Loading…
Loading…
Tender Value
₹7.7 L
EMD Value
₹19,300
Closing Date
8 Oct 2026, 4:30 pm
Public Works Department
PRAVEEN R HULJI
Annual maintenance of M.K. Hubballi Bailawada Road from km. 0.00 to 9.70, km. 13.60 to 16.17 in Bailhongal Taluk For the year 2026-27
PWD/2026-27/RD/WORK_INDENT42351
PWD/2026-27/RD/WORK_INDENT42351
Open
Roads
Electronic Documents, First(One Cover)
PWD Division Office Belagavi
6 documents required · 6 mandatory
₹500
₹19,300
19 Sept 2026
19 Sept 2026
7 Oct 2026
PUBLIC WORKS DEPARTMENT
EXECUTIVE ENGINEER PUBLIC WORKS DEPARTMENT, BELAGAVI DIVISION, BELAGAVI
OFFICE OF THE ASSISTANT EXECUTIVE ENGINEER PUBLIC WORKS DEPARTMENT, SUB-DIVISION, BAILHONGAL.
: Head of Account :
3054-04-337-1-10-200 MDR Maintenance for the year 2026-27
: Name of Work : NAME OF WORK:
2026-27 ನೇ ಸಾಲಿನ ಬೈಲಹೊಂಗಲ ತಾಲೂಕಿನ ಎಂ.ಕೆ.ಹುಬ್ಬಳ್ಳಿ ಬೈಲವಾಡ ರಸ್ತೆ ಕಿ.ಮೀ. 0.00 ರಿಂದ 9.70 ರ ವರೆಗೆ , ಕಿ.ಮೀ. 13.60 ರಿಂದ 16.17 ರ ವರೆಗೆ ವಾರ್ಷಿಕ ನಿರ್ವಹಣೆ ಮಾಡುವುದು.
ESTIMATED COST : Rs 9.07 Lakhs.
HalagaTigadiTarihal road from Km 8.80 to19.15 SH31 to Gaddikoravinakoppa road from Km 0.00 to 6.20 Sampagoan MK Hubli via Pattihala KS from Km 0.00 to 0.39 and From Km 5.42 to 11.32 Approach road to SH-31 from Kallurfrom Km 0.00 to 0.65 Road Joining SH 138 to SH 31 Via Lakkundi Nagnanur From Km. 0.00 to Km. 7.00 Navalagatti p kendra to Hiremale P Kendra from Km 0.00 to 5.50 Pattihala K S to Neginhala from Km 0.00 to 5.00 Sampagoan Bailhongal via Chivatagundi from Km 0.00 to 4.00,from Km 6.00 to 15.53 & from Km 14.90 to 14.93 Deshnoor-Mattikoppa from Km 0.00 to 2.38 from Km 3.09 to 5.50Hanabaratti to Ramalingappanakolla from Km 0.00 to 5.00 Madhanabhavi-somanatti from Km 0.00 to 5.00 Hanumanatti-Hiremale via Bairanatti, Hannikeri from Km 0.00 to 7.00 Nesaragi Somanatti from Km 0.175 to 0.450, From Km 5.75 to 6.90 and From Km 7.05 to 8.50 Vannur-SH-31 via Sunakumpi from Km 0.00 to 11.00 of Bailhongal Taluka
PARAGRAPH 130(A) OF THE KARNATAKA PUBLIC WORKS
DEPARTMENTAL CODE.
E S T I M A T E.
Division. : Executive Engineer, PW Dept. Belagavi Division, Belagavi
Sub-Division . : AEE, PWD Sub-Dn. Bailhongal.
Fund Head. : 3054-04-337-1-10-200 MDR Maintenance for the year 2025-26
Service Head. :
Departmental Head. :
Estimate framed in the office of the Assistant Executive Engineer, P.W.D. Sub-Division, Bailhongal and probable expenses that will be incurred for the work of 2026-27 ನೇ ಸಾಲಿನ ಬೈಲಹೊಂಗಲ ತಾಲೂಕಿನ ಎಂ.ಕೆ.ಹುಬ್ಬಳ್ಳಿ ಬೈಲವಾಡ ರಸ್ತೆ ಕಿ.ಮೀ. 0.00 ರಿಂದ 9.70 ರ ವರೆಗೆ , ಕಿ.ಮೀ. 13.60 ರಿಂದ 16.17 ರ ವರೆಗೆ ವಾರ್ಷಿಕ ನಿರ್ವಹಣೆ ಮಾಡುವುದು For the Year 2025-26 Under HoA 3054-04-337-1-10-200 MDR Maintenance
Estimated Cost. : Rs.9.07 Lakhs
Administratively sanctioned under : No.____________Date ___________
Technically sanctioned under : No.____________Date ___________
Estimate Prepared by : Shri. Poornanannd Bagali, AE
Estimate Checked by : Shri.Anil M, AEE
(Call or Authority) :
" Separate Sheet Enclosed "
2026-27 ನೇ ಸಾಲಿನ ಬೈಲಹೊಂಗಲ ತಾಲೂಕಿನ ಎಂ.ಕೆ.ಹುಬ್ಬಳ್ಳಿ ಬೈಲವಾಡ ರಸ್ತೆ ಕಿ.ಮೀ. 0.00 ರಿಂದ 9.70 ರ ವರೆಗೆ , ಕಿ.ಮೀ. 13.60 ರಿಂದ 16.17 ರ ವರೆಗೆ ವಾರ್ಷಿಕ ನಿರ್ವಹಣೆ ಮಾಡುವುದು.
P.W.D. CODE PARA-133
C E R T I F I C A T E
This to certify that, Anil M, Assistant Executive Engineer, have personally visited the spot and prepared the estimate using sanctioned scheduled of rates provided for the most economical and safe way of executing work.
Assistant Executive Engineer
Public Works Dept.,
Sub division, Bailhongal.
C E R T I F I C A T E
(As required vide G.O.No.PWD.SL.CMS.96 Dtd: 27-6-1991)
Certified that, sufficient care has been taken while preparing the estimate in respect of the above mentioned work to see that all necessary items which are technically required for the work in sufficient quantity are included while preparing the estimate, and specification of items included are completed and correct.
Assistant Executive Engineer
Public Works Dept.,
Sub division, Bailhongal.
C E R T I F I C A T E
Certified that, the work proposed in this estimate has not been taken up under any other head / programme by any agency. The said work has not been included / proposed / over lapped in any other proposed or approved programme.
Assistant Executive Engineer
Public Works Dept.,
Sub division, Bailhongal.
2026-27 ನೇ ಸಾಲಿನ ಬೈಲಹೊಂಗಲ ತಾಲೂಕಿನ ಎಂ.ಕೆ.ಹುಬ್ಬಳ್ಳಿ ಬೈಲವಾಡ ರಸ್ತೆ ಕಿ.ಮೀ. 0.00 ರಿಂದ 9.70 ರ ವರೆಗೆ , ಕಿ.ಮೀ. 13.60 ರಿಂದ 16.17 ರ ವರೆಗೆ ವಾರ್ಷಿಕ ನಿರ್ವಹಣೆ ಮಾಡುವುದು.
ಬೈಲಹೊಂಗಲ ಉಪವಿಭಾಗದ 2026-27 ನೇ ಸಾಲಿನ ಬೈಲಹೊಂಗಲ ತಾಲೂಕಿನ ಎಂ.ಕೆ.ಹುಬ್ಬಳ್ಳಿ ಬೈಲವಾಡ ರಸ್ತೆ ಕಿ.ಮೀ. 0.00 ರಿಂದ 9.70 ರ ವರೆಗೆ , ಕಿ.ಮೀ. 13.60 ರಿಂದ 16.17 ರ ವರೆಗೆ ವಾರ್ಷಿಕ ನಿರ್ವಹಣೆ ಮಾಡುವುದು ಕಾಮಗಾರಿಯು 2026-27 ನೇ ಸಾಲಿನ ಲೆಕ್ಕ ಶೀರ್ಷಿಕೆ : 3054-04-337-1-10-200 ಜಿಲ್ಲಾ ಮುಖ್ಯ ರಸ್ತೆ ನಿರ್ವಹಣೆ ಅನುದಾನದಡಿ ರೂ. 6.54 ಲಕ್ಷಗಳಿಗೆ ಕಾರ್ಯಕ್ರಮ ಪಟ್ಟಿಯಲ್ಲಿ ಅನುಮೋದನೆಗೊಂಡಿರುತ್ತದೆ. ಸದರಿ ರಸ್ತೆಯ ಭಾಗಗಳಿಗೆ ನಿರ್ವಹಣೆಗಾಗಿ ಈ ಕೆಳಕಂಡ ಅಂಶಗಳನ್ನು ಅಳವಡಿಸಿ ಅಂದಾಜು ಪತ್ರಿಕೆಯನ್ನು ತಯಾರಿಸಲಾಗಿದೆ.
1 Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. a In area of light jungle,.
2 Maintenance of Drains The maintenance of drains include erosion, repair,clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.
3 Maintenance of Earth Shoulder (stripping excess soil) Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor, .
4 Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment. .
5 Patching of Shallow Potholes using SDBC Gr II 25 mm thick Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The Cost is inclusive of removing the failed materials & cleaning on the road surface, preparation of potholes to the required standards sizes before patching them and application of tack coat at 0.20 kg/m2 over the asphalt surface including lead, loading unloading, rolling and finishing etc., complete as per specification.
6 Patching of Deep Potholes 75mm thick by restoring the Granular Base course using material confirming to WBM Grade -II with B type Screenings standards wherever necessary by manual means including trimming the pothole to the required shape and size, cleaning the pothole, applying Prime Coat (SS1) at 0.70 kg per m2 over the WBM surface and covering the surface with SDBC 25mm thick including lead, loading unloading, rolling and finishing etc., complete as per specification.
7 White washing of parapet walls of CD work and tree truncksWhite washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technical specifications Clause 1916, .
8 Maintenance of Culverts Maintenance of Hume pipe Culvert by way of Clearing, Cleaning, Erosion repair, repairs to cracks, parapet wall and protection work as per drawing and technical specification Clause 1909,.
9 Maintenance of 200 m & km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 m & km stone and 5th km stone as per drawing and technical specification.Painting two coats with synthetic enamel paint.
ಸದರಿ ಅಂದಾಜು ಪಟ್ಟಿಯನ್ನು 2023-24 ನೇ ಸಾಲಿನ (2025-26 ಕ್ಕೆ ಮುಂದುವರೆದ) ಲೋಕೋಪಯೋಗಿ ಇಲಾಖೆ, ಏಕರೂಪ ದರಪಟ್ಟಿಯಂತೆ ದರಗಳನ್ನು ಅಳವಡಿಸಿ ರೂ. 9.07 ಲಕ್ಷಗಳಿಗೆ ತಯಾರಿಸಿ ತಾಂತ್ರಿಕ ಮಂಜೂರಾತಿಗಾಗಿ ಸಲ್ಲಿಸಲಾಗಿದೆ.
Assistant Executive Engineer, Executive Engineer,
PWD, Sub Division Bailhongal PWD, Division Belagavi
2026-27 ನೇ ಸಾಲಿನ ಬೈಲಹೊಂಗಲ ತಾಲೂಕಿನ ಎಂ.ಕೆ.ಹುಬ್ಬಳ್ಳಿ ಬೈಲವಾಡ ರಸ್ತೆ ಕಿ.ಮೀ. 0.00 ರಿಂದ 9.70 ರ ವರೆಗೆ , ಕಿ.ಮೀ. 13.60 ರಿಂದ 16.17 ರ ವರೆಗೆ ವಾರ್ಷಿಕ ನಿರ್ವಹಣೆ ಮಾಡುವುದು.
Recaptulation sheet
Sl. No. Description Amount
1 For Annual Maintenance Rs. 768,190.94 768193.81
4 Add for Misc & Rounding off Rs. 534.69 531.30
Assistant Executive Engineer, Executive Engineer,
Public Works Dept., Sub-Divn Bailhongal Public Works Dept., Divn Belagavi
2026-27 ನೇ ಸಾಲಿನ ಬೈಲಹೊಂಗಲ ತಾಲೂಕಿನ ಎಂ.ಕೆ.ಹುಬ್ಬಳ್ಳಿ ಬೈಲವಾಡ ರಸ್ತೆ ಕಿ.ಮೀ. 0.00 ರಿಂದ 9.70 ರ ವರೆಗೆ , ಕಿ.ಮೀ. 13.60 ರಿಂದ 16.17 ರ ವರೆಗೆ ವಾರ್ಷಿಕ ನಿರ್ವಹಣೆ ಮಾಡುವುದು.
ESTIMATE (ABSTRACT)
Sl. No. Description of Item Unit Qty. Rate Amount
1 Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. a In area of light jungle,. 100 m2 490.80 393.00 192884.40
2 Maintenance of Drains The maintenance of drains include erosion, repair,clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. m 2208.60 6.00 13251.60
3 Maintenance of Earth Shoulder (stripping excess soil) Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor, . m2 638.04 39.00 24883.56
4 Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment. . m2 441.72 97.00 42846.84
5 Patching of Shallow Potholes using SDBC Gr II 25 mm thick Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The Cost is inclusive of removing the failed materials & cleaning on the road surface, preparation of potholes to the required standards sizes before patching them and application of tack coat at 0.20 kg/m2 over the asphalt surface including lead, loading unloading, rolling and finishing etc., complete as per specification. m2 600.62 388.00 233040.08
6 Patching of Deep Potholes 75mm thick by restoring the Granular Base course using material confirming to WBM Grade -II with B type Screenings standards wherever necessary by manual means including trimming the pothole to the required shape and size, cleaning the pothole, applying Prime Coat (SS1) at 0.70 kg per m2 over the WBM surface and covering the surface with SDBC 25mm thick including lead, loading unloading, rolling and finishing etc., complete as per specification. m2 365.71 635.00 232223.47
7 White washing of parapet walls of CD work and tree truncksWhite washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technical specifications Clause 1916, . m2 75.00 27.00 2025.00
8 Maintenance of Culverts Maintenance of Hume pipe Culvert by way of Clearing, Cleaning, Erosion repair, repairs to cracks, parapet wall and protection work as per drawing and technical specification Clause 1909,. No 12.00 2047.00 24564.00
9 Maintenance of 200 m & km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 m & km stone and 5th km stone as per drawing and technical specification.Painting two coats with synthetic enamel paint. Km 12.00 206.00 2472.00
Total Amount 768190.94
Assistant Executive Engineer, Executive Engineer,
Public Works Dept., Sub-Dn. Bailhongal Public Works Dept., Dn. Belagavi
2026-27 ನೇ ಸಾಲಿನ ಬೈಲಹೊಂಗಲ ತಾಲೂಕಿನ ಎಂ.ಕೆ.ಹುಬ್ಬಳ್ಳಿ ಬೈಲವಾಡ ರಸ್ತೆ ಕಿ.ಮೀ. 0.00 ರಿಂದ 9.70 ರ ವರೆಗೆ , ಕಿ.ಮೀ. 13.60 ರಿಂದ 16.17 ರ ವರೆಗೆ ವಾರ್ಷಿಕ ನಿರ್ವಹಣೆ ಮಾಡುವುದು.
SL No Description of work Unit No Measurement Qty
1 Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. a In area of light jungle,.
Net Qty in 100 m2 490.80
2 Maintenance of Drains The maintenance of drains include erosion, repair,clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.
Net Qty 2208.60
3 Maintenance of Earth Shoulder (stripping excess soil) Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor, .
m2 Total Qty 638.04
4 Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment. .
m2 Total Qty 441.72
5 Patching of Shallow Potholes using SDBC Gr II 25 mm thick Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The Cost is inclusive of removing the failed materials & cleaning on the road surface, preparation of potholes to the required standards sizes before patching them and application of tack coat at 0.20 kg/m2 over the asphalt surface including lead, loading unloading, rolling and finishing etc., complete as per specification.
m2 Total Qty 600.62
6 Patching of Deep Potholes 75mm thick by restoring the Granular Base course using material confirming to WBM Grade -II with B type Screenings standards wherever necessary by manual means including trimming the pothole to the required shape and size, cleaning the pothole, applying Prime Coat (SS1) at 0.70 kg per m2 over the WBM surface and covering the surface with SDBC 25mm thick including lead, loading unloading, rolling and finishing etc., complete as per specification.
m2 Total Qty 365.71
7 White washing of parapet walls of CD work and tree truncksWhite washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technical specifications Clause 1916, .
White washing to CDs
Total Qty 75.00
8 Maintenance of Culverts Maintenance of Hume pipe Culvert by way of Clearing, Cleaning, Erosion repair, repairs to cracks, parapet wall and protection work as per drawing and technical specification Clause 1909,.
Repairs & vent clearance to CDs
Total Qty 12.00
9 Maintenance of 200 m & km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 m & km stone and 5th km stone as per drawing and technical specification.Painting two coats with synthetic enamel paint.
Total Qty 12.00
Assistant Executive Engineer, Executive Engineer,
PWD, Sub-Dn. Bailhongal Public Works Dept., Dn. Belagavi
2026-27 ನೇ ಸಾಲಿನ ಬೈಲಹೊಂಗಲ ತಾಲೂಕಿನ ಎಂ.ಕೆ.ಹುಬ್ಬಳ್ಳಿ ಬೈಲವಾಡ ರಸ್ತೆ ಕಿ.ಮೀ. 0.00 ರಿಂದ 9.70 ರ ವರೆಗೆ , ಕಿ.ಮೀ. 13.60 ರಿಂದ 16.17 ರ ವರೆಗೆ ವಾರ್ಷಿಕ ನಿರ್ವಹಣೆ ಮಾಡುವುದು.
S No Description of work SR Vol Page No Item No Basic Rate Area Wtage 0% Add 18% for GST Finished Rate Unit
1 Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. a In area of light jungle,. Vol-III 9 2.5 a 393.00 0.00 0.00 393.00 100 m2
2 Maintenance of Drains The maintenance of drains include erosion, repair,clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Vol-III 147 16.19 6.00 0.00 0.00 6.00 m
3 Maintenance of Earth Shoulder (stripping excess soil) Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor, . Vol-III 91 10.3 39.00 0.00 0.00 39.00 m2
4 Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment. . Vol-III 91 10.2 97.00 0.00 0.00 97.00 m2
5 Patching of Shallow Potholes using SDBC Gr II 25 mm thick Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The Cost is inclusive of removing the failed materials & cleaning on the road surface, preparation of potholes to the required standards sizes before patching them and application of tack coat at 0.20 kg/m2 over the asphalt surface including lead, loading unloading, rolling and finishing etc., complete as per specification. Vol-III 93 10.15 (i) 263.00 0.00 0.00 388.00 m2
6 Patching of Deep Potholes 75mm thick by restoring the Granular Base course using material confirming to WBM Grade -II with B type Screenings standards wherever necessary by manual means including trimming the pothole to the required shape and size, cleaning the pothole, applying Prime Coat (SS1) at 0.70 kg per m2 over the WBM surface and covering the surface with SDBC 25mm thick including lead, loading unloading, rolling and finishing etc., complete as per specification. Vol-III 93 10.15 (ii) 497.00 0.00 0.00 635.00 m2
7 White washing of parapet walls of CD work and tree truncksWhite washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technical specifications Clause 1916, . Vol-III 148 16.26 27.00 0.00 0.00 27.00 m2
8 Maintenance of Culverts Maintenance of Hume pipe Culvert by way of Clearing, Cleaning, Erosion repair, repairs to cracks, parapet wall and protection work as per drawing and technical specification Clause 1909,. Vol-III 147 16.20 (i) 2047.00 0.00 0.00 2047.00 No
9 Maintenance of 200 m & km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 m & km stone and 5th km stone as per drawing and technical specification.Painting two coats with synthetic enamel paint. Vol-III 148 16.24 (i) 206.00 0.00 0.00 206.00 Km
Assistant Executive Engineer, Executive Engineer,
Public Works Dept., Sub-Dn. Bailhongal Public Works Dept., Dn. Belagavi
PÀ£ÁðlPÀ ¸ÀgÀPÁgÀ
(¯ÉÆÃPÉÆÃ¥ÀAiÉÆÃV E¯ÁSÉ G¥À «¨sÁUÀ UÉÆÃPÁPÀ)
UÉÆÃPÁPÀ G¥À«¨sÁUÀzÀ 2024-25 £Éà ¸Á°£À ¯ÉPÀÌ ²Ã¶ðPÉ 3054 f¯Áè ªÀÄÄRå gÀ¸ÉÛUÀ¼À ¤ªÀðºÀuÉ PÁªÀÄUÁjUÀ¼À Bar Charts
Name of the Road : Annual Maintenance to Godachinamalki Falls-Godachinamalki-Malebail-Kanasageri-Kaithnal Hosur-Gada to join Mangasuli Laxmeshwar SH-73 road from Km 0.00 to 2.10, 2.30 to 9.55, 11.72 to 15.56 and 15.74 to 25.00 in Gokak Taluka Belgaum District for 2024-25
Road Category: MDR Sub Division : Gokak Division : Chikkodi Circle :Belagavi
1 row 600 mm CD @ Ch 1.5 2 row 750 mm CD @ Ch 1.8 & 2 row 900 mm @ Ch 1.86 Godachinamalki Major Bridge 1 row 900 mm CD @ Ch 3.4 & Ch 3.6 2 row 900 mm CD @ Ch 4.3 & 1 row 900 mm CD Ch 4.4 Malebail 2 row 900 mm CD @ Ch 6.5 & 2 row 600 mm CD Ch 6.8 2 row 600 mm CD @Ch 7.7 1 row 900 mm CD @Ch 8.9 Kanasageri 1 row 600 mm CD @ Ch 11.90 & 1 row 900 mm CD Ch 12 & 12.30 2 row 750 mm CD @Ch 13.60 2 row 750 mm CD @Ch 14.50 4 row 1200 mm CD @ Ch 15.6 & 1 row 1200 mm CD Ch 15.8 Kaithnal Hosur 1 row 900 mm CD @ Ch 16.2 & Ch 16.8 Canal crossing@ Ch 17.2 & 1 row 600 mm CD Ch 17.8 1 row 600 mm CD @ Ch 18 & 1 row 900 mm CD Ch 18.4 & 2 rows 600 mm CD Ch 18.43 ,18.80 3 row 750 mm CD @ Ch 19.3 & 1 row 900 mm CD @Ch 19.7 & 2 rows 900 mm CD Ch 19.80 Gada 3 row 900 mm CD @ Ch 20.00 & 1 row 900 mm CD @ Ch 20.9 3 row 600 mm CD @ Ch 21.9 Canal crossing@ Ch 22.8 4 rows 600 mm CD @ Ch 23 & 2 row 900 mm CD Ch 23.8 1 row 900 mm CD @ Ch 24.3 Gada cross
7.00 m Overlap SH 54
Carriage Way 5.5m IL Overlap SH 73 5.5m IL Overlap MDR 5.5m
5.50 m 3.75 m 3.75 m Single lane 3.75 m Single lane 3.75 m Single lane 3.75 m Single lane 3.75m
Last Five Year road Improved Details 0.00
Carriage Way WI 115338 Ch 5.55 to 6.50 5.5m
5.50 m 3.75 m WI 113877 Ch 3.00 to 5.55 WBM+SDBC Under App 2019-20 WBM+SDBC Under App 2019-20 3.75m
Proposed Year Details 0.00
3).Proposed works under Annual Works 2024-25
Annual Maintenance for 2024-25 Overlap SH 73 Annual Maintenance for 2024-25 Last 5 Years Developed Length (2024-25 Maintenance) Annual Maintenance for 2024-25 Overlap MDR Annual Maintenance for 2024-25 Overlap SH 54 Annual Maintenance for 2024-25 HEAD OF ACCOUNT From To Provisions (RC,Wd,ST, Ren) L (in Km)
APPENDIX-E Nil 0.00
Structure Chainage 3.00 9.55 13.00 15.74 21.00 24.00 0.00 Total Length (in Km) 0.00 0.00
Legends Desciption Silent Features 2).Maintenance for 2024-25
Completed Works & Under DLP Lane Width Details Total Length (in Km) HEAD OF ACCOUNT From To Provisions (RC,Wd,ST, Ren) L (in Km)
Works Under Annual Maintenance for 2024-25 Single Lane 21.75 Km(0.00 to 1.70,2.30 to 5.55,5.85 to 9.55,11.72 to 15.56,15.74 to 25.00 Km ) 21.750 Annual Maintenance for 2024-25 0.00 2.10 Maint 2.10
Proposed Works under 2024-25 Intermediate lane 0.70 Km(1.70 to 2.10,5.55 to 5.85 Km ) 0.700 Annual Maintenance for 2024-25 2.30 3.00 Maint 0.70
Work Under progress Two lane 0.00 Km 0.000 Last 5 Years Developed Length (2024-25 Maintenance) 3.00 6.50 Maint 3.50
Works Eligible for Renewal Two lane + PS 0.00 Km 0.000 Annual Maintenance for 2024-25 6.50 9.55 Maint 3.05
Major Bridges Four lane 0.00 Km 0.00 Annual Maintenance for 2024-25 11.72 15.56 Maint 3.84
Minor Bridges Major Bridges 1 Nos (2.45Km) Annual Maintenance for 2024-25 15.74 25.00 Maint 9.26
CD Minor Bridges Total Length (in Km) 22.45
Village/ City Name Railway Crossing Nil
Railway Crossing Overlap Length 2.55 Km( 2.10 to 2.30,9.55 to 11.72,15.56 to 15.74 Km) 2.55 Village/City Limit
Total Length excluding over lap length (in Km) 22.45 Name of Village/ City From To L (in Km)
4). On going works Total Length including over lap length (in Km) 25.00 Godachinamalki 2.10 2.40 0.30
HEAD OF ACCOUNT From To Provisions (RC,Wd,ST, Ren) L (in Km) Malebail 5.55 5.85 0.30
PRAMC 0.00 0.00 - 0.00 1). Completed Works and under DLP Kanasageri 10.48 12.08 1.60
SHDP Ph 4 Stage 2 0.00 0.00 - 0.00 HEAD OF ACCOUNT From To Provisions (RC,Wd,ST, Ren) L (in Km) Kaithnal Hosur 15.40 15.56 0.16
Total Length (in Km) 0.00 Gada 20.00 20.44 0.44
0.00 Total Length (in Km) 3.01
5). Eligible for Renewal Total Length (in Km) 0.00
HEAD OF ACCOUNT From To Provisions (RC,Wd,ST, Ren) L (in Km)
Ren 0.00 Other Department Works
Under From To L (in Km) 2024-25 Maintenance Abstract
No. Details Length KRDCL Description Length in Km
1 1). Completed Works and under DLP 0.00 KSHIP Last 5 Years Developed Length (2023-24 Maintenance) 3.50
Assistant Executive Engineer, Executive Engineer, 2 Last 3 Year Developed Length & 2024-25 Maintenance 22.45 SHDP More than 5 years Developed length (23-24 Maint) 18.95
P.W. Department, P.W. Department, 3 3).Proposed works under Annual Works 2024-25 0.00 PMGSY Total Maintenance length 22.45
Sub - Division, Gokak. Division, Chikkodi 4 4). On going works 0.00 PMGSY Total Length of the Road 22.45
5 5). Eligible for Renewal 0.00 Total Length (in Km) 0.00
Total Length (in Km) 22.45
FULL DETAIL BAR CHART - MDR ROAD ID BAI 29
NAME OF THE ROAD : M.K.HUBLI-BAILWAD ROAD KM 0.00 TO 16.17 IN BAILHONGAL TALUKA NET LENGTH=12.27
ROAD CATEGORY : MDR SUBDIVISION : BAILHONGAL DIVISION : BELAGAVI CIRCLE : BELAGAVI
START: LATTITUDE:15.7919 LONGITUDE:74.647245 END: LATTITUDE:15.6466 LONGITUDE:75.008
Holihosur Neginahal Village Yaradal Village
Road Details (CD Details)
Carriage Way 3.75 m
Last Five Year road Improved Details
3.75 m No Improvement In Last Five years OVER LAP SH-73 No Improvement In Last Five years
Proposed Year Details
Maintenance 2026-27 More Than 5 Years OVER LAP SH-73 Maintenance 2026-27 More Than 5 Years
Structure Chainage 9.70 9.00 16.17
Legends Desciption Silent Features 2).Maintenance for 2026-27
Completed Works & Under DLP Lane Width Details Total Length (in Km) HEAD OF ACCOUNT From To Provisions (RC,Wd,ST, Ren) L (in Km)
Works Under Annual Maintenance for 2023-24 (More Than 5 Year) Single Lane Nil 0.000 3054 MDR 0.00 9.70 Maint 9.70
Proposed Works under 2024-25 Intermediate lane Nil 0.000 3055 MDR 13.60 16.17 Maint 2.57
Work Under progress Two lane Nil 0.000 Total Length 12.27
Works Eligible for Renewal Two lane + PS 0.00 to 16.17 12.270 3. Proposed Work
Major Bridges Four lane Nil 0.000 HEAD OF ACCOUNT From To Provisions (RC,Wd,ST, Ren) L (in Km)
Minor Bridges Major Bridges Nil 0.000 Nil 0.00 0.00 0.00 0.00
CD Minor Bridges Nil 0.000
Village/ City Name Railway Crossing Nil 0.000 Village/City Limit
Railway Crossing Overlap Length Nil 3.900 Name of Village/ City From To L (in Km) 8.10
Works Under Annual Maintenance for 2023-24 (Less Than 5 Years) Total Length excluding over lap length (in Km) 12.27 Holihosur 5.25 5.60 0.35
4). On going works Total Length including over lap length (in Km) 16.17
HEAD OF ACCOUNT From To Provisions (RC,Wd,ST, Ren) L (in Km) Neginahal 9.60 9.70 0.10
Appendix E 5054 Imp 0.00 0.00 RC 0.00 1). Completed Works and under DLP
Appendix E 5054 Imp 0.00 0.00 RC 0.00 HEAD OF ACCOUNT From To Provisions (RC,Wd,ST, Ren)
Total Length (in Km) 0.00
5). Eligible for Renewal /Non Feasible
HEAD OF ACCOUNT From To Provisions (RC,Wd,ST, Ren) L (in Km) Sl.No Details L(Km)
Nil 0.00 0.00 - 0.00 1 1) Completed Works and under DLP 0.00 Other Department Works 2024-25 Maintenance Abstract
2 2).Maintenance for 2026-27 12.27 Under From To L (in Km) Description Length in Km
3 3) Proposed works under Annual Works 2026-27 0.00 KRDCL 0.00 0.00 0.00 Less 5 Years Developed Length 0.00
4 4) On going works 0.00 KSHIP 0.00 0.00 0.00 More than 5 years Developed length 12.27
Assistant Executive Engineer, Executive Engineer, 5 5) Eligible for Renewal 0.00 SHDP 0.00 0.00 0.00 Total Maintenance length 12.27
P.W. Department, P.W. Department, 12.27 PMGSY 0.00 0.00 0.00 Total Length of the Road 12.27
Sub - Division, Bailhongal Division, Belagavi PMGSY 0.00 0.00 0.00
Total Length (in Km) 0.00
Name of the Road :) Betageri-Ningapur-Khaparatti-Khandratti-Tigadi-Sunadholi-Mudalagi-Shivapur-Khanatti upto Taluka Border from Km. 0.00 to 33.50 km in Gokak taluka
Road Category: STATE HIGHWAY Sub Division : GOKAK Division :CHIKODI Circle :BELGAVI
BETAGERI CD CD NINGAPUR CD CD KAPPARATTI CD CD KHANDRATTI CD CD CD TIGADI CD CD CD CD CD SUNADHOLI CD CD CD CD CD CD MUDALAGI CD CD CD CD CD SHIVAPUR CD CD CD CD CD KHANATI CD CD CD TALUKA BORDER
Carriage Way OVERLAP SH-134 OVERLAP SH-44
Village/City Limit
Appendix-E 2021-22 Annual Maintenance for 2022-23 OVERLAP SH-134 Annual Maintenance for 2022-23 OVERLAP SH-44 Appendix-e 2019-20 Annual Maintenance for 2022-23 Appendix-e 2019-20 Appendix-e 2019-20 SHDP-4 PHASE-1 Annual Maintenance for 2022-23 Name of Village/ City From To L (in Km)
BETAGERI 0.00 0.95 0.95
KHANDRATTI 8.10 8.20 0.10
Legends Desciption Silent Features 3).Proposed works under Annual Works 2022-23 2).Maintenance for 2022-23 TIGADI 13.00 13.70 0.70
Completed Works & Under DLP Lane Width Details Total Length (in Km) HEAD OF ACCOUNT From To Provisions (RC,Wd,ST, Ren) L (in Km) HEAD OF ACCOUNT From To Provisions (RC,Wd,ST, Ren) L (in Km) SUNADHOLI 16.70 17.00 0.30
Works Under Annual Plan 2022-23 Single Lane 8.33 0.00 3054 4.20 5.30 Maint 1.10 MUDALAGI 25.00 25.10 0.10
Proposed Works under 2022-23 Intermediate lane 24.30 Total Length (in Km) 0.00 5.40 13.00 Maint 7.60 SHIVAPUR 30.30 30.60 0.30
Work Under progress Two lane 4). On going works 15.70 16.2 Maint 0.46 KHANATI 32.00 32.10 0.10
Works Eligible for Renewal Two lane + PS HEAD OF ACCOUNT From To Provisions (RC,Wd,ST, Ren) L (in Km) 25.10 33.4 Maint 8.33 Total Length (in Km) 3.35
Major Bridges Four lane Appendix-E 2021-22 0.00 4.20 Wd 4.20 Total Length (in Km) 17.49
Minor Bridges Major Bridges Appendix-e 2019-20 13.70 15.70 RC 2.00 1). Completed Works and under DLP Other Department Works
CD Minor Bridges Appendix-e 2019-20 16.16 17.50 RC 1.34 HEAD OF ACCOUNT From To Provisions (RC,Wd,ST, Ren) L (in Km) Under From To L (in Km)
Village/ City Name Railway Crossing Appendix-e 2019-20 17.50 18.10 RC 0.60 SHDP-4 PHASE-1 18.10 25.10 rc 7.00 KRDCL 0.00
Railway Crossing Overlap Length 0.80 Total Length (in Km) 8.14 Total Length (in Km) 7.00 KSHIP 0.00
Total Length (in Km) 33.43 5). Eligible for Renewal SHDP-4 PHASE-1 18.10 25.10 7.00
HEAD OF ACCOUNT From To Provisions (RC,Wd,ST, Ren) L (in Km) No. Details Length Total Length (in Km) 7.00
0.00 1 1). Completed Works and under DLP 7.00
2 2).Maintenance for 2022-23 17.49
3 3).Proposed works under Annual Works 2022-23 0.00
4 4). On going works 8.14
5 5). Eligible for Renewal 0.00
Total Length (in Km) 32.63
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
1.xlsx
Others - ESTIMATE • 0.13 MB
Formats and govt GOs.zip
Others - Formats and govt GO • 20.38 MB
42351 BID DOC GEN KW-1.doc
Tender Document • 1.61 MB
9 MK Hubli Bailwad BC.xlsx
Others - BARCHART • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .