Executive Engineer kasumpti Division HPPWD Shimla3
Executive Engineer kasumpti Division HPPWD Shimla3
P/L patch work Maintenance of drain Trimming of grass, whti washing etc in km. 0/00 to 1/200 and Terminal building at kalyani Helipad
2026_PWD_135233_1
SD-I-CTR-Tender-2675-2700 dt 28-04-2026
Open Tender
Civil Works
Percentage
10 days
shimla
As per SBD
12 documents required · 12 mandatory
₹350
₹6,600
12 May 2026
28 Apr 2026
4 May 2026
28 Apr 2026
4 May 2026
28 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | White washing two coats on parapets wall and tree trunks including preparation of surface by cleaning scraping etc. as per technical specification clause 1915 including carriage of materials in all leads and lifts as per the directions of the Engineer-in-Charge. | - | Per Square Meter | 29.4 | - |
| 2 | Mainteance of drain including erosion, reoair, cleaning, reshaping, regarding , deepening of side drain as well as per Technical specification Clause 1907 including carriage of materials in all leads and lifts as per the directions of the Engineer-in-Charge. | - | Per Running Meter | 4.6 | - |
| 3 | Trimming of grass and weeds from the shoulders/ berms and disposing off the same to suitable locations as per technical specifications Clause 1914 including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge. | - | Per Square Meter | 4.08 | - |
| 4 | Finishing wall with weather proof exterior grade emulsion of approved design (Apexultima) or its equarlied on undecorated wall surfaces (One or more coats) to give an even shade and final finish after throughly cleaning the surface to remove all dirt, dust and other foreign matter etc including sand paper smooth including carriage of materials in all leads as per directions of the Engineer-in-Charge. | - | Per Square Meter | 75 | - |
| 5 | Applying Birla white wall care putty over plaster surface after thoroughly brushing the surface free from mortar drops, dust, loose materials and other foreign matters sand papered smooth to give final matter finish to the surface complete including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge. | - | Per Square Metre | 60 | - |
| 6 | Polishing one coats with french polish of required shade on new wood and wood based surfaces to give an even surface including cleaning the surface of all dirt, dust and sand papered smooth and including a coat of wood filler including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge. | - | Per Square Meter | 350 | - |
| 7 | Maintenance of Earthen shoulder(stripping of excess soil) Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor at OMC as per drawings and Technical Specification Clause 1903 including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge. | - | Per Square Metre | 42.29 | - |
| 8 | Repair to pot holes providing tack coat ,road bound including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge. (Labour Rate). | - | Per Square Metre | 110 | - |
| 9 | Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor @ 0.25 to 0.30 kg/Sqm ( zero pointy twenty five to zero point thirty kilogram per square meter) on the prepared granular surface and cleaned with Hydraulic broom as per M.O.R.D 2014 technical specifications clause 503. The rate including octroi, royality, Malkana, toll tax, or other taxes imposed by the Government But Excluding GST, including hauling of materials in all leads and lifts as per entire satisfaction and direction of Engineer-in- Charge.as per direction of Engineer-In-Charge | - | Per Square metre | 40 | - |
| 10 | Steel work welded in built up sections, trusses and framed work including cutting hoisting fixing in position and applying a priming coat of red lead paint including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge. (Labour Rate). | - | Per KilogramMetre | 10 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.05 MB
SBD325443Correct.pdf
Tender Documents • 7.00 MB
BOQ_200289.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .