Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 CrAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹1.9 Cr+₹28.0 L (17.5%)Admitted-Finance ANUPPUR M P | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S. DUBEY AND COMPANY L2 | RAHUL AGRAWAL L1 |
|---|---|---|---|---|---|
| 1.00Item Description/ Heading | |||||
| 1.01 | Cleaning of malma, muck slurry in gallery | 734.1 | Cum | 604 ₹4,43,396.4 | 490 ₹3,59,709 Lowest |
| 1.02 | Coal | 241.88 | Cum | 1,485 ₹3,59,191.8 | 1,150 ₹2,78,162 Lowest |
| 1.03 | Hard stone | 207.04 | Cum | 7,425 ₹15,37,272 | 6,500 ₹13,45,760 Lowest |
| 1.04 | Malma Cleaning /Removal of debries from galleries for site preparation and despog 50Mtr | 763.37 | Cum | 603 ₹4,60,312.11 | 450 ₹3,43,516.5 Lowest |
| 1.05 | RCC Work (1:2:4:) including centoring & shuttering | 296.32 | Cum | 9,490 ₹28,12,076.8 | 7,800 ₹23,11,296 Lowest |
| 1.06 | PCC work in UG including cantering & shuttering etc (1:2:4) | 29.4 | Cum | 2,475 ₹72,765 | 1,800 ₹52,920 Lowest |
| 1.07 | Brick massonary work with cement morter (1:6) upto 1.50m in height. | 591.9 | Cum | 3,348 ₹19,81,681.2 | 2,500 ₹14,79,750 Lowest |
| 1.08 | Brick massonary work with cement morter (1:6) above 1.50m in height. | 402.17 | Cum | 3,634 ₹14,61,485.78 | 2,500 ₹10,05,425 Lowest |
| 1.09 | 12mm thick cement plaster(1:6) both side ,board and side/roof/floor | 6,682.8 | Cum | 505 ₹33,74,814 | 410 ₹27,39,948 Lowest |
Tender Value
₹2.1 Cr
EMD Value
₹2.6 L
Closing Date
15 Aug 2026, 5:00 pmClosed
GENERAL MANAGER(OPRN.) BHATGAON AREA
OFFICE OF THE GENERAL MANAGER, BHATGAON AREA, DIST SURAJPUR, CG
Construction of 44 nos RCC,16 nos Brick work Isolation stoppings and 74 nos ventilation stopping at 18W ,17W ,16W and 15W proposed LHCM depillaring Panel in Massan Combined Seam And Const of 18 nos RCC ,12 nos Brick work Isolation stopping
2026_SECL_362542_1
GM/BHAT/SUR/e-Tender/26-27/04 Date 25/07/2026
Open Tender
Civil Works - Others
Item Rate
365 days
SHIWANI UG MINE BHATAGAON AREA
Please refer Tender documents.
5 documents required · 5 mandatory
₹2.6 L
30 Sept 2026
25 Jul 2026
17 Aug 2026
25 Jul 2026
15 Aug 2026
27 Jul 2026
25 Jul 2026 - 4 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Item Description/ Heading | |||||
| 1.01 | Cleaning of malma, muck slurry in gallery | 734.1 | Cum | 558.78 | ₹4,10,200.4 |
| 1.02 | Coal | 241.88 | Cum | 1,375.1 | ₹3,32,609.19 |
| 1.03 | Hard stone | 207.04 | Cum | 6,875.48 | ₹14,23,499.38 |
| 1.04 | Malma Cleaning /Removal of debries from galleries for site preparation and despog 50Mtr | 763.37 | Cum | 558.78 | ₹4,26,555.89 |
| 1.05 | RCC Work (1:2:4:) including centoring & shuttering | 296.32 | Cum | 8,785.33 | ₹26,03,268.99 |
| 1.06 | PCC work in UG including cantering & shuttering etc (1:2:4) | 29.4 | Cum | 2,291.83 | ₹67,379.8 |
| 1.07 | Brick massonary work with cement morter (1:6) upto 1.50m in height. | 591.9 | Cum | 3,100.71 | ₹18,35,310.25 |
| 1.08 | Brick massonary work with cement morter (1:6) above 1.50m in height. | 402.17 | Cum | 3,364.6 | ₹13,53,141.18 |
| 1.09 | 12mm thick cement plaster(1:6) both side ,board and side/roof/floor | 6,682.8 | Cum | 467.86 | ₹31,26,614.81 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.66 MB
Tendernotice_2.pdf
PDF • 0.17 MB
Tendernotice_3.pdf
PDF • 1.40 MB
BOQ_375468.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .