Tender Value
Refer Docs
EMD Value
₹6,755
Closing Date
13 Oct 2026, 3:00 pm
Block Developement Officer Erumapatti
Block Developement Office Erumapatti
Providing Drain at Jambumadai North Street Mariyamman Kovil to Tamilarasi House HO Vadavathur AT ERUMAPATTI BLOCK IN NAMAKKAL DISTRICT UNDER SFC Dt Pt 2026 27
2026_RDTN_708870_1
A2/2279/2026
Open Tender
Civil Works
Item Rate
90 days
Block Developement Office Erumapatti
Required Document as per Schedule
3 documents required · 3 mandatory
₹0
₹6,755
Yes
28 Sept 2026
28 Sept 2026
13 Oct 2026
28 Sept 2026
13 Oct 2026
28 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing Drain at Jambumadai North Street Mariyamman Kovil to Tamilarasi House HO Vadavathur AT ERUMAPATTI BLOCK IN NAMAKKAL DISTRICT UNDER SFC Dt Pt 2026 27 | - | - | - | - |
| - | Earth work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil as per SS 20 B for foundation | 82.5 | No | - | - |
| - | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for foundation | 13.75 | M | - | - |
| - | Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, | 307.13 | M | - | - |
| - | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire) | 0.12 | M | - | - |
| - | Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers | 1.66 | M | - | - |
| - | Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for foundation | 37.5 | M | - | - |
| - | Plastering with cement mortar 1:4mix to 20 mm thick includingcost and conveyance of all materials to site and all labour | 56.25 | M | - | - |
| - | GST Amount for providing Service to Government Contract Works for the above RENEWAL Works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) | 1 | GST Amount | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.42 MB
TECH.pdf
Tender Documents • 0.67 MB
BOQ_851874.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .