| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹62.4 LAccepted-AOC | L-1 | Accepted-AOC Lowest bidder for the subject work. | |
| 2 | L-2₹63.5 L+₹49,895.60 (0.79%)Rejected-Finance | L-2 | Rejected-Finance other than the lowest bidder | |
| 3 | L-3₹66.3 L+₹3.3 L (5.26%)Rejected-Finance | L-3 | Rejected-Finance other than the lowest bidder | |
| 4 | L-4₹67.3 L+₹4.3 L (6.90%)Rejected-Finance | L-4 | Rejected-Finance other than the lowest bidder | |
| 5 | L-5₹69.4 L+₹6.4 L (10.2%)Rejected-Finance | L-5 | Rejected-Finance other than the lowest bidder |
| Sl No | Description | Qty | Unit | RAJPATI CONSTRUCTION L4 | M/s VIKAS TRADERS L1 | M/S RAKESH TRADERS L2 | AJIT ENTERPRISES L5 | CREATIVE CONSTRUCTION L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Taking down existing water proofing treatment of any description incl PCC padding, cement plaster any thickness from roof surfaces, cleaning of roof and prepairing it for further treatment incl make good necessary dubbing out wherever required and removing rubbish from site complete all as specified and directed. | 985 | Sqm | 10 ₹9,850 | 95 ₹93,575 | 100 ₹98,500 | 9 ₹8,865 Lowest | 50 ₹49,250 |
| 2.00 | M & L for preparing RCC roof surfaces with wire brush drying and cleaning to remove all foreign materials and washing with water to remove loose particle and applying APP modified bituminous water proofing membrane with polyester reinforcement and plain finish of 3 mm thick (total weight of the finished membrane not less than 3.8 kg/ sqm ± 5 % per sqm) confirming to IS 16532: 2017 over a coat of bitumen primer for bitumen membrane @ 0.40 litre/sqm by the same membrane manufacture of density at 25⁰C, 0.87-0.89 kg/ litre and viscosity 70-160 cps, laying over the primer coat using Butane Torch and sealing all joints, overlapping etc. as per Annex D of IS 16532: 2017 complete all as specified and as directed. (Rates Also Include the Ponding Test for the Waterproofing Treatment.) | 985 | Sqm | 369 ₹3,63,465 Lowest | 410 ₹4,03,850 | 500 ₹4,92,500 | 390 ₹3,84,150 | 465 ₹4,58,025 |
| 3.00 | M & L for cement concrete type B0 1:2:4 (12.5mm graded aggregate ) benching/ angle filleting at the junction of parapet and RCC roof complete all as specified and as directed. | 1 | Cum | 7,300 ₹7,300 | 6,000 ₹6,000 | 8,000 ₹8,000 | 4,800 ₹4,800 Lowest | 5,000 ₹5,000 |
| 4.00 | M & L for cutting grooves or chase in brick wall, 75 mm wide and 65 mm deep and including filling with cement mortar 1:4 mixed with water proofing as mentioned in Annex D of IS 16532: 2017, IS 16540: 2017 compound complete all as specified and as directed. | 20 | RM | 100 ₹2,000 | 200 ₹4,000 | 100 ₹2,000 | 70 ₹1,400 Lowest | 100 ₹2,000 |
| 5.00 | Material & labour for rendering 10 mm thick in cement mortar 1:4 over RCC slab mixed with water proofing compound @ 3% by weight of cement or manufacturer instruction all as specified. (Note;- water proofing compound shall be measured and paid separately as supply only) | 985 | Sqm | 172 ₹1,69,420 | 180 ₹1,77,300 | 180 ₹1,77,300 | 165 ₹1,62,525 | 160 ₹1,57,600 Lowest |
| 6.00 | M & L for cement concrete M15 (Nominal Mix) using 12.5 mm nominal size graded crushed stone aggregate mixed with water proofing compound as levelling course of roof padding finished even and fair complete all as specified and as directed. Note:- Water proofing compound shall be measured and paid for separately. | 49.25 | Cum | 5,140 ₹2,53,145 | 5,000 ₹2,46,250 | 6,000 ₹2,95,500 | 4,200 ₹2,06,850 Lowest | 4,333 ₹2,13,400.25 |
| 7.00 | M&L for grout of permanent bonding of strutural damage/crack, porosity of concrete to attend leakage/seepage with pressure grouting with 15mm bore GI Pipe Nozzle under the pressure of 5 kg/sqcm using cement based grout, treatment to be made as per instruction complete all as specified and directed. | 30 | Per Nozzle | 190 ₹5,700 | 300 ₹9,000 | 200 ₹6,000 | 650 ₹19,500 | 166 ₹4,980 Lowest |
| 8.00 | M&L for applying evenly a tack coat of industrial bitumen 85/25 at the rate of 1.2 kg per sq.m including cleaning surfaces complete all as specified and diretced | 985 | Sqm | 91 ₹89,635 | 100 ₹98,500 | 100 ₹98,500 | 130 ₹1,28,050 | 42 ₹41,370 Lowest |
| 9.00 | Supply only Integral waterproofing compound complete all as specified and directed. | 278.52 | Kg | 19 ₹5,291.88 Lowest | 60 ₹16,711.2 | 60 ₹16,711.2 | 45 ₹12,533.4 | 30 ₹8,355.6 |
| 10.00 | Dismantling floor, hearth or wall tiling including cement motar bedding (but not backing), removing serviceable tiles to stores and rubbish of the premisses complete all as specified and directed. | 930 | Sqm | 10 ₹9,300 | 10 ₹9,300 | 50 ₹46,500 | 8 ₹7,440 Lowest | 66 ₹61,380 |
Tender Value
₹70.2 L
EMD Value
₹1.3 L
Closing Date
30 May 2026, 6:00 pmClosed
Col Pawan Kumar, CWE
Headquarters, Commander Works Engineer, Bhopal, Military Engineer Services, SI Line, Bhopal, Pin Code - 462001 (Madhya Pradesh)
SPL REPAIR WK FOR IMPROVEMENT OF BLDG NO. P-155 (OR LIVING ACCN) AT DEF AND EMP COY, HQ 21 CORPS UNDER GE DRONACHAL
2026_MES_763545_1
84227/E8
Open Tender
Civil Works
Item Rate
180 days
Dronachal
AS PER NIT CONDITION
7 documents required · 7 mandatory
₹1,000
Yes
GE Dronachal
₹1.3 L
Yes
6 Jul 2026
5 May 2026
1 Jun 2026
5 May 2026
30 May 2026
25 May 2026
5 May 2026 - 25 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Taking down existing water proofing treatment of any description incl PCC padding, cement plaster any thickness from roof surfaces, cleaning of roof and prepairing it for further treatment incl make good necessary dubbing out wherever required and removing rubbish from site complete all as specified and directed. | 985 | Sqm | - | - |
| 2 | M & L for preparing RCC roof surfaces with wire brush drying and cleaning to remove all foreign materials and washing with water to remove loose particle and applying APP modified bituminous water proofing membrane with polyester reinforcement and plain finish of 3 mm thick (total weight of the finished membrane not less than 3.8 kg/ sqm ± 5 % per sqm) confirming to IS 16532: 2017 over a coat of bitumen primer for bitumen membrane @ 0.40 litre/sqm by the same membrane manufacture of density at 25⁰C, 0.87-0.89 kg/ litre and viscosity 70-160 cps, laying over the primer coat using Butane Torch and sealing all joints, overlapping etc. as per Annex D of IS 16532: 2017 complete all as specified and as directed. (Rates Also Include the Ponding Test for the Waterproofing Treatment.) | 985 | Sqm | - | - |
| 3 | M & L for cement concrete type B0 1:2:4 (12.5mm graded aggregate ) benching/ angle filleting at the junction of parapet and RCC roof complete all as specified and as directed. | 1 | Cum | - | - |
| 4 | M & L for cutting grooves or chase in brick wall, 75 mm wide and 65 mm deep and including filling with cement mortar 1:4 mixed with water proofing as mentioned in Annex D of IS 16532: 2017, IS 16540: 2017 compound complete all as specified and as directed. | 20 | RM | - | - |
| 5 | Material & labour for rendering 10 mm thick in cement mortar 1:4 over RCC slab mixed with water proofing compound @ 3% by weight of cement or manufacturer instruction all as specified. (Note;- water proofing compound shall be measured and paid separately as supply only) | 985 | Sqm | - | - |
| 6 | M & L for cement concrete M15 (Nominal Mix) using 12.5 mm nominal size graded crushed stone aggregate mixed with water proofing compound as levelling course of roof padding finished even and fair complete all as specified and as directed. Note:- Water proofing compound shall be measured and paid for separately. | 49.25 | Cum | - | - |
| 7 | M&L for grout of permanent bonding of strutural damage/crack, porosity of concrete to attend leakage/seepage with pressure grouting with 15mm bore GI Pipe Nozzle under the pressure of 5 kg/sqcm using cement based grout, treatment to be made as per instruction complete all as specified and directed. | 30 | Per Nozzle | - | - |
| 8 | M&L for applying evenly a tack coat of industrial bitumen 85/25 at the rate of 1.2 kg per sq.m including cleaning surfaces complete all as specified and diretced | 985 | Sqm | - | - |
| 9 | Supply only Integral waterproofing compound complete all as specified and directed. | 278.52 | Kg | - | - |
| 10 | Dismantling floor, hearth or wall tiling including cement motar bedding (but not backing), removing serviceable tiles to stores and rubbish of the premisses complete all as specified and directed. | 930 | Sqm | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
BOQ_855247.xls
BOQ • 0.38 MB
84227TenderDocuments.pdf
Tender Documents • 1.20 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .