| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.0 LAdmitted-Finance | ₹12.0 L | L1 | Admitted-Finance |
| 2 | L2₹13.9 L+₹1.8 L (15.1%)Admitted-Finance | ₹13.9 L+₹1.8 L (15.1%) | L2 | Admitted-Finance |
| 3 | L3₹15.2 L+₹3.2 L (26.6%)Admitted-Finance KHOITADIH PROJECT BILPAHARI BARDHAMAN BARDHAMAN 713378 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713378 | ₹15.2 L+₹3.2 L (26.6%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | BABLU SINHA L3 | AJAY KUMAR TIWARI L1 | JAMAL AND MALEK COMPANY L2 |
|---|---|---|---|---|---|---|
| 1.00Shifting of Load Centre with all SHCM package machineries in 41EL development district of RIV seam at Khottadih Colliery. (Inclusive of EPF/CMPF) | ||||||
| 1.01 | Proper handling and hanging of 70 sqmm, 6.6KV PVCDWA Cable from 40L substation at every 50 mtr pillar 750 mtr (15 times) | 180 | Manshift | 1,310.28 ₹2,35,850.4 | 1,035 ₹1,86,300 Lowest | 1,255.5 ₹2,25,990 |
| 1.02 | Opening and rerouted of 16,25,95 sqmm (1250 mtr) trailing cables of Shuttle car, RB, CM and feeder at each 48 mtr pillar shifting (15 times) | 180 | Manshift | 1,310.28 ₹2,35,850.4 | 1,035 ₹1,86,300 Lowest | 1,255.5 ₹2,25,990 |
| 1.03 | Power feeding to CM from 95 sqmm trailing cable from its load centre for its marching (15 times) | 210 | Manshift | 1,310.28 ₹2,75,158.8 | 1,035 ₹2,17,350 Lowest | 1,403.07 ₹2,94,645.2 |
| 1.04 | Marching of CM with Load centre from outer route to shifting route with feeding power to CM at each 48 mtr pillar shifting (15 times) | 180 | Manshift | 1,310.28 ₹2,35,850.4 | 1,035 ₹1,86,300 Lowest | 1,116 ₹2,00,880 |
| 1.05 | Cable connection and rerouted the 16,25,95 sqmm (1250 mtr) cables from their machineries to load centre at each 48 mtr pillar shifting (15 times) | 180 | Manshift | 1,310.28 ₹2,35,850.4 | 1,035 ₹1,86,300 Lowest | 1,116 ₹2,00,880 |
| 1.06 | Anchorages of 02 nos. shuttle car cables at their loading route (15 times) | 60 | Manshift | 1,310.28 ₹78,616.8 | 1,035 ₹62,100 | 744 ₹44,640 Lowest |
| 1.07 | Shifting and installation of shuttle car, Roof Bolter, Feeder, CM with its water hose connection at each 48 mtr pillar shifting (15 times) | 150 | Manshift | 1,310.28 ₹1,96,542 | 1,035 ₹1,55,250 Lowest | 1,209 ₹1,81,350 |
| 1.08 | M-seal compound (hardner) | 25 | Kgs | 890 ₹22,250 | 703 ₹17,575 | 232.5 ₹5,812.5 Lowest |
| 1.09 | Wire mesh | 2 | Mtr | 42 ₹84 | 33 ₹66 Lowest | 279.04 ₹558.07 |
Tender Value
₹17.6 L
EMD Value
₹22,000
Closing Date
24 Aug 2026, 6:00 pmClosed
Area Engineer(E and M)
Office of the General Manager Pandaveswar Area , P.O. Pandaveswar, Dist.-Paschim Bardhaman, West Bengal-713346
Shifting of Load Centre with all SHCM package machineries in 41EL development district of RIV seam at Khottadih Colliery
2026_ECL_363645_1
GM-PND/EandM/26-27/79/2469 dated 12/08/2026
Open Tender
Electrical and Maintenance Works
Item Rate
60 days
Khottadih Colliery
Please refer Tender documents.
4 documents required · 4 mandatory
₹22,000
9 Sept 2026
13 Aug 2026
25 Aug 2026
13 Aug 2026
24 Aug 2026
13 Aug 2026
13 Aug 2026 - 17 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Shifting of Load Centre with all SHCM package machineries in 41EL development district of RIV seam at Khottadih Colliery. (Inclusive of EPF/CMPF) | |||||
| 1.01 | Proper handling and hanging of 70 sqmm, 6.6KV PVCDWA Cable from 40L substation at every 50 mtr pillar 750 mtr (15 times) | 180 | Manshift | - | - |
| 1.02 | Opening and rerouted of 16,25,95 sqmm (1250 mtr) trailing cables of Shuttle car, RB, CM and feeder at each 48 mtr pillar shifting (15 times) | 180 | Manshift | - | - |
| 1.03 | Power feeding to CM from 95 sqmm trailing cable from its load centre for its marching (15 times) | 210 | Manshift | - | - |
| 1.04 | Marching of CM with Load centre from outer route to shifting route with feeding power to CM at each 48 mtr pillar shifting (15 times) | 180 | Manshift | - | - |
| 1.05 | Cable connection and rerouted the 16,25,95 sqmm (1250 mtr) cables from their machineries to load centre at each 48 mtr pillar shifting (15 times) | 180 | Manshift | - | - |
| 1.06 | Anchorages of 02 nos. shuttle car cables at their loading route (15 times) | 60 | Manshift | - | - |
| 1.07 | Shifting and installation of shuttle car, Roof Bolter, Feeder, CM with its water hose connection at each 48 mtr pillar shifting (15 times) | 150 | Manshift | - | - |
| 1.08 | M-seal compound (hardner) | 25 | Kgs | - | - |
| 1.09 | Wire mesh | 2 | Mtr | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.33 MB
BOQ_376557.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .