Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | H1₹368.5 CrAdmitted-Finance 2ND FLOOR ASHOKA HOUSE ASHOKA MARG ASHOKA NAGAR NASHIK MAHARASHTRA 422011 | NASHIK | MAHARASHTRA | 422011 | H1 | Admitted-Finance | |
| 2 | H2₹355.7 Cr−₹12.7 Cr (3.46%)Admitted-Finance | H2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/s. Ashoka Buildcon Ltd H1 | J M Mhatre Infra Pvt Ltd H2 |
|---|---|---|---|---|---|
| 1.00Schedule "A" | |||||
| 1.01 | Survey and soil exploration work, preparation of design and drawing and its proof checking and other preliminary works and as mentioned in detailed scope of work. The survey work shall include tree census taking GPS photographs, superimposing tree locations on Road alignment, preparing proposal for tree cutting permission, co-ordination for obtaining tree cutting permission, cutting of trees, plantation of trees, transplantation of trees as per the permission etc. complete | 1 | Job | 8,00,00,000 ₹8,00,00,000 | 7,00,00,000 ₹7,00,00,000 Lowest |
| 2.00Bridge Proper as mentioned in detailed scope of work | |||||
| 2.10 | Bridge BR - 4 | 23,807 | Sqm. | 90,000 ₹2,14,26,30,000 | 87,300 ₹2,07,83,51,100 Lowest |
| 2.20 | Bridge BR - 5 | 12,673 | Sqm. | 90,000 ₹1,14,05,70,000 | 87,300 ₹1,10,63,52,900 Lowest |
| 3.00R.E. wall Ramp for approach road including embankment and road crust, footpath, storm water drain, street lighting, crash barriers, development of central verge etc. as mentioned in detailed scope of work | |||||
| 3.01 | Bridge BR - 4 | 6,580 | Sqm. | 34,000 ₹22,37,20,000 | 32,000 ₹21,05,60,000 Lowest |
| 3.02 | Bridge BR - 5 | 2,880 | Sqm. | 34,000 ₹9,79,20,000 | 32,000 ₹9,21,60,000 Lowest |
Tender Value
₹293.9 Cr
EMD Value
₹2.9 Cr
Closing Date
3 Nov 2023, 5:00 pmClosed
SUPERINTENDING ENGINEER (AIRPORT)
NAVI MUMBAI INTERNATIONAL AIRPORT (NMIA), 2ND FLOOR, TOWER NO. 10, CBD BELAPUR RAILWAY STATION COMPLEX, CBD BELAPUR, NAVI MUMBAI.
Design and Construction of Bridges BR-4 and BR-5 on Gadhi River for eastern connectivity to Navi Mumbai International Airport (NMIA) Project.
2023_CIDCO_950444_1
CANO01/CIDCO/EE(AP-III)/23-24
Open Tender
Civil Works
Lump-sum
548 days
CIDCO LTD.
Please refer Tender documents.
5 documents required · 5 mandatory
₹70,800
₹2.9 Cr
Yes
24 Nov 2023
4 Oct 2023
6 Nov 2023
4 Oct 2023
3 Nov 2023
4 Oct 2023
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Schedule "A" | |||||
| 1.01 | Survey and soil exploration work, preparation of design and drawing and its proof checking and other preliminary works and as mentioned in detailed scope of work. The survey work shall include tree census taking GPS photographs, superimposing tree locations on Road alignment, preparing proposal for tree cutting permission, co-ordination for obtaining tree cutting permission, cutting of trees, plantation of trees, transplantation of trees as per the permission etc. complete | 1 | Job | 100 | ₹100 |
| 2Bridge Proper as mentioned in detailed scope of work | |||||
| 2.1 | Bridge BR - 4 | 23,807 | Sqm. | 100 | ₹23,80,700 |
| 2.2 | Bridge BR - 5 | 12,673 | Sqm. | 100 | ₹12,67,300 |
| 3R.E. wall Ramp for approach road including embankment and road crust, footpath, storm water drain, street lighting, crash barriers, development of central verge etc. as mentioned in detailed scope of work | |||||
| 3.01 | Bridge BR - 4 | 6,580 | Sqm. | 100 | ₹6,58,000 |
| 3.02 | Bridge BR - 5 | 2,880 | Sqm. | 100 | ₹2,88,000 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
BOQ_1656413.xls
BOQ • 0.31 MB
TENDERDOCUMENTCA012324AP3.pdf
Tender Documents • 22.69 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .