 sand: 12 graded stone aggregate 40mm nominal size)for plain/reinforced concrete in open foundations complete as per drawing and technical specification clauses 802, 803, 1202 and 1203 including all leads and lifts, as per HPPWD, specification of 1990 volume-I or as directed by the Engineer-In-Charge
Random rubble masonrystone masonry(un-coursed/brought to courses)with hard stone ofapproved quality in foundation in cement mortar 1:6(1cement:6sand) complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203.including all leads and lifts, or as per HPPWD,. Specification of 1990 Volume-I, asdirected by the Engineer-In-Charge.
Construction of dry rubble masonary for retaining walls, breast walls,revetment walls and parapets etc. for sub-structure and super structure complete as per drawing and technical specification clauses 704.6 & 1302.5 including all leads and lifts, as per HPPWD, specification of 1990 volume-I as directed by the Engineer-In-Charge
Providing and Laying concrete concrete 1:4:8 (1cement: 4 sand: 8 graded stone aggregate 40mm nominal size) in open foundations complete as per drawing and technical specification clauses 802, 803, 1202 and 1203 including all leads and lifts, as per HPPWD, specification of 1990 volume-I or as directed by the Engineer-In-Charge
Stone masonry work in cement mortar in foundation In 1:3 cement mortar complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203.Coursed rubble masonry (2nd sort) including all leads and lifts, as per HPPWD, specification of 1990 volume-I or as directed by the Engineer-In-Charge
Providing and laying reinforced cement concrete pipe NP2 900 mm dia for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection work, back filling, concrete and masonary work in head walls and parapets clause 1108.including all leads and lifts, as per HPPWD, specification of 1990 volume-I or as directed by the Engineer-In-Charge
MANISHA RAWAT
RAJESH JHOUTA
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .