| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹77.5 LAdmitted-Finance | ₹77.5 L | L1 | Admitted-Finance |
| 2 | L2₹1.0 CrAdmitted-Finance | ₹1.0 Cr | L2 | Admitted-Finance |
| 3 | L3₹1.2 CrAdmitted-Finance | ₹1.2 Cr | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Offshore Marinetech Private Limited L3 | NOBLE ENGINEERS L1 | Damodhartech international Pvt Ltd L2 |
|---|---|---|---|---|---|---|
| 2.00A-1 Group A - Pipeline Fabrication in LPG-III plant | ||||||
| 3.00 | 3" CM-40-2102 V-409 REPLACEMENT IBR | 1 | AU | 6,41,000 ₹1.2 L | 6,30,000 ₹1.1 L | 5,70,860 ₹1.0 L |
| 4.00 | V-409 STANDPIPE | 1 | AU | 3,41,000 ₹61,380 | 2,38,000 ₹42,840 | 2,15,730 ₹38,831.40 |
| 5.00 | C-402 NEAR STEAM TRAP REP | 1 | AU | 1,30,000 ₹23,400 | 1,40,000 ₹25,200 | 1,60,473 ₹28,885.14 |
| 6.00 | V-410 LG STAND | 1 | AU | 83,500 ₹15,030 | 86,000 ₹15,480 | 70,560 ₹12,700.80 |
| 7.00 | 3" CL-40-1901-B1A 1.5" BY-PASS REPL LV-1901 BYPASS | 1 | AU | 44,000 ₹7,920 | 90,000 ₹16,200 | 63,077 ₹11,353.86 |
| 8.00 | 2" P-40-1910-B1A REPLACEMENT LEF TO REBOILER DRAIN | 1 | AU | 1,82,000 ₹32,760 | 1,36,000 ₹24,480 | 1,24,829 ₹22,469.22 |
| 9.00 | LP STEAM HEADER END FLANGE REPLACEMENT | 1 | AU | 97,500 ₹17,550 | 1,20,000 ₹21,600 | 63,444 ₹11,419.92 |
| 10.00 | UV-1601B-DRAIN AND VENT REPLACEMENT | 1 | AU | 97,000 ₹17,460 | 1,20,000 ₹21,600 | 1,46,632 ₹26,393.76 |
| 11.00 | DRYER INLET/OUTLET SMALL BORE REPLACEMENT | 1 | AU | 1,72,000 ₹30,960 | 90,000 ₹16,200 | 68,610 ₹12,349.80 |
Tender Value
Refer Docs
EMD Value
₹11 L
Closing Date
5 Dec 2025, 3:00 pmClosed
Malloji Venkatesh CE M pH 9490492427
c8, CLG, CPD Mumbai Maker Towers, Cuffe Parade, Mumbai -400005
Fabrication and associated jobs in APU plants Uran ONGC Mumbai
2025_ONGC_255509_1
ZW1VC25004
Open Tender
Miscellaneous Works
365 days
Uran Plant
Please refer Tender documents.
9 documents required · 9 mandatory
₹0
₹11 L
30 Dec 2025
14 Nov 2025
8 Dec 2025
14 Nov 2025
5 Dec 2025
27 Nov 2025
14 Nov 2025 - 24 Nov 2025
Amount
A-1 Group A - Pipeline Fabrication in LPG-III plant
3" CM-40-2102 V-409 REPLACEMENT IBR
V-409 STANDPIPE
C-402 NEAR STEAM TRAP REP
V-410 LG STAND
3" CL-40-1901-B1A 1.5" BY-PASS REPL LV-1901 BYPASS
2" P-40-1910-B1A REPLACEMENT LEF TO REBOILER DRAIN
LP STEAM HEADER END FLANGE REPLACEMENT
UV-1601B-DRAIN AND VENT REPLACEMENT
DRYER INLET/OUTLET SMALL BORE REPLACEMENT
LZ-E402 D2 INSTALLATION OF NEW THERMOWELL AND SMALL BORES
STEAM DRUM LEG
40-F-401 HEATER WINCH
REPLACEMENT OF INSTRUMENT AIR LINES
MP STEAM (BATTERY LIMIT) IBR
LP STEAM (BATTERY LIMIT) IBR
PSV NEW LINE (FLARE LOCATION)
REPLACEMENT OF E-405 COOLING WATER BYPASS LINE VALVE AND FLANGE
FABRICATION OF LTCS FLARE LINE PROPANE CONDENSER
MP STEAM MANIFOLD IBR
LP STEAM MANIFOLD IBR
LPG PLANT COMMON DRAIN POINT CHANGE
W. DRAIN PT BETWEEN NRV AND DISCHARGE VALVE OF SECONDARY OTS A/B/C
DRYER AREA SMALL BORE (A) REPLACEMENT
DRYER INLET LINE FT-PTS
SMALL BORE REPLACEMENT IN RPV AND DPV AREA
SUPPLY OF TEST RINGS OF LPG-III VAPORIZER
Group A - Pipeline Fabrication in CFU-III plant (Existing Line Replacement)
INSTRUMENT AIR-EXISTING LINE REPLACEMENT
FT-1202 1/2" TAPING REPLACEMENT
X-2602 A/B DPT REPLACEMENT
FT-1203 1/2" TAPING REPLACEMENT
REPLACEMENT OF LV-1305 ISOLATION VALVE
26-PDT-1422 REPLACEMENT IN BAKSET FILTER
ATMOSPHERIC STEAM COND -TOP FLANGE REPLACEMENT
H2S SAMPLE POINT
OFF GAS SAMPLE POINT (NACE)
REPLACEMENT OF 14" IBR FLANGE AT B/L
Group A - Pipeline Fabrication in CFU-III plant (New Fabrication)
N2 CBD DRUM V-2610
SERVICE WATER CBD DRUM V-2610
REPLACEMENT OF GASKET, STUD/NUTS MP STEAM LINE STUBS & OTHER JOBS (OSBL)
INSTALLATION OF VALVE IN LPG COOLER (26-E-2606)
INSTALLATION OF GATE VALVE & DRAIN (26-E-2605)
2" PRESSURIZED STEAM LINE
BATTERY LIMIT LP STEAM LINE JOB
BATTERY LIMIT STEAM CONDENSATE LINE
Group A - Pipeline Fabrication in GSU-14 plant (New Fabrication)
FT-SMALL BORE
SAMPLE POINT FOR AMINE SOLUTION
SAMPLE POINT FOR ACID
PHE PLATFORM STEAM LINE CONDENSATE LINE
STEAM DRUM LEG
RE-BOILER STEAM CONDENSATE OUTLET (A/B)
REPLACEMENT OF FLANGE IN 14 FV 1602/03
PHE LEAN SIDE DRAIN POINT FOR VAPOUR RELEASE
PHE RICH IN SMALL BORE REPLACEMENT
REPLACEMENT OF INST AIR LINES IN GSU-14
SUPPLY OF TEST RINGS OF GSU-14 E-1401
Group A - Pipeline Fabrication in CHU-IV plant (Existing Line Replacement)
INSTRUMENT AIR
STEAM DRUM LEG
REPLACEMENT OF SERVICE WATER LINES
Group B - Structural fabrication in CHU-1V plant
Requirement of working platform for X-401 A/B & Prefilter of X-401A/B.
Partial replacement of hand railing
Support needed for FT
Group B - Structural fabrication in CFU III plant
Replacement of hand railing
Requirement of platform for operational use
Replacement of hand railing
Replacement of platform support (Tapered Beam)
Requirement of platform for operational use
Replacement of platform support (Tapered Beam)
Group B - Structural fabrication in LPG-III plant
Replacement of hand railing
Replacement of platform support (Tapered Beam)
Replacement of platform support (Tapered Beam)
Replacement of platform support (Tapered Beam) and concrete base
Replacement of concrete base
Requirement of platform for operational use
Requirement of platform for operational use (PSV isolation)
Requirement of platform for operational use
Group B - Structural fabrication in GSU-14 plant
Replacement of ejector line
Requirement of support replacement of fuel gas line
Requirement to replace drain line of pump
Requirement of platform for operational use(X-1404)
Requirement of steam trap basket
Requirement of line supports bracket for P-1402 to C-1402
Replacement of concrete base
Requirement of platform for operational use
Replacement of drain line of V-1403
Replacement of hose station support for V-1403
Replacement of Seal pot stand bracket of P-1408
Replacement of discharge line support for P-1408
Replacement of Seal pot stand bracket of P-1407
Replacement of discharge line support for P-1407
Replacement of Seal pot stand bracket of P-1406
Replacement of discharge line support for P-1406
Replacement of hand railing platform for T-1401
Replacement of stand pipes of switches
Replacement of pipe line supports
Replacement of working platform of manhole cover of V-1409
Replacement of hand railing of V-1409
Replacement of top platform of V-1409
Replacement of top platform and hand railing of T-1402
Replacement of stand pipes of switches of T-1402
Replacement of stand pipes T-1402(LT)
Replacement of stand pipes T-1402(LT)
Small Bores
Material Cost - Small Bores
Service Cost - Small Bores
Supply Of Blinds
Supply of Blinds (As per SOW)
Repair of Demister Pads & Cold Box Strainers
Repair of Demister Pads
Repair of Cold Box Strainers
Damodhartech international Pvt Ltd (BID ID -936595)
Offshore Marinetech Private Limited (BID ID -934349)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.18 MB
Tender_Document.rar
Tender Documents • 28.86 MB
BOQ_294380.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid