| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.3 LAccepted-AOC FLAT NO 101 UGF FRONT LHS RZ B 49A KAILASHPURI PALAM COLONY NEW DELHI 110045 | SOUTH WEST | DELHI | 110045 | L1 | Accepted-AOC Lowest bidder | |
| 2 | L2₹10.8 L+₹2.5 L (30.0%)Rejected-Finance | L2 | Rejected-Finance Other than Lowest Bidder | |
| 3 | L3₹12.7 L+₹4.4 L (53.1%)Rejected-Finance | L3 | Rejected-Finance Other than Lowest Bidder | |
| 4 | L4₹13.9 L+₹5.5 L (66.8%)Rejected-Finance | L4 | Rejected-Finance Other than Lowest Bidder | |
| 5 | L5₹13.9 L+₹5.6 L (67.6%)Rejected-Finance 705 646 MALVIA NAGAR ALLAHABAD UP PIN 211003 | PRAYAGRAJ | UTTAR PRADESH | 211003 | L5 | Rejected-Finance Other than Lowest Bidder |
Tender Value
Refer Docs
EMD Value
₹27,000
Closing Date
23 Dec 2020, 6:00 pmClosed
GE AF Bamrauli
GE AF Bamrauli
OUTSOURCING FOR MAINTENANCE, MANNING AND OPERATION OF VARIOUS DG SET INSTALLATIONS AT SOUTH CAMP AND 71 RMU AT AF STN BAMRAULI
2020_MES_399661_1
8620/E8
Open Tender
Electrical and Maintenance Works
Item Rate
270 days
Bamrauli
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
GE AF Bamrauli
₹27,000
Yes
15 Jan 2021
1 Dec 2020
24 Dec 2020
1 Dec 2020
23 Dec 2020
15 Dec 2020
Amount
Outsourcing for maintenance, manning and operation of standby DG sets for the following pump houses comprising of equipments given against each Pump house Semi-skilled category industrial personnel possessing minimum ITI pass certificate/Intermediate (12th) pass certificate with 03 (THREE) years experience in the relevant nature of work at round the clock in 24 hours in three shifts per day each of 8 hours including Sunday and Holiday complete for the following pump house all as specified and directed by Engineer-in-Charge.
(a) Pump House No 7 and PH No 10 : (i) 62.50 KVA DG Set SM233/628/DG/2005 Make Kirloskar (ii) 62.50 KVA DG Set SM NYA Make Kirloskar (iii) AMF Panel of DG Set 62.50 KVA & DG Set LT Panel 62.50 KVA (iv) All water supply pumping set etc installed at PH No 7 and PH No 10. At round the clock in 24 hours in 03 [THREE] shifts per day each shift of 8 hours including Sunday and Holiday- Semi-skilled tradesman
(b) 71 RMU : (i) 125 KVA DG Set SM 233/6001-DG-03/17 Make Caterpillar (ii) AMF Panel of DG Set 125 KVA (iii) DG Set LT Panel 125 KVA. At round the clock in 24 hours in 03 [THREE] shifts per day each shift of 8 hours including Sunday and Holiday- Semiskilled tradesman
M&L for earthing complete with Galvanised earth plate electrode 600x600x6mm thick buried directly in ground (earth) pit not less than 2.25 mtr deep below ground level) with top edge of the plate not less than 1.5 meters below normal ground level connected to galvanised iron strip 32x6mm as earthing lead by means of bolts, nuts, check-nuts and washers of galvanised iron or steel besides welding at all joints as shown in drawings and including excavation and earth work, GI pipe light grade 40mm bore for protection of GI strip from earth electrode to and including the earth test point of galvanised Iron/steel of size 75mm x 75mm x 25mm, supplying and laying charcoal stone aggregate) chamber and mild steel angle iron frame 40x40x3mm and RCC cover 40mm thick (1:2:4) type B-1 using 20mm graded crushed stone aggregate reinforced with 8mm dia TMT BARS @ 75mm O/O both ways with mild steel handle 12mm dia, PGI funnel with wire mesh, 20 MM dia GI pipe light grade for watering all as shown in electrical plate No.3 of MES SSR Part - 1 complete all as specified and directed.
Note for item No 1 (i) The trademan should wear uniform and badge with name during duties hours no civil dress is allowed. (ii) The work for maintenance and operation comprises of above installation for Nos of shifts mentioned against each item for 1 Semi-skilled operator per shift. The contractor & Engineer-in-Charge will ensure the same. (iii) It is the responsibility of AGE to ensure that attendance register is maintained at all the installation duly signed and kept on record and payment of trade men for the Nos of days/ month present will only be made, Engineer-in-Charge will be responsible for payment of trades men in his presence. (iv) In case the contractor does not operate the DG set/pumping set or any plant for any shift or part thereof due to any reason whatsoever, recovery at double the quoted unit rate of per shift/ Prevailing minimum fair wages whichever is higher shall be deducted. (v) DG set supply/ Pumping supply hrs shall be observed as mentioned in particular specification here in after or as directed. (vi) The operator can be deputed to any other location in the jurisdiction of GE(AF) Bamrauli as per requirement of Engineer-in-Charge. (vii) DHPP-N shall be arranged by the Department as per requirement and shall be issued to contractor free of cost for bonafide Govt use only under Sch 'B' & a pucca bound register shall be maintained showing day to day input/output/consumption of materials issued duly signed by JE/Engineer-in-Charge and contractor. Necessary arrangement for collection of materials issued by Govt will be made by the contractor without any extra cost to the Govt. (viii) The quoted rate is deemed to be include for cleaning of all surrounding premises such as in side the pump house, toilet including outside cutting of grass shrubs etc and always keep clean and neat in all respect. In case any bad/adverse remark given by any visiting officer at any time the necessary recovery @ Rs 2000.00 per remark will be charged from the contractor as certified by Engineer-in-Charge and no claim whatsoever is admissible on this account, GE’s decision shall be final and binding on this account. (ix) Payment to operating staff / employees should be carried out through ECS or NEFT to their Bank Account.
Note for item No 1 (x) No payment to contractor shall be allowed without submission of proof of payment made to operaters / employees to their bank account. (xi) To ensure enforcement of rights conferred to labour under various acts and laws by principal employer shall strictly be followed. The quoted rates shall deemed to be inclusive of all statutory taxes, charges/contribution like EPF, ESIC, bonus, etc promulgated by State/Central Government from time to time including minimum wages applicable as notified and the contractor shall submit an undertaking on Rs.100/- non-Judiciary stap paper and notarised before entering into/accptance of contract.(xii) The EPF amount will be paid/reimbursed to the contractor after production of proper documentary evidence only.
Note :- Credit shown in credit schedule of tender document shall be considered by the tenderer while quoting the rates of various items. The same shall be recovered from various payment to contractor before handing over old material.
M/s Saravat and Company
M/s M A Traders
M/S Garg Sons
M/S V K MEHROTRA
M/S SWASTIK BUILDERS
M/S PRAGATEE ENTERPRISES
bharat construction
AARAV CONSTRUCTION
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .