Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.4 LAccepted-AOC 620 DIAMOND HARBOUR RD BEHALA INDUSTRIAL ESTATE PLOT F 4 KOLKATA 700 034 | KOLKATA | KOLKATA | WEST BENGAL | 700034 | L1 | Accepted-AOC L1 Bidder | |
| 2 | Rejected-Technical | - | Rejected-Technical Bidder is not fulfilled the tender criteria. | |
| 3 | Rejected-Technical | - | Rejected-Technical Bidder is not fulfilled the tender criteria. | |
| 4 | Rejected-Technical | - | Rejected-Technical Bidder is not fulfilled the tender criteria. |
Tender Value
Refer Docs
EMD Value
₹16,961
Closing Date
13 Jan 2022, 4:00 pmClosed
Administrative Officer, CSIR - IICB, Kolkata
CSIR-Indian Institute of Chemical Biology 4, Raja S. C. Mullick Road, Jadavpur, Kolkata-700032
Overhauling, Servicing, Maintenance and up-keeping of Hitachi, Carrier and others make Split type (Inverter and non-Inverter) Air Conditioning units
2021_CSIR_99215_1
CSIR_IICB / Admn 26 (693) / E / 2021
Open Tender
Miscellaneous Works
Item Rate
365 days
CSIR - IICB Jadavpur and Salt Lake Campus
As per NIT
4 documents required · 4 mandatory
₹0
₹16,961
9 May 2022
4 Jan 2022
14 Jan 2022
4 Jan 2022
13 Jan 2022
4 Jan 2022
Amount
Comprehensive Annual Maintenance: Comprehensive Annual Maintenance contract of Hitachi, Carrier and others make different models Split type (Inverter and non-Inverter) Air Conditioning units installed at different room / sections at CSIR-IICB, Jadavpur campus for their effective functioning throughout the period of One (01) year. This work will be including repair / replacement of all necessary spare parts & consumable materials viz. Air filter, required Refrigerant gas, Capacitor, Compressor, P.C.B.(including inverter P.C.B. for Carrier, Blue Star make different models), Bracket, Base plate, Condenser & Evaporator Cooling Coil, Runner, Copper pipe (Dia:1/4”,3/4”,3/8”,5/8”,1/2”), clear braided flexible PVC hose pipe, Three/ four core Electric wire, Condenser fan motor, Indoor fan motor, Dry cell / Batteries (for remote control units) etc. complete as required and as per standard engineering practice. Here the scope of work is inclusive of attend breakdown call, general servicing, Overhauling, leak testing, required Refrigerant gas charging, cleaning , up keeping of Air Conditioning unit and their immediate surroundings (room / lab). For this purpose all essential tools, consumable & cleaning materials viz. Ladder, Cloth, Cotton west, Soap detergent etc. are to be arranged by the AC maintenance contractor. All the consumable materials to use shall be of reputed make and or shall be used in consultation of concerned Section In-charge.
Comprehensive Annual Maintenance of Hitachi make different models non-inverter Split type Air Conditioning units. • 1.5 / 2.0 TR capacity Split type AC unit
Comprehensive Annual Maintenance of Carrier-Totaline make non-inverter Split type Air Conditioning units • 2.5 TR capacity Split type AC units
Comprehensive Annual Maintenance of carrier make Inverter technology Split type Air Conditioning units. • 1.5 TR capacity Split type AC units
Comprehensive Annual Maintenance of carrier make Inverter technology Split type Air Conditioning units • 2.0 TR capacity Split type AC units
Comprehensive Annual Maintenance of Weather Makers make non-inverter Split type Air Conditioning units •1.5 /2.0 TR capacity Split type AC units
Comprehensive Annual Maintenance different make & models non-inverter Split type Air Conditioning units • 1.5 /2.0 TR capacity Split type AC units
Comprehensive Annual Maintenance of Blue Star Make Inverter technology Split type AC units. • 2.0 TR capacity Split type AC units
Comprehensive Annual Maintenance: Comprehensive Annual Maintenance contract of Hitachi, Carrier and others make different models Split type (Inverter and non-Inverter) Air Conditioning units installed at different room / sections at CSIR-IICB, Salt Lake campus for their effective functioning throughout the period of One (01) year. This work will be including repair / replacement of all necessary spare parts & consumable materials viz. Air filter, required Refrigerant gas, Capacitor, Compressor, P.C.B.(including inverter P.C.B. for Carrier make different models), Bracket, Base plate, Condenser & Evaporator Cooling Coil, Runner, Copper pipe (Dia:1/4”,3/4”,3/8”,5/8”,1/2”), clear braided flexible PVC hose pipe, Three/ four core Electric wire, Condenser fan motor, Indoor fan motor, Dry cell / Batteries (for remote control units) etc. complete as required and as per standard engineering practice. Here the scope of work is inclusive of attend breakdown call, general servicing, Overhauling, leak testing, required Refrigerant gas charging, cleaning , up keeping of Air Conditioning unit and their immediate surroundings (room / lab). For this purpose all essential tools, consumable & cleaning materials viz. Ladder, Cloth, Cotton west, Soap detergent etc. are to be arranged by the AC maintenance contractor. All the consumable materials to use shall be of reputed make and or shall be used in consultation of concerned Section In-charge.
Comprehensive Annual Maintenance of Hitachi make different models non-inverter Split type Air Conditioning units. • 1.5 TR capacity Split type AC unit
Comprehensive Annual Maintenance of carrier make non-inverter technology Split type Air Conditioning units. • 1.5 / 2.0 TR capacity Split type AC units
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .