Tender Value
₹7.7 Cr
EMD Value
₹15.3 L
Closing Date
26 Oct 2026, 3:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
Above/Below/Par
TENDER
15 conditions · 4 needing a document upload
Financial Eligibility Criteria : The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
Similar nature of work: - "Works of wiring /cabling or installation and commissioning of electrical items (other than on coaches) such as lights, fans, pumps, charging arrangements earthings etc. (with or without supply of items/equipments) for 230 V, 1 phase or 415 V, 3 phase system or higher voltages." (Ref: Hqrs Lr.No:E.29/P/Similar nature of works Dt: 30.12.2014.)
Technical Eligibility Criteria: (a)The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i)Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or (ii)Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or (iii)One similar work costing not less than the amount equal to 60% of advertised value of the tender. (b) (1)In case of tenders for composite works (e.g. works involving more than one distinct component, such as Civil Engineering works, S&T works, Electrical works, OHE works etc. and in the case of major bridges - substructure, superstructure etc.), tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i)Three similar works each costing not less than the amount equal to 30% of advertised value of each component of tender, or (ii)Two similar works each costing not less than the amount equal to 40% of advertised value of each component of tender, or (iii)One similar work each costing not less than the amount equal to 60% of advertised value of each component of tender.
Eligibility Criteria:Special technical eligibility criteria:For Electrical Works up to 650 V : The tenderer shall possess a valid Electrical Contractor License, issued by any State Government or Union Territory Administration, authorizing execution of electrical works up to 650 V. The contractor shall have in his employment or shall engage a person holding a valid certificate of competency issued by any State Government or Union Territory Administration for supervision of electrical works up to 650 V.Offers not accompanied by a valid Electrical Contractor License and requisite Supervisor competency for works up to 650 V shall be summarily rejected. (Ref: Hqrs Lr.No:E.29/P/Similar nature of works Dt: 07.05.2026.)
37 conditions · 4 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
The General Conditions of Contract governing the performance of the works covered by this tender are the Indian Railway Standard General Conditions of Contract as amended from time to time up to date. A soft copy of the Indian Railway Standard General conditions of Contract is uploaded in the annexed documents to the tender. Hard copy may be perused in the office of the Senior Divisional Electrical Engineer/Maintenance/ Secunderabad Division/ South Central Railway / Secunderabad - 500025. In submitting the tender it would be deemed that the tenderer has kept himself fully Informed of the provision of the Indian Railways Standard General Conditions of Contract including all corrections and Amendments issued upto date and claim that he is not aware of any amendment or correction slip to the IRSGCC shall not be entertained.(As per IRGCC April 2022 or latest with amendments).
STUDY OF DRAWINGS AND LOCAL CONDITIONS: The drawings for the works can be seen in the office of the Senior Divisional Electrical Engineer/Maintenance/ Secunderabad Division/ South Central Railway/ Secunderabad - 500025. It should be noted that these drawings are meant for general guidance only and Railway may suitably modify them during the execution of work according to the circumstances without making the Railways liable for any claims on account of such changes. If there is any variation between the description in the tender and the detailed plans, the Engineer-in-Charge will operate the correct description and his decision is final and binding on the tenderer/ Contractor. The Tenderer/Contractor is required to inspect the sites of works and acquaint himself with the site conditions, availability of approaches for transporting of men and materials, space and other factors relating to the works, availability of labour, electricity and water, etc., before quoting his rates. The extent of lead and lift involved in the execution of works and any difficulties involved in the execution of work should also be examined before formulating the rates for complete items of works described in the schedule. The Tender submitted will be deemed to have been made after such inspection.(As per IRGCC April 2022 or latest with amendments).
DRAWINGS FOR WORKS: The percentage rates for the schedule items and itemized rates for the non-scheduled items quoted by the tenderer as may be accepted by the railways will, hold good irrespective of any changes, modifications, alterations, additions, omissions in the locations of structures and detailed drawings, specifications and/or the manner of executing the work. It should be specifically noted that some of the detailed drawings may not have been finalised by the Railway and will, therefore, be supplied to the contractor as and when they are finalised on demand. No compensation whatsoever on this account shall be payable by the Railway Administration. No claim whatsoever will be entertained by the Railway on account of any delay or hold up of the works arising out of delay in approval of drawings, changes, modifications, alterations, additions, omission and the site layout plans or detailed drawings and design and/or late supply of such material as are required to be arranged by the Railway or due to any other factor on Railway Accounts.(As per IRGCC April 2022 or latest with amendments).
Manual tenders sent by Post/FAX/Courier or in Person SHALL NOT BE ACCEPTED (As per IRGCC April 2022 or latest with amendments).
If the Bid of a Tenderer is seriously unbalanced in relation to the Engineer's estimate of the cost of work to be performed under the contract, the Railways may require the tenderer to produce detailed price analysis for any or all items of the Tender Schedule, to demonstrate the internal consistency of those prices with the construction methods and schedule proposed. (As per IRGCC April 2022 or latest with amendments).
CORRIGENDUM NOTICE ON IREPS: [I] Railway may modify the tender document by issuing online corrigendum through www.ireps.gov.in [II] Prospective Bidders shall keep watch for CORRIGENDUM upto 15 days prior to the deadline for submission of bids. For the purpose of CORRIGENDUM in the tender, NIT period is splitted as under: (a) ADVERTISEMENT PERIOD: The time during which all information pertaining to tender shall be available but offers cannot be submitted (b) OFFER SUBMISSION PERIOD: 15 days prior to closing of tender, during which tenderers can submit their offer. [III] To give prospective bidders a reasonable time on account of CORRIGENDUM in preparing their bids, the Railways may at their discretion extend as necessary, the deadline for submission of Tender document. Railways decision will be final and no correspondence will be entertained from prospective bidders. (As per IRGCC April 2022 or latest with amendments).
E-Tender shall be rejected if it is not accompanied by the prescribed: [1] Cost of tender document [2] EMD [3] Certificate(s) in support of technical eligibility criteria [4] Certificate(s) in support of financial eligibility criteria [5] Copy of documents in support of Proprietary concern/ Partnership firm / Pvt.Ltd.company / Limited Company / JV firm / Valid MOU for JV firms as detailed in COMMERCIAL COMPLIANCE. (As per IRGCC April 2022 or latest with amendments).
The bidders/tenderers should ensure that they are GST compliant. Quoted rates are inclusive of applicable GST as per GST ACT -2017 amended from time to time and as detailed in Special Conditions - General (under TAXES clause). (As per IRGCC April 2022 or latest with amendments).
The tenderer[s] may also upload the following documents alongwith his/their tender: The tenderer may upload method statement, which shall contain organizational set up and working systems to be adopted by the successful tenderers during the operation of the contract. It shall contain the details of man power and machineries in the prescribed format and details of methodology for planning, execution, monitoring and completion of the project. The methodology so adopted shall suit to the nature of work and shall also comply fully with best practice and current regulations. A comprehensive detailing for each activity like setting-up organization, safety plan, execution plan, quality assurance plan, sequence of work to achieve the mile stones, ensure targeted progress and quality and inturn deployment of resources, risk analysis and its mitigation strategy shall be given communication arrangement within his organization and with the railways for decisions, progress or any other matter connected with this project to ensure full information about the project including progress of work at different time scale shall also be furnished. (As per IRGCC April 2022 or latest with amendments).
Tenderer shall adhere to the time frame as mentioned in mile stone chart prescribed in the tender. (As per IRGCC April 2022 or latest with amendments).
Tenderer shall engage the personnel with requisite qualification as per Special Conditions of Contract. (As per IRGCC April 2022 or latest with amendments).
Tenderer shall deploy adequate number of plant and equipment for the execution of subject contract works to achieve progress as per mile stone chart. (As per IRGCC April 2022 or latest with amendments).
List of works completed in the last seven financial years giving description of work, organization for whom executed, approximate value of contract at the time of award, date of award and date of scheduled completion of work. Date of actual start, actual completion and final value of contract should also be given. (As per IRGCC April 2022 or latest with amendments).
List of works on hand indicating description of work, contract value, and approximate value of balance work yet to be done and date of award. (As per IRGCC April 2022 or latest with amendments).
Supportive documents/certificates from the organizations with whom they worked/are working as list of works completed and list of works on hand should be enclosed. (As per IRGCC April 2022 or latest with amendments).
[1] I/We have read the various conditions of the tender attached hereto and hereby agree to abide by the said conditions. I/We also agree to keep this tender open for acceptance for the period mentioned in the tender document [NIT HEADER] from the date fixed for opening the same and in default thereof, I/We will be liable for forfeiture of my/our Earnest Money Deposit submitted. [2] I/We offer to do the work at the percentage rates quoted by me/us in the attached schedule and bind myself/ourselves to complete the work within the period of completion given in this tender document [NIT HEADER] from the date of issue of letter of acceptance of this tender. I/We also hereby agree to abide by the IRS GCC and Special Conditions of contract in carryingout the works laid down by South Central Railway for the present contract. [3] The full value of the earnest money paid shall stand forfeited without prejudice to any other rights or remedies of the railway if [a]I/We do not execute the contract document within seven days after receipt of notice issued by the Railway that such documents are ready: OR [b] I/We do not commence the work within fifteen days after receipt of orders to that effect. [4] Until a formal agreement is prepared and executed, acceptance of this tender shall constitute a binding contract between us subject to modifications, as may be mutually agreed to between us and indicated in the letter of acceptance of my/our offer for this work. (As per IRGCC April 2022 or latest with amendments).
I/We fail to submit the requisite Performance Guarantee [P.G] in the prescribed format within the time limit as prescribed in GCC (as amended from time to time) from the date of issue of Letter of Acceptance, we are aware that the contract shall be terminated duly forfeiting EMD and other dues, if any payable against the contract. Also, I/We shall be debarred from participating in the retender for the work. (As per IRGCC April 2022 or latest with amendments).
I/We understand that no post-tender correspondence will be entertained, however, if any clarification is required by the Railway, the same will be sought from the tenderer. Also, I/We are aware that any Certificate/ Documents offered after the tender opening shall not be given any credit and shall not be considered. (As per IRGCC April 2022 or latest with amendments).
I/we do hereby solemnly affirm and state on behalf of the tenderer including its constituents as under: (As per IRGCC April 2022 or latest with amendments).
[i] I/We the tenderer(s) am/are signing this document after carefully reading the contents. [ii] I/We declare and certify that I/We have not made any misleading or false representation in the documents, forms, statements attached in proof of the qualification requirements. [iii] I/We also understand that my/our offer will be evaluated based on the documents/credentials uploaded alongwith the offer and the same shall be binding upon me/us. [iv] I/We declare that the information and the documents attached alongwith the tender by me/us are correct and I/We are fully responsible for the correctness of the information and the documents submitted by us. (As per IRGCC April 2022 or latest with amendments).
[i] I/We do hereby undertake that, if any of the certificates regarding eligibility criteria submitted by us are found to be forged/false/incorrect at any time during the process of evaluation of the tenders, it shall lead to forfeiture of the tender EMD. Further, I/We and all my/our constituents understand that my/our offer shall be summarily rejected. [ii] I/We also understand that, if the certificates submitted by us are found to be false/forged/ incorrect at any time after the award of the contract, it will lead to termination of the contract besides suspending of business for 5 years, with the tenderer and with all the partners in case of partnership firm and with all the members of a JV in case of a Joint Venture, forfeiture of EMD/SD and Performance Guarantee and any other action provided in the contract. (As per IRGCC April 2022 or latest with amendments).
It is certified that I/We have not been blacklisted or debarred by railways or any other ministry/ department/public sector undertaking of the government of India/State Government from participation in tenders/contract on the date of tender opening of bids, either in individual capacity or as a member of JV firm in which I/We were/are members. (As per IRGCC April 2022 or latest with amendments).
I/We indemnify and save harmless the Railway from and against all actions, suit proceedings losses, costs, damages, charges, claims and demands of every nature and description brought or recovered against the Railways by reason of any act or omission of the Contractor, his agents or employees, in the execution of the works or in his guarding of the same. All sums payable by way of compensation under any of these conditions shall be considered as reasonable compensation to be applied to the actual loss or damage sustained, and whether or not any damage shall have been sustained. (As per IRGCC April 2022 or latest with amendments).
The prices are inclusive of GST
Secunderabad Division Electrical Maintenance Department - (i) Provision of Lifts at SKP (02 Nos) and SEM (02 Nos) (ii) Provision of Lifts at LTRR (02 Nos) and UDGR (02 Nos) (iii) Provision of Lifts at DKJ (03 Nos) and KDM (02 Nos). (iv) Provision of Lifts at Jammikunta(JMKT) (02 Nos) and Sirpurkhagajnagar (SKZR) (03 Nos) (v) Provision of Lifts at GNP (02 Nos), ALER (02 Nos), BG (02 Nos), GT (03 Nos) and MLY (02 Nos) (vi) Provision of Lifts at FNB (01 Nos), JET (02 Nos), KQD (02 Nos), NCHS (02 Nos), NLRD (02 Nos) and SJVP (02 Nos) - Electrical arrangements.
E-M-SC-49-OT-2026-27~SCR
E-M-SC-49-OT-2026-27
Open
Works - General
6 Months
Hyderabad, Telangana
₹0
₹15.3 L
30 Sept 2026
30 Sept 2026
12 Oct 2026
93 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 7,65,35,400.5 | ||
| — | 7600.00 | — | — | ||
| [4*120]-SUPPLY AND ERECTION OF 4 CORE X 120 SQMM LTUG XLPE ALUMINUM ARMORED CABLE AS PER BIS SPECIFICATION IS 7098 PART I OR (LATEST AMENDMENTS ) ALONG WITH END TERMINATIONS | — | — | — | 66,57,600 | |
| — | 22300.00 | — | — | ||
| [4*16]-SUPPLY AND ERECTION OF 4 CORE X 16 SQMM LTUG XLPE ALUMINIUM ARMOURED CABLE AS PER BIS SPECIFICATION IS 7098 PART I OR (LATEST AMMENDEMENTS ) ALONG WITH END TERMINATIONS | — | — | — | 39,24,800 | |
| — | 35000.00 | — | — | ||
| [4*50]-SUPPLY AND ERECTION OF 4 CORE X 50 SQMM LTUG XLPE ALUMINUM ARMORED CABLE AS PER BIS SPECIFICATION IS 7098 PART I OR (LATEST AMENDMENTS ) ALONG WITH END TERMINATIONS | — | — | — | 1,39,30,000 | |
| — | 6100.00 | — | — | ||
| [4*70]-SUPPLY AND ERECTION OF 4 CORE X70 SQMM LTUG XLPE ALUMINUM ARMORED CABLE AS PER BIS SPECIFICATION IS 7098 PART I OR (LATEST AMENDMENTS ) ALONG WITH END TERMINATIONS | — | — | — | 33,97,700 | |
| — | 355.00 | — | — | ||
| SUPPLY & ERECTION OF 6 MODULE MODULAR PLATES WITH FRAME | — | — | — | 44,020 | |
| — | 8040.00 | — | — | ||
| [1*10]-SUPPLY, LAYING, CONNECTING & COMMISSIONING OF SINGLE CORE MULTI STRAND 10 SQ. MM FRLS CU.CONDUCTOR | — | — | — | 10,29,120 | |
| — | 9300.00 | — | — | ||
| [2*2.5+1*1.5]-SUPPLY AND ERECTION OF 2 NOS.. OF 2.5 SQ.MM, 1NO. 1.5 SQ.MM OF FRLS PVC INSULATED FLEXIBLE MULTISTRAND COPPER WIRE INCLUDING EARTH CONTINUITY WIRE . | — | — | — | 6,69,600 | |
| — | 5600.00 | — | — | ||
| [2*4+1*2.5] SUPPLY AND ERECTION OF 2 NOS.. OF 4.0 SQ.MM, 1NO. 2.5 SQ.MM OF FRLS PVC INSULATED FLEXIBLE MULTISTRAND COPPER WIRE INCLUDING EARTH CONTINUITY WIRE . | — | — | — | 6,04,800 | |
| — | 26000.00 | — | — | ||
| [3*1.5]-SUPPLY AND ERECTION OF 3 NOS.. OF 1.5 SQ.MM FR LS PVC INSULATED FLEXIBLE MULTISTRAND COPPER WIRE INCLUDING EARTH CONTINUITY WIRE . | — | — | — | 14,30,000 | |
| — | 7700.00 | — | — | ||
| [3*2.5] SUPPLY, LAYING,CONNECTING AND COMMISSIONING OF 3 CORE 2.5 SQ MM COPPER FLAT CABLE | — | — | — | 9,24,000 | |
| — | 18.00 | — | — | ||
| SUPPLY AND ERECTION OF 200A 4P ON-LOAD CHANGE OVER SWITCH IN OPEN EXECUTION WITH COMPLETE WITH ACCESSORIES ETC | — | — | — | 2,62,062 | |
| — | 38.00 | — | — | ||
| SUPPLY AND ERECTION OF 12 WAY DOUBLE DOOR (SPN) DISTRIBUTION BOARDS. | — | — | — | 65,626 | |
| — | 31.00 | — | — | ||
| SUPPLY, ERECTION, TESTING AND COMMISSIONING OF TPN DB-7 SEGMENT 12 WAY DB COMPRISING OF 100A MCCB AND OUTGOINGS BY 2 NOS. OF 63A FP MCBS, 2 NOS. OF 20A DP MCBS, 2 NOS. OF 63A FP RCCBS WITH 300MA SENSITIVITY COMPLETE WITH COPPER BUSBAR ETC. | — | — | — | 9,34,464 | |
| — | 18.00 | — | — | ||
| Supply and erection of DG set rating from 58.5 KVA to 62.5 KVA liquid cooled DG set with AMF panel and all accessories as per latest CPCB norms. | — | — | — | 1,41,10,164 | |
| — | 17.00 | — | — | ||
| [A3]- PREPARATION AND SUBMISSION OFCOMPLETION DRAWINGS IN A3 SIZE WITH ALL RELEVANT DETAILS AND MEASUREMENTS OF EXECUTED INSTALLATIONS, CABLE ROUTINGS, LIGHTING ARRANGEMENTS ETC. THE DRAWINGS SHALL BE SUBMITTED IN 1 (SOFT COPY)+ 3 (HARD COPY) DULY SIGNED BY THE CONCERNED SUPERVISOR, CONTRACTOR, CONTROLLING OFFICER AND TO BE FURNISHED ALONG WITH BILLS. | — | — | — | 1,70,000 | |
| — | 176.00 | — | — | ||
| SUPPLY AND ERECTION OF EARTHING ARRANGEMENTS | — | — | — | 6,15,648 | |
| — | 176.00 | — | — | ||
| SUPPLY AND ERECTION OF RCC PRECAST SLABS WITH HOOK TO COVER EARTH PITS OF DIMENSIONS AS SHOWN IN DRG ALL THE REQUIRED MATERIALS FOR THIS WORK I.E. STONES, CEMENT, IRON AND SAND ETC. ARE TO BE SUPPLIED BY CONTRACTOR.). Note: Drawing to be collected from Sr.DEE/M/SC office) | — | — | — | 27,456 | |
| — | 176.00 | — | — | ||
| SUPPLY AND ERECTION PROVISION OF RCC EARTH PIT HOLLOW BOX OF SIZE 300 MM X 300 MM X 300MM WITH 50 MM WALL THICKNESS AS PER DRG, BY USING M20 GRADE PRECAST RCC. IT INCLUDES FIXING OF EARTH PITS AT VARIOUS LOCATIONS (ALL THE REQUIRED MEN, MATERIAL AND TRANSPORTATION ARE TO BE ARRANGED BY CONTRACTOR). Note: Drawing to be collected from Sr.DEE/M/SC office. | — | — | — | 1,29,536 | |
| — | 72.00 | — | — | ||
| SUPPLY OF EARTH PIT MATERIALS AND CONSTRUCTION OF EARTH PIT AS PER IS 3043:1987 SPECIFICATION. THIS ITEM ALSO INCLUDES OF SUPPLYAND ERECTION OF CI PIPE OF SIZE OF 100MM INNER DIAMETER, 13MM THICKNESS AND 3000MM LENGTH. THIS WORK ALSO INCLUDES OFFABRICATION AND FIXING OF GI STRIPS FOR EARTHING CONNECTION. EXCAVATED EATHPIT SHOULD BE FILLED BY MIXTURE OF COKE/CHARCOAL, SALTAND SAND UP TO TOP. PROVISION OF BRICK MASONARY CHAMBER OF SIZE 650MMX650MM AND DEPTH UPTO 1000MM INCLUDING LIGHT TYPECI COVER FRAME AND APPLYING 12MM THICK CEMENT PLASTER IN 1:3 INSIDE AND TO ALL THE EXPOSED FACES UP TO 300MM BELOW.FOUNDATION LEVEL, CURING ETC., ALL REQUIRED MATERIALS FOR THIS JOB SUCH AS CI PIPE COVER WITH FRAME, SALT, CEMENT SAND, CHARCOALGRAVEL, BRICKS ETC REQUIRED BOLTS, NUTS AND DOUBLE WASHERS, NUMBER PLATES OR PAINTED PLATES. TENTATIVE QUANTITY OF SALT ANDCHARCOAL SHALL BE OF 2.5CMT. THE CI PIPE SHOULD BE PAINTED WITH 2 COATS OF BITUMEN PAINT AS PER THE DIRECTIONS OF RLY ENGINEERAT SITE. NOTE: THE WORK SHOULD BE STRICTLY DONE AS PER IS 3043:1987 SPECIFICATION OR LATEST. | — | — | — | 6,26,400 | |
| — | 38.00 | — | — | ||
| CONCRETE FOR FOUNDATIONS AND PLINTH IN HARD SOIL | — | — | — | 1,63,096 | |
| — | 6300.00 | — | — | ||
| SUPPLY AND ERECTION OF 100 MM, 'B' CLASS GI PIPES AS PER IS:1239 ALONG WITH ACCESSORIES. | — | — | — | 56,25,900 | |
| — | 28900.00 | — | — | ||
| SUPPLY AND ERECTION OF 8 SWG GI WIRE | — | — | — | 2,89,000 | |
| — | 11400.00 | — | — | ||
| SUPPLY AND ERECTION OF 110 MM SIZE OF HDPE PIPE OF GRADE PE-100, PN 6 (6KG/CM2 CAPACITY) WITH ACCESSORIES AS PER IS 4984 - 1995 (SDR - 21) | — | — | — | 47,76,600 | |
| — | 1920.00 | — | — | ||
| SUPPLY AND ERECTION OF 50MM SIZE OF HDPE PIPE OF GRADE PE-100, PN 6 (6KG/CM2 CAPACITY) WITH ACCESSORIES | — | — | — | 1,74,720 | |
| — | 19000.00 | — | — | ||
| SUPPLY AND ERECTION OF 63 MM OF HDPE PIPES OF GRADE PE-100, PN 6 (6KG/CM2 CAPACITY) WITH ACCESSORIES AS PER IS 4984 - 1995 | — | — | — | 25,27,000 | |
| — | 150.00 | — | — | ||
| SUPPLY, ERECTION, CONNECTING, TESTING AND COMMISSIONING OF 100W LED HIGHBAY LIGHT WITH PDC HOUSING SUITABLE FOR CELING ( SURFACE/SUSPENDED) MOUNTING WITH SYSTEM EFFICIENCY 150LM/W, COMPLETE WITH NECESSARY MOUNTING ACCESSORIES, CLAMPS AND HARDWARE ETC, AS PER SPECIFICATION ENCLOSED. | — | — | — | 8,90,400 | |
| — | 550.00 | — | — | ||
| [24W]-SUPPLY, FIXING, CONNECTING AND COMMISSIONING OF RECESS CIRCULAR ROUND LED DOWN LIGHT OF 24W CLASS LED FITTING WITH NECESSARY MOUNTING ACCESSORIES, CLAMPS AND HARDWARE ETC AS PER SPECIFICATION ENCLOSED. | — | — | — | 7,78,800 | |
| — | 730.00 | — | — | ||
| [40W]-SUPPLY OF SURFACE MOUNTED LED 40W LUMINAIRE BATTENTYPE FITTING COMPLETE WITH NECESSARY MOUNTINGACCESSORIES, CLAMPS AND HARDWARE ETC. AS PER AS PER SPECIFICATION ENCLOSED. | — | — | — | 4,78,880 | |
| — | 30.00 | — | — | ||
| SUPPLY AND ERECTION OF 63A C CURVE 4P MCB WITH 10KA BREAKING CAPACITY | — | — | — | 42,900 | |
| — | 720.00 | — | — | ||
| SUPPLY & ERECTION OF 6/10/16/20/25/32A, C-CURVE DP MCBS WITH 10KA BREAKING CAPACITY | — | — | — | 3,25,440 | |
| — | 720.00 | — | — | ||
| SUPPLY & ERECTION OF 6/10/16/20/25/32A, C-CURVE SP MCBS WITH 10KA BREAKING CAPACITY | — | — | — | 1,00,080 | |
| — | 12.00 | — | — | ||
| SUPPLY AND ERECTION OF 32A 4 POLE MCCBS WITH 16 KA BREAKING CAPACITY WITH ADJUSTABLE THERMAL MAGNETIC RELEASE WITH EXTENDED ROTOR HANDLE, SPEREDER LINKS(4 NOS-02 SETS), PHASE BARRIERS | — | — | — | 48,420 | |
| — | 98.00 | — | — | ||
| SUPPLY AND ERECTION OF 100A 4 POLE MCCB WITH 25KA BREAKING CAPACITY WITH ADJUSTABLE THERMAL MAGNETIC RELEASE WITH EXTENDED ROTOR HANDLE,SPEREDER LINKS(4 NOS-02 SETS), PHASE BARRIERS | — | — | — | 6,06,522 | |
| — | 3900.00 | — | — | ||
| SUPPLY AND ERECTION OF 25MM SIZE PVC RIGID CONDUIT PIPE OF 2MM THICKNESS AS PER BIS-9537 (LATEST) ALONG WITH ACCESSORIES. | — | — | — | 1,13,100 | |
| — | 118.00 | — | — | ||
| SUPPLY AND ERECTION OF 63A FP RCCB WITH 100/300MA SENSITIVITY | — | — | — | 2,87,448 | |
| — | 300.00 | — | — | ||
| SUPPLY AND ERECTION OF 6 MODULE SIZE SURFACE BOXES | — | — | — | 18,000 | |
| — | 990.00 | — | — | ||
| DESIGN, MANUFACTURE, SUPPLY, ERECTION, TESTING AND COMMISSIONING OF WALL / HANGING /FLOOR MOUNTING TYPE LED ILLUMINATED SIGN/DIRECTION BOARDS IN FULL ELLIPTICAL /HALF ELLIPTICAL/SEMI ELLIPTICAL SHAPE. THE DISPLAY SHEET SHALL BE OF UNBREAKABLE 040 TRANSLUCENT POLY CARBONATE SHEETOF 2 MM THICKNESS.THE TEXT / GRAPHICS MATTER VISIBILITY SHALL NOT BE LESS THAN 160DEG. THE APPROVED COLOUR TEXT AND GRAPHICS SHALL BE PRINTED / ROUTER CUT ON MONOMERIC CALENDERED VINYL OF 70 UM THICKNESS AND SHALL BE FIRMLY PASTED ON DISPLAY SHEETS. THE MOUNTING ARRANGEMENT SHALL BE HANGING, WALL MOUNTING, CEILING MOUNTING, POLE MOUNTING OR FLOOR MOUNTING AND AS PER SITE REQUIREMENT. THE SIGNAGE SHALL HAVE THE INTEGRAL MOUNTING ARRANGEMENTS WITH STURDY STRUCTURAL FRAME AND ACP CLADDING ON THE BACK SIDE OF THE SIGNAGE TO AVOID RUSTING AND ENTRY OF DUST. THE LED BOARD SHALL HAVE UNIFORM ILLUMINATION | — | — | — | 30,88,800 | |
| — | 3.50 | — | — | ||
| SUPPLY AND ERECTION OF FABRICATED SMALL PARTS STEEL (GALAVANISED). | — | — | — | 3,21,982.5 | |
| — | 200.00 | — | — | ||
| SUPPLY & ERECTION OF 20A ONE WAY MODULAR SWITCH | — | — | — | 20,200 | |
| — | 200.00 | — | — | ||
| SUPPLY AND ERECTION OF 6/10A 1-WAY SWITCH | — | — | — | 8,800 | |
| — | 172.00 | — | — | ||
| SUPPLY & ERECTION OF 6/10A MULTI SOCKET FOR CELL PHONE PIN OR 2PIN +3 PIN WITH SAFETY SHUTTER | — | — | — | 17,716 | |
| — | 200.00 | — | — | ||
| SUPPLY & ERECTION OF 6&16/20A TWIN SOCKET HEAVY DUTY SOCKET WITH SAFETY SHUTTER | — | — | — | 35,200 | |
| — | 36.00 | — | — | ||
| SUPPLY, FIXING OF THERMOPLASTIC POLYCARBONATE HALOGEN FREE AND WEATHER PROOF IP66/67 WALL JUNCTION BOX OF SIZE 260X210X116MM FIXED WITH 4NOS OF 16SQ.MM TERMINALS WITH END CLAMPS AND END PLATE, ALONG WITH 6A/10A SP MCB ON A DIN-RAIL, DC CABLE GLANDS SUITABLE FOR 4C16 SQ.MM AL.ARMOURED CABLE 2NOS FOR INCOMING AND OUTGOING (THROUGH AND THROUGH) AND M16 CABLE GLAND SUITABLE FOR 2.5/4SQ.MM SINGLE CORE MULTI STANDARD FRZH CABLE FOR OUTGOING TO LIGHT FIXTURE. WITH TRIANGULAR LOCK & HINGED DOOR OF SIMILAR TO HENSEL MAKE, AND MCB OF ABB/LEGRAND/L&T MAKE INCLUDING ALL OTHER CONNECTED ACCESSORIES ETC. | — | — | — | 2,15,100 | |
| — | 6100.00 | — | — | ||
| EXCAVATION OF CABLE TRENCH IN ALL TYPES OF SOILS FOR LT CABLE AS PER THE DIRECTIONS OF ENGINEER AT SITE MAKING GOOD AFTER LAYING THE CABLE | — | — | — | 7,93,000 | |
| — | 7600.00 | — | — | ||
| EXCAVATION OF CABLE TRENCH INCEMENT CONCRETE BED FLOORING AS PER THE RLY SPECIFICATION NO:C/E/UGC/1/92& DRG NO:SC/A3/STD/1288 ALT-I | — | — | — | 30,78,000 | |
| — | 1700.00 | — | — | ||
| HORIZONTAL DRILLING OF BORES FOR LT CABLES | — | — | — | 21,57,300 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
1_Tender_Booklet_E_M_SC_49_PA_OT_2026_27.pdf Tender Booklet
ATTACHMENT
2_Breakup_Quantities_E_M_SC_49_OT_2026_27.pdf Break up quantities
ATTACHMENT
1_Tender_Booklet_E_M_SC_49_PA_OT_2026_27.pdf
ATTACHMENT
2_Breakup_Quantities_E_M_SC_49_OT_2026_27.pdf
ATTACHMENT
3_GCC_April-2022_withcorrectionslips.pdf
ATTACHMENT
4_Signage_Polycarbonate_Sheet_Specification.pdf
ATTACHMENT
5_Earthing_RDSO_SPEC.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .