Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹4.4 Laccepted-finance | accepted-finance |
Tender Value
₹5.3 L
EMD Value
₹13,200
Closing Date
4 Feb 2026, 10:30 pmClosed
Public Works Department
PRAVIN R HULJI
Establishment of 02-day road traffic census centers and collection of necessary information at traffic census centers on 27 state highways under the jurisdiction of Savadatti subdivision of Belgaum district for the year 2025 26
PWD/2025-26/RD/WORK_INDENT28528
PWD/2025-26/RD/WORK_INDENT28528
Open
Roads
Electronic Documents, First(One Cover)
PWD Division Office Belagavi
₹500
₹13,200
25 Jan 2026
25 Jan 2026
3 Feb 2026
GOVERNMENT OF KARNATAKA
PUBLIC WORKS DEPARTMENT
FORM No. I - FIELD DATA SHEET FOR 2025 ROAD TRAFFIC CENSUS
PART A : GENERAL PART B : ROAD DETAILS
1) Name of the Road:_______________________________ 1) Classification of Road : NH/SH/MDR
2) Name of the Section:_____________________________ 2) Length of Road considered (in Kms) From :______________To :_____________
3) Count Post at K.M.: _____________________________ Place (Railway Gate, If any) :__________________ 3) Width of carriage way for the length considered:__________________________
4) Direction of Traffic Up : From _____________________To______________________ 4) Width of formation for the length considered:____________________________
Down : From ___________________ To______________________ 5) Type of surface for the length considered:_______________________________
5) Name of the Traffic Enumerator :____________________ Designation :______________Signature:__________________________ 6) Type of Railway Gate : Un-manned / Manual / Automatic
6) Name of the Division :____________________________ Sub-division :_________________ 7) Weather : Clear / Cloudy / Rainy
8) GPS Coordinates:- Latitude:___________ Longitude:___________
Date Time Intervals Fast Moving Vehicles Slow Moving Vehicles Locomotives (Railways)
Two Wheeler Auto Rickshaw Car/Jeep/ Taxi Commerecial Vehicles Pedal Cycle Cycle Rickshaw Horse Drawn Bullock Cart Passenger Trains Goods Trains No. of Gate Closers
Van / Tempo Mini Bus Buses LCV Goods Vehicles (Trucks) Tractor with Trailer
2 - Axle Rigid ( 6 Tyres) 3 - Axle Rigid ( 10 Tyres) Multi Axle ( more than 10 Tyres) Wooden Wheel Rubber Tyre
NOTE 1. RECORD NUMBER OF VEHICLES IN THE APPROPRIATE COLUMN BY MAKING TALLIES IN THE FORM OF VERTICAL STROKES FOR THE FIRST FOUR VEHICLES AND DRAWING AN OBLIQUE STROKE FOR EVERY FIFTH VEHICLE e.g. IIII
1. Van / Tempo (Col.6) : Passenger vehicle (15 seater and below) and maxi cabs 2. Mini Bus (Col.7) : Passenger vehicle more than 15 seater 3. LCVs (Col.9) : 207 to 607 goods Vehicles 4. 2 - Axle Rigid (Col. 10) : Trucks with 6 Tyres 5. 3 - Axle Rigid (Col. 11) : Trucks with 10 Tyres 6. Multi - Axle (Col. 12) : Trucks with more than 10 Tyres 7. Col.20: If railway gate is closed for any reason one entry should be made.
GOVERNMENT OF KARNATAKA
PUBLIC WORKS DEPARTMENT
DAILY TRAFFIC SUMMARY SHEET OF 2025 ROAD TRAFFIC CENSUS
PART A : GENERAL PART B : ROAD DETAILS
1) Name of the Road:_______________________________ 1) Classification of Road : NH/SH/MDR
2) Name of the Section:_____________________________ 2) Length of Road considered (in Kms) From :______________To :_____________
3) Count Post at K.M.: _____________________________ Place (Railway Gate, If any) :__________________ 3) Width of carriage way for the length considered:__________________________
4) Direction of Traffic Up : From _____________________To______________________ 4) Width of formation for the length considered:____________________________
Down : From ___________________ To______________________ 5) Type of surface for the length considered:_______________________________
5) Name of the Traffic Enumerator :____________________ Designation :______________Signature:__________________________ 6) Type of Railway Gate : Un-manned / Manual / Automatic
6) Name of the Division :____________________________ Sub-division :_________________ 7) Weather : Clear / Cloudy / Rainy
8) GPS Coordinates:- Latitude:___________ Longitude:___________
Time Intervals Fast Moving Vehicles Slow Moving Vehicles Total Vehicles (14 + 19) Locomotives (Railways)
Date Time Two Wheeler Auto Rickshaw Car/Jeep/ Taxi Commerecial Vehicles Total Fast Moving Vehicles (3 to 13) Pedal Cycle Cycle Rickshaw Horse Drawn Bullock Cart Total Slow Moving Vehicles (15 to 18b) Passenger Trains Goods Trains No. of Gate Closers
Van / Tempo Mini Bus Buses LCV Goods Vehicles (Trucks) Tractor with Trailer
2 - Axle Rigid ( 6 Tyres) 3 - Axle Rigid ( 10 Tyres) Multi Axle ( more than 10 Tyres) Wooden Wheel Rubber Tyre
11 AM to 12 Noon
12 Noon to 1 PM
Total for 24 hours
GOVERNMENT OF KARNATAKA
PUBLIC WORKS DEPARTMENT
2025 ROAD TRAFFIC CENSUS SEVEN DAYS TRAFFIC SUMMARY
PART A : GENERAL PART B : ROAD DETAILS
1) Name of the Road:_______________________________ 1) Classification of Road : NH/SH/MDR
2) Name of the Section:_____________________________ 2) Length of Road considered (in Kms) From :______________To :_____________
3) Count Post at K.M.: _____________________________ Place (Railway Gate, If any) :__________________ 3) Width of carriage way for the length considered:__________________________
4) Direction of Traffic Up : From _____________________To______________________ 4) Width of formation for the length considered:____________________________
Down : From ___________________ To______________________ 5) Type of surface for the length considered:_______________________________
5) Name of the Traffic Enumerator :____________________ Designation :______________Signature:__________________________ 6) Type of Railway Gate : Un-manned / Manual / Automatic
6) Name of the Division :____________________________ Sub-division :_________________ 7) Weather : Clear / Cloudy / Rainy
8) GPS Coordinates:- Latitude:___________ Longitude:___________
Time Intervals Fast Moving Vehicles Slow Moving Vehicles Total Vehicles (14 + 19) Passenger Car Unit (PCU) Locomotives (Railways) Train Vehicle Unit (TVU) (14 x 24)
Date Direction of Traffic Two Wheeler Auto Rickshaw Car/Jeep/ Taxi Commerecial Vehicles Total Fast Moving Vehicles (3 to 13) Pedal Cycle Cycle Rickshaw Horse Drawn Bullock Cart Total Slow Moving Vehicles (15 to 18b) Passenger Trains Goods Trains No. of Gate Closers
Van / Tempo Mini Bus Buses LCV Goods Vehicles (Trucks) Tractor with Trailer
2 - Axle Rigid ( 6 Tyres) 3 - Axle Rigid ( 10 Tyres) Multi Axle ( more than 10 Tyres) Wooden Wheel Rubber Tyre
Seven days Total
Average Daily Traffic (ADT)
Passenger Car Unit (PCU)
PCU Equivalency Values (IRC-64) 0.5 0.5
GOVERNMENT OF KARNATAKA
PUBLIC WORKS DEPARTMENT
AVERAGE DAILY TRAFFIC SUMMARY, PCUs, VDF & TVUs
Details Length of the Road Considered (in K.M.) Point at which the Survey was conducted (K.M.) Fast Moving Vehicles Slow Moving Vehicles Total Vehicles (17 + 22) Passenger Car Unit (PCU) Total Commerecial Vehicles (9 to 16) Vehicle Damage Factor (VDF) Locomotives (Railways) Train Vehicle Unit (TVU) (17 x 29)
Two Wheeler Auto Rickshaw Car/Jeep/ Taxi Commerecial Vehicles Total Fast Moving Vehicles (6 to 16) Pedal Cycle Cycle Rickshaw Horse Drawn Bullock Cart Total Slow Moving Vehicles (18 to 21b) Passenger Trains Goods Trains No. of Gate Closers
From To Total Van / Tempo Mini Bus Buses LCV Goods Vehicles (Trucks) Tractor with Trailer
2 - Axle Rigid ( 6 Tyres) 3 - Axle Rigid ( 10 Tyres) Multi Axle ( more than 10 Tyres) Wooden Wheel Rubber Tyre
Name of the Road
Traffic Summary
Name of the Road
Traffic Summary
Name of the Road
Traffic Summary
Name of the Road
Traffic Summary
Name of the Road
Traffic Summary
Name of the Road
Traffic Summary
Name of the Road
Traffic Summary
Name of the Road
Traffic Summary
Name of the Road
Traffic Summary
Name of the Road
Traffic Summary
Name of the Road
Traffic Summary
Name of the Road
Traffic Summary
Name of the Road
Traffic Summary
GOVT. OF KARNATAKA
Public Works Department
OFFICE OF THE EXECUTIVE ENGINEER PUBLIC WORKS DEPARTMENT, BELAGAVI DIVISION, BELAGAVI
ಕೆಲಸದ ಹೆಸರು :- 2025-26 ನೇ ಸಾಲಿನ ಬೆಳಗಾವಿ ಜಿಲ್ಲೆಯ ಸವದತ್ತಿ ಉಪ ವಿಭಾಗದ ವ್ಯಾಪ್ತಿಯ ರಾಜ್ಯ ಹೆದ್ದಾರಿ ರಸ್ತೆಗಳ 27 ಸಂಚಾರ ಗಣತಿ ಕೇಂದ್ರ ಸ್ಥಾಪಿಸುವುದು ಹಾಗೂ ಅಗತ್ಯ ಮಾಹಿತಿ ಸಂಗ್ರಹಿಸುವುದು.
ESTIMATED COST : 8.42 Lakhs.
OFFICE OF THE ASSISTANT EXECUTIVE ENGINEER PUBLIC WORKS DEPARTMENT SUB DIVISION SAUNDATTI
ವಿಭಾಗ : ಲೋಕೋಪಯೋಗಿ ಇಲಾಖೆ ವಿಭಾಗ, ಬೆಳಗಾವಿ.
ಉಪ ವಿಭಾಗ : ಲೋಕೋಪಯೋಗಿ ಇಲಾಖೆ ಉಪ-ವಿಭಾಗ, ಬೆಳಗಾವಿ
ಅನುದಾನ ಶೀರ್ಷಿಕೆ : 2025-26 ನೇ ಸಾಲಿನ 3054-03-337-0-05-200 ರಾಜ್ಯ ಹೆದ್ದಾರಿಗಳ ನಿರ್ವಹಣೆ
ಮುಖ್ಯ ನಿಧಿ (ಪ್ರಧಾನ ಶೀರ್ಷಿಕೆ) :
ಸಣ್ಣ ನಿಧಿ (ಉಪ ಶೀರ್ಷಿಕೆ) :
ಸೇವಾ ಶೀರ್ಷಿಕೆ :
ಇಲಾಖೆ ಶೀರ್ಷಿಕೆ :
ಕೆಲಸದ ಹೆಸರು : 2025-26 ನೇ ಸಾಲಿನ ಬೆಳಗಾವಿ ಜಿಲ್ಲೆಯ ಸವದತ್ತಿ ಉವ ವಿಭಾಗದ ವ್ಯಾಪ್ತಿಯ ರಾಜ್ಯ ಹೆದ್ದಾರಿ ರಸ್ತೆಗಳ 27 ಸಂಚಾರ ಗಣತಿ ಕೇಂದ್ರ ಸ್ಥಾಪಿಸುವುದು ಹಾಗೂ ಅಗತ್ಯ ಮಾಹಿತಿ ಸಂಗ್ರಹಿಸುವುದು.
ಅಂದಾಜು ಮೊತ್ತ : ರೂ. 8.42 ಲಕ್ಷ
ಆಡಳಿತಾತ್ಮಕ ಮಂಜೂರಾತಿ ಸಂಖ್ಯೆ : ಸAಖ್ಯೆ: ದಿನಾಂಕ :
ತಾಂತ್ರಿಕ ಮಂಜೂರಾತಿ ಸಂಖ್ಯೆ : ಸAಖ್ಯೆ : ದಿನಾಂಕ :
ಅಂದಾಜು ಪತ್ರಿಕೆ ತಯಾರಿಸಿದವರು : ಶ್ರೀ. ಫಕೀರಗೌಡ ಪಾಟೀಲ ಸ.ಇಂ
ಶ್ರೀ. ಅಕ್ಷಯಕುಮಾರ ಮೂಗಿ ಸ.ಇಂ
ಶ್ರೀ. ವಿನಾಯಕ ಗೊಂದಿ ಕಿ.ಇಂ
ಶ್ರೀ. ಪ್ರವೀಣ ಪಾಟೀಲ ಕಿ.ಇಂ
ಅAದಾಜು ಪತ್ರಿಕ ಪರಿಶೀಲಿಸದವರು : ಶ್ರೀ. ವಿಜಯ ಸಂಗಪ್ಪಗೋಳ ಸ.ಕಾ.ನಿ.ಇಂ
ಸನ್ 2025-26 ನೇ ಸಾಲಿನ ಬೆಳಗಾವಿ ಜಿಲ್ಲೆಯ ಸವದತ್ತಿ ಉಪವಿಭಾಗದ ವ್ಯಾಪ್ತಿಯ ಸವದತ್ತಿ ತಾಲೂಕಿನ ಜಿಲ್ಲಾ ಮುಖ್ಯ ರಸ್ತೆಗಳ ಮೇಲೆ ಸಂಚಾರ ಗಣತಿ ಸಮೀಕ್ಷೆ ದಿನಾಂಕ: ಮುಂಜಾನೆ 6.00 ಗಂಟೆ ರಿಂದ ಮುಂಜಾನೆ 6.00 ಗಂಟೆ ವರೆಗೆ ಸತತವಾಗಿ ನಡೆಸುವ ಎರಡು ದಿನಗಳ ರಸ್ತೆ ಸಂಚಾರ ಗಣತಿಯನ್ನು ಕೈಗೊಳ್ಳಲು ತೀರ್ಮಾನಿಸಲಾಗಿದೆ. ಸದರಿ ಗಣತಿ ಕೇಂದ್ರಗಳನ್ನು ಸವದತ್ತಿ ಉಪವಿಭಾಗದ ವ್ಯಾಪ್ತಿಯ ಸವದತ್ತಿ ಹಾಗೂ ಯರಗಟ್ಟಿ ತಾಲೂಕಿನ ಈ ಕೆಳಗಿನ ರಾಜ್ಯ ಹೆದ್ದಾರಿಗಳ ಮೇಲೆ ಕ್ಯಾಮೆರಾಗಳನ್ನು ಅಳವಡಿಸಿ 24 ಗಂಟೆ ಸತತವಾಗಿ ಎರಡು ದಿನಗಳ ರಸ್ತೆ ಸಂಚಾರ ಗಣತಿಯಲ್ಲಿ ಕೈಗೊಳ್ಳುವ ಸಲುವಾಗಿ ಅವಶ್ಯವಿರುವ ಕ್ಯಾಮೆರಾ, ಡಾಟಾ ಬ್ಯಾಕಪ ಹಾಗೂ ಗಣತಿಯ ಡಾಟಾಗಳನ್ನು ಸಾಫ್ಟ್ ಕಾಪಿ ತಯಾರಿಸುವುದು ಇವುಗಳನ್ನು ಅಳವಡಿಸಿ ಅಂದಾಜು ಪತ್ರಿಕೆಯನ್ನು ತಯಾರಿಸಲಾಗಿದೆ.
ಕ್ರ.ಸಂ ರಸ್ತೆಯ ಹೆಸರು ಗಣತಿ ಕೇಂದ್ರದ ಕಿ.ಮೀ
1 ರಾಯಚೂರು-ಬಾಚಿ (ಎಸ್.ಎಚ್-20) 303.90 Raichur-Bachi (SH-20)
2 ಸಿಂದನೂರು ಹೆಮ್ಮಡಗಾ (ರಾ.ಹೆ.30) 188.03 Sindanur Hemmadaga (SH.30)
3 ಸಿಂದನೂರು ಹೆಮ್ಮಡಗಾ (ರಾ.ಹೆ.30) 206.65 Sindanur Hemmadaga (SH.30)
4 ಅವರಾದ-ಸದಾಶಿವಗಡ (ರಾ.ಹೆ.34) 484.04 Avarada-Sadasivagad (SH.34)
5 ಅವರಾದ-ಸದಾಶಿವಗಡ (ರಾ.ಹೆ.34) 497.06 Avarada-Sadasivagad (SH.34)
6 ಅವರಾದ-ಸದಾಶಿವಗಡ (ರಾ.ಹೆ.34) 516.61 Avarada-Sadasivagad (SH.34)
7 ಅರಭಾವಿ-ಚಳ್ಳಿಕೇರಿ (ರಾ.ಹೆ.45) 60.27 Arabhavi-Challikeri (SH.45)
8 ಅರಭಾವಿ-ಚಳ್ಳಿಕೇರಿ (ರಾ.ಹೆ.45) 75.10 Arabhavi-Challikeri (SH.45)
9 ಯರಗಟ್ಟಿ-ಬಬಲೇಶ್ವರ (ರಾ.ಹೆ-55) 26.34 (5.00) Yaragatti-Babaleshwar (SH-55)
10 ಸವದತ್ತಿ ತಾಲೂಕಿನ ರಾ.ಹೆ-83 (ಮುನವಳ್ಳಿ) ರಿಂದ ರಾ.ಹೆ.-134 ರ ವರೆಗೆ ವ್ಹಾಯಾ ಸೊಪ್ಪಡ್ಲ-ಸತ್ತಿಗೇರಿ-ಮುಗಳಿಹಾಳ-ಮೆಳ್ಳಿಕೆರೆ ಕೂಡುವ ರಸ್ತೆ. ರಾಹೆ-73 4.79 Savadatti Taluk Road from SH-83 (Munavalli) to SH-134 Via Soppadla-Sattigeri-Mugalihala-Mellikere SH-73 connecting
11 ಗೋಕಾಕ - ಸವದತ್ತಿ ರಸ್ತೆ (ರಾ.ಹೆ.-103) 60.75 Gokaka - Savadatti Road (SH.-103)
12 ನಾಗರಗಾಳಿ-ಕಟಕೋಳ ರಸ್ತೆ (ರಾ.ಹೆ.-138) 85.74 Nagaragali-Katakola Road (SH.-138)
13 ಅಳ್ನಾವರ-ಬೆಟಗೇರಿ ರಸ್ತೆ ರಾ.ಹೆ.-142 67.06 Alnavara-Bettageri Road SH.-142
14 ಎನ್.ಎಚ್-4ಎ (ಕಮತಗಾ) ದಿಂದ ರಾಹೆ-56 (ಅಳಗವಾಡಿ) ಕೂಡು ರಸ್ತೆ ರಾಹೆ-ಎನ್21 100.46 From NH-4A (Kamataga) to Route-56 (Alagavadi) Connecting Road SH-N21
15 ಎನ್.ಎಚ್-4ಎ (ಕಮತಗಾ) ದಿಂದ ರಾಹೆ-56 (ಅಳಗವಾಡಿ) ಕೂಡು ರಸ್ತೆ ರಾಹೆ-ಎನ್21 111.86 From NH-4A (Kamataga) to Route-56 (Alagavadi) Connecting Road SH-N21
16 ಎನ್.ಎಚ್-4ಎ (ಕಮತಗಾ) ದಿಂದ ರಾಹೆ-56 (ಅಳಗವಾಡಿ) ಕೂಡು ರಸ್ತೆ ರಾಹೆ-ಎನ್21 126.56 From NH-4A (Kamataga) to Route-56 (Alagavadi) Connecting Road SH-N21
17 ಎನ್.ಎಚ್-4ಎ (ಕಮತಗಾ) ದಿಂದ ರಾಹೆ-56 (ಅಳಗವಾಡಿ) ಕೂಡು ರಸ್ತೆ ರಾಹೆ-ಎನ್21 140.00 From NH-4A (Kamataga) to Route-56 (Alagavadi) Connecting Road SH-N21
21 ಯರಗಟ್ಟಿ-ಬಬಲೇಶ್ವರ (ರಾ.ಹೆ-55) 10.14
22 ನಾಗರಗಾಳಿ-ಕಟಕೋಳ ರಸ್ತೆ (ರಾ.ಹೆ.-138) 110.28
23 ಅಳ್ನಾವರ-ಬೆಟಗೇರಿ ರಸ್ತೆ ರಾ.ಹೆ.-140 91.45
24 ರಸ್ತೆ ಎಸ್ಎಚ್-83 (ಮುನವಳ್ಳಿ)ಯಿಂದ ಸೊಪ್ಪಡ್ಲ-ಸತ್ತಿಗೇರಿ-ಮುಗಳಿಹಾಳ-ಮೆಳ್ಳಿಕೇರಿ-ಕೌಜಲಗಿ-ಕಳ್ಳಿಗುದ್ದಿ-ಹುಲಕುಂದ-ಸಾಲಹಳ್ಳಿ-ಬನ್ನೂರು ತಾಂಡಾ-ದಾಡಿಬಾವಿ ತಾಂಡಾ-ಬಟಕುರ್ಕಿ-ನಂದಿಹಾಳ್ ಮೂಲಕ ಎಸ್ಎಚ್-134. ವರೆಗೆ 9.48
25 ರಸ್ತೆ ಎಸ್ಎಚ್-83 (ಮುನವಳ್ಳಿ)ಯಿಂದ ಸೊಪ್ಪಡ್ಲ-ಸತ್ತಿಗೇರಿ-ಮುಗಳಿಹಾಳ-ಮೆಳ್ಳಿಕೇರಿ-ಕೌಜಲಗಿ-ಕಳ್ಳಿಗುದ್ದಿ-ಹುಲಕುಂದ-ಸಾಲಹಳ್ಳಿ-ಬನ್ನೂರು ತಾಂಡಾ-ದಾಡಿಬಾವಿ ತಾಂಡಾ-ಬಟಕುರ್ಕಿ-ನಂದಿಹಾಳ್ ಮೂಲಕ ಎಸ್ಎಚ್-134. ವರೆಗೆ 15.01
26 ರಸ್ತೆ ಎಸ್ಎಚ್-83 (ಮುನವಳ್ಳಿ)ಯಿಂದ ಸೊಪ್ಪಡ್ಲ-ಸತ್ತಿಗೇರಿ-ಮುಗಳಿಹಾಳ-ಮೆಳ್ಳಿಕೇರಿ-ಕೌಜಲಗಿ-ಕಳ್ಳಿಗುದ್ದಿ-ಹುಲಕುಂದ-ಸಾಲಹಳ್ಳಿ-ಬನ್ನೂರು ತಾಂಡಾ-ದಾಡಿಬಾವಿ ತಾಂಡಾ-ಬಟಕುರ್ಕಿ-ನಂದಿಹಾಳ್ ಮೂಲಕ ಎಸ್ಎಚ್-134. ವರೆಗೆ 33.47
27 ರಸ್ತೆ ಎಸ್ಎಚ್-83 (ಮುನವಳ್ಳಿ)ಯಿಂದ ಸೊಪ್ಪಡ್ಲ-ಸತ್ತಿಗೇರಿ-ಮುಗಳಿಹಾಳ-ಮೆಳ್ಳಿಕೇರಿ-ಕೌಜಲಗಿ-ಕಳ್ಳಿಗುದ್ದಿ-ಹುಲಕುಂದ-ಸಾಲಹಳ್ಳಿ-ಬನ್ನೂರು ತಾಂಡಾ-ದಾಡಿಬಾವಿ ತಾಂಡಾ-ಬಟಕುರ್ಕಿ-ನಂದಿಹಾಳ್ ಮೂಲಕ ಎಸ್ಎಚ್-134. ವರೆಗೆ 24.65
ಸಹಾಯಕ ಕಾರ್ಯನಿರ್ವಾಹಕ ಅಭಿಯಂತರರು
ಲೋಕೋಪಯೋಗಿ ಇಲಾಖೆ
ಉಪವಿಭಾಗ ಸವದತ್ತಿ
ಕೆಲಸದ ಹೆಸರು :- 2025-26 ನೇ ಸಾಲಿನ ಬೆಳಗಾವಿ ಜಿಲ್ಲೆಯ ಸವದತ್ತಿ ಉಪ ವಿಭಾಗದ ವ್ಯಾಪ್ತಿಯ ರಾಜ್ಯ ಹೆದ್ದಾರಿ ರಸ್ತೆಗಳ 27 ಸಂಚಾರ ಗಣತಿ ಕೇಂದ್ರ ಸ್ಥಾಪಿಸುವುದು ಹಾಗೂ ಅಗತ್ಯ ಮಾಹಿತಿ ಸಂಗ್ರಹಿಸುವುದು.
¸ÁªÀiÁ£Àå «ªÀgÀuÉ
¨É¼ÀUÁ« vÁ®ÆQ£À ¹AzsÀ£ÀÆgÀ ºÉªÀÄäqÀUÁ gÀ¸ÉÛAiÀÄÄ gÁdå ºÉzÁÝjAiÀiÁVzÉ (gÁ.ºÉ-30). F gÀ¸ÉÛAiÀİè 01 eÁUÀzÀ°è ¨ÁèPï ¸Áàmï ¸ÀܼÀUÀ¼À£ÀÄß UÀÄgÀÄw¸À¯ÁVzÉ. ZÉÊ£ÉÃd 285.20 gÀ°è gÀ¸ÉÛ wgÀĪÀÅ EgÀĪÀ PÁgÀt gÀ¸ÉÛAiÀÄ CUÀ® 3.75 «ÄÃ. EgÀÄvÀÛzÉ. DzÀÝjAzÀ C¥ÀWÁvÀ ¸ÀܼÀªÁV ¥Àjt«Ä¹zÉ. ¸ÀzÀjà jÃZÀ£À°è gÀ¸ÉÛAiÀÄ£ÀÄß CUÀ® ºÁUÀÆ ¸ÉÊqï ¥ÉÆæÃmÉPÀë£ï ªÀPÀð ªÀiÁqÀĪÀzÀjAzÀ C¥WÁvÀUÀ¼À£ÀÄß vÀqÉAiÀħºÀÄzÁVzÉ. F gÀ¸ÉÛAiÀÄ ZÉÊeÉÃeï FUÁUÀ¯Éà J¸ï.JZï.r.¦. ¥sÉøï-2 gÀrAiÀİè PÉ®¸À PÉÊUÉÆ¼Àî¯ÁVzÉ. ¸ÀzÀj gÀ¸ÉÛAiÀÄÄ ¤ªÀðºÀuÉAiÀÄ CªÀ¢üAiÀİèzÉ. DzÀgÉ ¨ÁèPï ¸Áàmï EgÀĪÀ PÁgÀt J¸ï.r.©.¹ 25 «ÄÃ.«ÄÃ. zÀ¥ÀàzÀ gÀ¸ÉÛAiÀÄ 5.50 «Äà CUÀ®PÉÌ PÉÊUÉÆ¼Àî®Ä ¥Àæ¸ÁÛ¦¸À¯ÁVzÉ.
§ºÀ¼À ¢£ÀUÀ½AzÀ ¸ÀܽÃAiÀÄ £ÁÀUÀjPÀgÀÄÀ, ºÁUÀÆ d£À¥Àæw¤¢üUÀ¼ÀÄ ¸ÀzÀj gÀ¸ÉÛAiÀÄ£ÀÄß CUÀ°ÃPÀgÀt ªÀiÁqÀ®Ä MvÁ۬ĸÀÄwÛzÁÝgÉ. C®èzÉà F C¥ÀWÁvÀ ¸ÀܼÀªÀ£ÀÄß ¥ÉÆÃ°Ã¸À E¯ÁSÉAiÀĪÀgÀÄ PÀ¥ÀÄà UÀÄgÀÄw£À ¸ÀܼÀ ( ¨ÁèPï ¸Áàmï) JAzÀÄ WÉÆÃ¹¶zÁÝgÉ. DzÀÝjAzÀ gÀ¸ÉÛAiÀÄ F ¨sÁUÀªÀ£ÀÄß CUÀ°ÃPÀgÀt ªÀiÁqÀ®Ä CAzÁdÄ ¥ÀwæPÉ vÀAiÀiÁj¸À¯ÁVzÉ. CAzÁdÄ ¥ÀwæPÉAiÀİè F PɼÀV£À CA±ÀUÀ¼À£ÀÄß ¥ÀjUÀt¸À¯ÁVzÉ.
1) gÀ¸ÉÛAiÀÄ JgÀqÀÄ §¢UÉ CUÀ°ÃPÀgÀtPÁÌV gÀ¸ÉÛAiÀÄ vÀ¼À¢AzÀ CUÉvÀ ªÀiÁqÀĪÀzÀÄ.
2) gÀ¸ÉÛAiÀÄ CqÀØ bÉÃzÀ ºÁUÀÆ GzÀÝ bÉÃzÀUÀ¼À C£ÀÄUÀÄtªÁV CUÀ°ÃPÀgÀtPÁÌV JqÀ ºÁUÀÆ §® ¨sÁUÀPÉÌ JA¨ÁåAPÀªÉÄAmï, ªÀiÁqÀĪÀzÀÄ.
3) ºÁ° gÀ¸ÉÛAiÀÄ CUÀ®ªÀÅ 3.75 «ÄÃ. CUÀ®«zÉ. CzÀ£ÀÄß 5.50 «ÄÃ. UÀ¼ÀµÀÄÖ CUÀ® ªÀiÁqÀĪÀzÀ£ÀÄß ¥ÀjUÀt¹, CzÀgÀ ªÉÄÃ¯É 0.45 «ÄÃ. CUÀ®PÉÌ 150 «Ä.«Ä. zÀ¥ÀàzÀ f.J¸ï.©. ºÁPÀĪÀzÀÄ.
4) CªÀ±ÀåPÀvÉUÀtÄUÀÄtªÁV 200 «Ä.«Ä. zÀ¥ÀàzÀ qÀ.§Äè.JA.JA. ºÁPÀĪÀzÀÄ.
5) CUÀ°ÃPÀgÀt ªÀiÁrzÀ ¨sÁUÀzÀ ªÉÄÃ¯É 50 «Ä.«Ä. zÀ¥ÀàzÀ ©.JA. ºÁPÀĪÀzÀÄ.
6) CzÀgÀ ªÉÄÃ¯É 25 «Ä.«Ä. zÀ¥ÀàzÀ J¸ï.r.©.¹. ºÁPÀĪÀzÀÄ.
7) gÀ¸ÉÛUÉ CªÀ±Àå«gÀĪÀ gÉÆÃqÀ ¥sÀ¤ðZÀgÀUÀ¼À£ÀÄß C¼ÀªÀr¸ÀĪÀzÀÄ.
¸ÀzÀgÀ gÀ¸ÉÛAiÀÄÄ SÁ£Á¥ÀÆgÀ vÁ®ÆQ£À CgÀtå ¥ÀæzÉñÀzÀ ªÁå¦ÛAiÀÄ°è §gÀĪÀÅzÀjAzÀ ±ÉÃPÀqÁ 10gÀ ºÉZÀÄѪÀjAiÀÄ£ÀÄß ªÀiÁvÀæ ªÀÄÆ® zÀgÀzÀ°è »r¢zÀÄÝ, zÀgÀUÀ¼À£ÀÄß 2014-15 £Éà ¸Á°£À ¨É¼ÀUÁ« ªÀÈvÀÛ PÀZÉÃjAiÀÄ zÀgÀ¥ÀnÖAiÀÄ ¥ÀæPÁgÀ ªÀÄvÀÄÛ EwÛÃaUÉ ¥ÀæPÀn¹zÀ zÀgÀªÀåvÁå¸ÀªÀ£ÀÄß PÀÆqÁ C¼ÀªÀr¹ zÀgÀUÀ¼À£ÀÄß »rAiÀįÁVzÉ. CAzÁdÄ ¥ÀwæPÉAiÀÄ£ÀÄß ªÀÄAdÆgÁwUÁV ¸À°è¸À¯ÁVzÉ. E.Dgï.¹ ¸À¨sÉAiÀÄ°è ¸ÀÆa¹zÀAvÉ CAzÁdÄ ¥ÀwæPÉAiÀÄ£ÀÄß wzÀÄÝ¥Àr ªÀiÁr
¸ÀºÁAiÀÄPÀ PÁAiÀÄðPÁj C©üAiÀÄAvÀgÀgÀÄ, PÁAiÀÄðPÁj C©üAiÀÄAvÀgÀgÀÄ,
¯ÉÆÃ. §A. ªÀÄvÀÄÛ M.d.¸Á.E¯ÁSÉ ¯ÉÆÃ. §A. ªÀÄvÀÄÛ M.d.¸Á.E¯ÁSÉ
G¥À-«¨sÁUÀ, SÁ£Á¥ÀÆgÀ ¨É¼ÀUÁ« «¨sÁUÀ, ¨É¼ÀUÁ«.
ಕೆಲಸದ ಹೆಸರು :- 2025-26 ನೇ ಸಾಲಿನ ಬೆಳಗಾವಿ ಜಿಲ್ಲೆಯ ಸವದತ್ತಿ ಉಪ ವಿಭಾಗದ ವ್ಯಾಪ್ತಿಯ ರಾಜ್ಯ ಹೆದ್ದಾರಿ ರಸ್ತೆಗಳ 27 ಸಂಚಾರ ಗಣತಿ ಕೇಂದ್ರ ಸ್ಥಾಪಿಸುವುದು ಹಾಗೂ ಅಗತ್ಯ ಮಾಹಿತಿ ಸಂಗ್ರಹಿಸುವುದು.
P.W.D.CODE PARA - 133
This is to certify that, Shri. Vijay Sangappagol Assistant Executive Engineer,have personally visited spot and prepared the estimate using sanctioned scheduled of rates provided for the most economical and safe way of executing work.
(As required vide G.O.No.PWD SL.CMS.96 Dtd:27/6/1991)
Certified that, sufficient case has been taken while preparaing the estimate in respect of the above mentioned work to see that all necessary items which are technically required for the work in sufficient quantity are included while preparing the estimate,and specification of items included are completed and correct.
Certified that, the work proposed in this estimate has not been taken up under any other head/programme by any agency. The said work has not been included / proposed / over lapped in any other proposed or approved programme.
Assistant Executive Engineer PWD Sub Division Saundatti
ಕೆಲಸದ ಹೆಸರು :- 2025-26 ನೇ ಸಾಲಿನ ಬೆಳಗಾವಿ ಜಿಲ್ಲೆಯ ಸವದತ್ತಿ ಉಪ ವಿಭಾಗದ ವ್ಯಾಪ್ತಿಯ ರಾಜ್ಯ ಹೆದ್ದಾರಿ ರಸ್ತೆಗಳ 27 ಸಂಚಾರ ಗಣತಿ ಕೇಂದ್ರ ಸ್ಥಾಪಿಸುವುದು ಹಾಗೂ ಅಗತ್ಯ ಮಾಹಿತಿ ಸಂಗ್ರಹಿಸುವುದು.
GENERAL DESCRIPTION
The work of Conducting Traffic Survey on State Highways and MDR's in Khanapur is approved by the Superintending Engineer, PWP & IWTD, Belagavi Circle vide letter No. 2388 dtd: 18-09-2017. Sl. No.23 under 3054 (SH) maintenance for the year 2017-18 This estimate comprises the following items of works;
1) Engaging Traffic Enumerators (Literate Assistant (SSLC passed)) for Road Traffic Survey
2) Engaging Unskilled Heavy Mazdoor for Controlling traffic for both up and Down Road Traffic Survey
3) Erecting Pendal / Shed of Size 15’X15’ and ht 10’0” for 2 days
The estimate for the work is prepared based on above provisions and adopting rates as per Schedule of Rates of PWP & IWTD North Zone Dharwad for the year 2016-17 (Continued to 2017-18) with area weightage of 10% is considered. Therefore it is kindly requested to accord the Technical sanction for the same. E.Dgï.¹ ¸À¨sÉAiÀÄ°è ¸ÀÆa¹zÀAvÉ CAzÁdÄ ¥ÀwæPÉAiÀÄ£ÀÄß wzÀÄÝ¥Àr ªÀiÁr
Assistant Executive Engineer, PW P & IWTrspn.,Dept.Sub-Dn.,Khanapur Executive Engineer, PW P & IWTrspn.,Dept.Belagavi dn Belagavi
ಕೆಲಸದ ಹೆಸರು :- 2025-26 ನೇ ಸಾಲಿನ ಬೆಳಗಾವಿ ಜಿಲ್ಲೆಯ ಸವದತ್ತಿ ಉಪ ವಿಭಾಗದ ವ್ಯಾಪ್ತಿಯ ರಾಜ್ಯ ಹೆದ್ದಾರಿ ರಸ್ತೆಗಳ 27 ಸಂಚಾರ ಗಣತಿ ಕೇಂದ್ರ ಸ್ಥಾಪಿಸುವುದು ಹಾಗೂ ಅಗತ್ಯ ಮಾಹಿತಿ ಸಂಗ್ರಹಿಸುವುದು.
-: ¸ÁªÀiÁ£Àå «ªÀgÀuÉ :-
2017-18 £Éà ¸Á°£À ¯ÉPÀÌ ²Ã¶ðPÉ. 3054 (AiÉÆÃd£ÉÃvÀgÀ) f¯Áè ªÀÄÄRå gÀ¸ÉÛUÀ¼À ¤ªÀðºÀuÁ PÁªÀÄUÁjUÀ¼À CrAiÀÄ°è ªÀÈvÀÛ PÀbÉÃjAiÀÄ DzÉñÀ ¸ÀA: 2388 ¢: 18-09-2017 gÀ°è ¸ÀÆa¹zÀAvÉ F CAzÁdÄ ¥ÀvÀæPÉAiÀÄ£ÀÄß vÀAiÀiÁj¸À¯ÁVzÉ.
SÁ£Á¥ÀÆgÀ vÁ®ÆQ£À SÁ£Á¥ÀÆgÀ ¨ÁPÀ£ÀÆgÀ-UÉÆÃ¯Áå½ gÀ¸ÉÛ Q.«ÄÃ. 1.00 jAzÀ 7.05 gÀ ªÀgÉUÉ gÀ¸ÉÛAiÀÄÄ MlÄÖ 6.05 Q.«Ä.UÀ¼ÀµÀÄÖ GzÀÝ«zÀÄÝ, F CAzÁdÄ ¥ÀwæPÉAiÀÄ£ÀÄß ¸ÀzÀjà gÀ¸ÉÛAiÀÄ£ÀÄß ¸ÀƹÜwAiÀİèqÀĪÀ zÀȶ֬ÄAzÀ F CAzÁdÄ ¥ÀwæPÉ vÀAiÀiÁj¹ ªÀÄAdÆgÁwUÁV ¸À°è¸À¯ÁVzÉ. F CAzÁf£À°è ¥Àæ¸ÁÛ¦vÀ MlÄÖ 2.64 Q.«Ä.UÀ¼À Eligible length. ºÁUÀÆ ¸ÀzÀj CAzÁdÄ ¥ÀwæPÉAiÀİè F PɼÀV£À CA±ÀUÀ¼À£ÀÄß ¥ÀjUÀt¸À¯ÁVzÉ.
1) ¤ªÀðºÀuÉAiÀİè dAUÀ¯ï, ZÀgÀAr ¤ªÀðªÀºÀuÉ ªÀiÁqÀĪÀzÀÄ ºÁUÀÆ qÀ.§Æ.è©.JªÀiï ¤AzÀ UÀÄAr vÀÄA§ÄªÀÅzÀÄ.
2) vÀUÀÄÎ UÀÄArUÀ¼À£ÀÄß qÁA§j¤AzÀ vÀÄA§ÄªÀzÀÄ.
C£ÀÄzÁ£ÀzÀ PÉÆgÀvɬÄAzÀ Q.«Ä. PÀ®ÄèUÀ½U,É ºÉPÉÆÖëÄÃlgï PÀ®ÄèUÀ¼ÀÄ, £ÁªÀÄ¥sÀ®PÀUÀ¼À£ÀÄß C¼ÀªÀr¸ÀĪÀÅzÀÄ, ¹.r ºÁUÀÆ VqÀUÀ½UÉ ¸ÀÄtÚ §tÚ ºÀZÀÄѪÀzÀÄ ºÁUÀÆ EvÀgÉà CA±ÀUÀ¼À£ÀÄß F CAzÁdÄ ¥ÀwæPÉAiÀÄ°è ¥ÀjUÀt¹gÀĪÀÅ¢®è. ¸ÀzÀj PÉ®¸ÀªÀÅ gÀ¸ÉÛAiÀÄ »vÀzÀȶ֬ÄAzÀ CªÀ±ÀåPÀ«gÀĪÀzÀjAzÀ F PÉ®¸ÀUÀªÀ£ÀÄß (gÉÆÃqï ¥sÀ¤ðZÀgïì EvÁå¢) ªÀÄÄA¢£À C£ÀÄzÁ£ÀzÀ°è PÉÊPÉÆÃ¼Àî¯ÁUÀĪÀÅzÀÄ. F CAzÁdÄ ¥ÀwæPÉAiÀÄ£ÀÄß 2016-17 £Éà ¸Á°£À ¯ÉÆÃ.§A.ªÀÄvÀÄÛ M.d.¸Á.E¯ÁSÉ, ¨É¼ÀUÁ« ªÀÈvÀÛ, ¨É¼ÀUÁ« EªÀgÀ zÀgÀ¥ÀnÖAiÀÄAvÉ ºÁUÀÆ SÁ£Á¥ÀÆgÀ vÁ®ÆQUÉ ±ÉÃ.10% ºÉZÀÄѪÀjAiÀiÁV vÀAiÀiÁj¹zÀÄÝ, F CAzÁdÄ ¥ÀwæPÉUÉ ªÀÄAdÆgÁw ¤ÃqÀ®Ä «£ÀAw¸À¯ÁVzÉ.
¸ÀºÁAiÀÄPÀ PÁAiÀÄð¤ªÁðºÀPÀ C©üAiÀÄAvÀgÀgÀÄ, PÁAiÀÄð¤ªÁðºÀPÀ C©üAiÀÄAvÀgÀgÀÄ,
¯ÉÆÃ.§A. ªÀÄvÀÄÛ M.d.¸Á.E¯ÁSÉ ¯ÉÆÃ.§A. ªÀÄvÀÄÛ M.d.¸Á.E¯ÁSÉ
G¥À-«¨sÁUÀ, SÁ£Á¥ÀÆgÀ ¨É¼ÀUÁ«-«¨sÁUÀ, ¨É¼ÀUÁ«
ಕೆಲಸದ ಹೆಸರು :- 2025-26 ನೇ ಸಾಲಿನ ಬೆಳಗಾವಿ ಜಿಲ್ಲೆಯ ಸವದತ್ತಿ ಉಪ ವಿಭಾಗದ ವ್ಯಾಪ್ತಿಯ ರಾಜ್ಯ ಹೆದ್ದಾರಿ ರಸ್ತೆಗಳ 27 ಸಂಚಾರ ಗಣತಿ ಕೇಂದ್ರ ಸ್ಥಾಪಿಸುವುದು ಹಾಗೂ ಅಗತ್ಯ ಮಾಹಿತಿ ಸಂಗ್ರಹಿಸುವುದು.
RECAPITULATION SHEET
Sl. No Description Amount in Rs.
1 Traffic Census on SH Roads (SDT & YGT TQ) 526,700.00
3 Lumpsum Provision & Miscelleneous 220,494.00
GRAND TOTAL 842,000.00
GRAND TOTAL IN LAKHS 8.42
Assistant Executive Engineer
PWD Sub Division Saundatti
ಕೆಲಸದ ಹೆಸರು :- 2025-26 ನೇ ಸಾಲಿನ ಬೆಳಗಾವಿ ಜಿಲ್ಲೆಯ ಸವದತ್ತಿ ಉಪ ವಿಭಾಗದ ವ್ಯಾಪ್ತಿಯ ರಾಜ್ಯ ಹೆದ್ದಾರಿ ರಸ್ತೆಗಳ 27 ಸಂಚಾರ ಗಣತಿ ಕೇಂದ್ರ ಸ್ಥಾಪಿಸುವುದು ಹಾಗೂ ಅಗತ್ಯ ಮಾಹಿತಿ ಸಂಗ್ರಹಿಸುವುದು.
Sl. No. Description Unit Qty Rate (Rs. Ps.) Amount (Rs. Ps.)
1 Providing and Erecting of Ultra HD CC Cameras with day and night vision of good resolution with automated traffic count facility and data storage system along with UPS at Traffic census count post in two directions and suitably with all necessary arrangements round the clock with continuous operation for 2days without any interruptions. The assignment includes mobilization, collection of data including videography from-specified count location, data analysis and preparation of reports in prescribed (hard & soft copy and uploading in PMS formats in required as per classification and submission to the concerned Sub-Divisions/Divisions including arrangement of manpower with printing of Traffic details in multi colour, etc and all other incidental charges and as per the instruction of Engineer in charge of count post. Per day 54 9650.00 521100.00 5732100 74000 8880 82880
2 Providing and Erecting Traffic census count post tent of size 20'*15' for 2 days at designated count posts in urban areas including cost of transportation, installation and clearing the site after completion of the census complete as per the directions of Engineer in charge of work. (5 Chair, 1 Table) Per Day 4 1400.00 5600.00
Total Amount = 526700.00 9945.6
Assistant Executive Engineer
PWD Sub Division Belagavi
ಕೆಲಸದ ಹೆಸರು :- 2025-26 ನೇ ಸಾಲಿನ ಬೆಳಗಾವಿ ಜಿಲ್ಲೆಯ ಸವದತ್ತಿ ಉಪ ವಿಭಾಗದ ವ್ಯಾಪ್ತಿಯ ರಾಜ್ಯ ಹೆದ್ದಾರಿ ರಸ್ತೆಗಳ 27 ಸಂಚಾರ ಗಣತಿ ಕೇಂದ್ರ ಸ್ಥಾಪಿಸುವುದು ಹಾಗೂ ಅಗತ್ಯ ಮಾಹಿತಿ ಸಂಗ್ರಹಿಸುವುದು.
SI. No. Item of Work No of count post No of Days Qty Unit
1 Providing and Erecting of Ultra HD CC Cameras with day and night vision of good resolution with automated traffic count facility and data storage system along with UPS at Traffic census count post in two directions and suitably with all necessary arrangements round the clock with continuous operation for 2days without any interruptions. The assignment includes mobilization, collection of data including videography from-specified count location, data analysis and preparation of reports in prescribed (hard & soft copy and uploading in PMS formats in required as per classification and submission to the concerned Sub-Divisions/Divisions including arrangement of manpower with printing of Traffic details in multi colour, etc and all other incidental charges and as per the instruction of Engineer in charge of count post.
Traffic Census on SH Roads (SDT & YGT TQ)
ರಸ್ತೆಯ ಹೆಸರು ಮತ್ತು ಸಂಖ್ಯೆ ಗಣತಿ ಕೇಂದ್ರದ ಕಿಮೀ (New Chainage) 27 2 54 Per day
i ರಾಯಚೂರು-ಬಾಚಿ (ಎಸ್.ಎಚ್-20) 303.90
ii ಸಿಂದನೂರು ಹೆಮ್ಮಡಗಾ (ರಾ.ಹೆ.30) 188.03
iii ಸಿಂದನೂರು ಹೆಮ್ಮಡಗಾ (ರಾ.ಹೆ.30) 206.65
iv ಅವರಾದ-ಸದಾಶಿವಗಡ (ರಾ.ಹೆ.34) 484.04
v ಅವರಾದ-ಸದಾಶಿವಗಡ (ರಾ.ಹೆ.34) 497.06
vi ಅವರಾದ-ಸದಾಶಿವಗಡ (ರಾ.ಹೆ.34) 516.61
vii ಅರಭಾವಿ-ಚಳ್ಳಿಕೇರಿ (ರಾ.ಹೆ.45) 60.27
viii ಅರಭಾವಿ-ಚಳ್ಳಿಕೇರಿ (ರಾ.ಹೆ.45) 75.10
ix ಯರಗಟ್ಟಿ-ಬಬಲೇಶ್ವರ (ರಾ.ಹೆ-55) 26.34 (5.00)
x ಸವದತ್ತಿ ತಾಲೂಕಿನ ರಾ.ಹೆ-83 (ಮುನವಳ್ಳಿ) ರಿಂದ ರಾ.ಹೆ.-134 ರ ವರೆಗೆ ವ್ಹಾಯಾ ಸೊಪ್ಪಡ್ಲ-ಸತ್ತಿಗೇರಿ-ಮುಗಳಿಹಾಳ-ಮೆಳ್ಳಿಕೆರೆ ಕೂಡುವ ರಸ್ತೆ. ರಾಹೆ-73 4.79
xi ಗೋಕಾಕ - ಸವದತ್ತಿ ರಸ್ತೆ (ರಾ.ಹೆ.-103) 60.75
xii ನಾಗರಗಾಳಿ-ಕಟಕೋಳ ರಸ್ತೆ (ರಾ.ಹೆ.-138) 85.74
xiii ಅಳ್ನಾವರ-ಬೆಟಗೇರಿ ರಸ್ತೆ ರಾ.ಹೆ.-142 67.06
xiv ಎನ್.ಎಚ್-4ಎ (ಕಮತಗಾ) ದಿಂದ ರಾಹೆ-56 (ಅಳಗವಾಡಿ) ಕೂಡು ರಸ್ತೆ ರಾಹೆ-ಎನ್21 100.46
xv ಎನ್.ಎಚ್-4ಎ (ಕಮತಗಾ) ದಿಂದ ರಾಹೆ-56 (ಅಳಗವಾಡಿ) ಕೂಡು ರಸ್ತೆ ರಾಹೆ-ಎನ್21 111.86
xvi ಎನ್.ಎಚ್-4ಎ (ಕಮತಗಾ) ದಿಂದ ರಾಹೆ-56 (ಅಳಗವಾಡಿ) ಕೂಡು ರಸ್ತೆ ರಾಹೆ-ಎನ್21 126.56
xvi ಎನ್.ಎಚ್-4ಎ (ಕಮತಗಾ) ದಿಂದ ರಾಹೆ-56 (ಅಳಗವಾಡಿ) ಕೂಡು ರಸ್ತೆ ರಾಹೆ-ಎನ್21 140.00
xviii ಅರಭಾವಿ - ಚಳ್ಳಕೆರೆ (ರಾ.ಹೆ-45) 45.29
xix ರಾಯಚೂರು-ಬಾಚಿ (ಎಸ್.ಎಚ್-20) 282.88
xx ರಾಯಚೂರು-ಬಾಚಿ (ಎಸ್.ಎಚ್-20) 290.68
xxi ಯರಗಟ್ಟಿ-ಬಬಲೇಶ್ವರ (ರಾ.ಹೆ-55) 10.14
xxii ನಾಗರಗಾಳಿ-ಕಟಕೋಳ ರಸ್ತೆ (ರಾ.ಹೆ.-138) 110.28
xxiii ಅಳ್ನಾವರ-ಬೆಟಗೇರಿ ರಸ್ತೆ ರಾ.ಹೆ.-140 91.45
xxiv ರಸ್ತೆ ಎಸ್ಎಚ್-83 (ಮುನವಳ್ಳಿ)ಯಿಂದ ಸೊಪ್ಪಡ್ಲ-ಸತ್ತಿಗೇರಿ-ಮುಗಳಿಹಾಳ-ಮೆಳ್ಳಿಕೇರಿ-ಕೌಜಲಗಿ-ಕಳ್ಳಿಗುದ್ದಿ-ಹುಲಕುಂದ-ಸಾಲಹಳ್ಳಿ-ಬನ್ನೂರು ತಾಂಡಾ-ದಾಡಿಬಾವಿ ತಾಂಡಾ-ಬಟಕುರ್ಕಿ-ನಂದಿಹಾಳ್ ಮೂಲಕ ಎಸ್ಎಚ್-134. ವರೆಗೆ 9.48
xxv ರಸ್ತೆ ಎಸ್ಎಚ್-83 (ಮುನವಳ್ಳಿ)ಯಿಂದ ಸೊಪ್ಪಡ್ಲ-ಸತ್ತಿಗೇರಿ-ಮುಗಳಿಹಾಳ-ಮೆಳ್ಳಿಕೇರಿ-ಕೌಜಲಗಿ-ಕಳ್ಳಿಗುದ್ದಿ-ಹುಲಕುಂದ-ಸಾಲಹಳ್ಳಿ-ಬನ್ನೂರು ತಾಂಡಾ-ದಾಡಿಬಾವಿ ತಾಂಡಾ-ಬಟಕುರ್ಕಿ-ನಂದಿಹಾಳ್ ಮೂಲಕ ಎಸ್ಎಚ್-134. ವರೆಗೆ 15.01
xxvi ರಸ್ತೆ ಎಸ್ಎಚ್-83 (ಮುನವಳ್ಳಿ)ಯಿಂದ ಸೊಪ್ಪಡ್ಲ-ಸತ್ತಿಗೇರಿ-ಮುಗಳಿಹಾಳ-ಮೆಳ್ಳಿಕೇರಿ-ಕೌಜಲಗಿ-ಕಳ್ಳಿಗುದ್ದಿ-ಹುಲಕುಂದ-ಸಾಲಹಳ್ಳಿ-ಬನ್ನೂರು ತಾಂಡಾ-ದಾಡಿಬಾವಿ ತಾಂಡಾ-ಬಟಕುರ್ಕಿ-ನಂದಿಹಾಳ್ ಮೂಲಕ ಎಸ್ಎಚ್-134. ವರೆಗೆ 33.47
xxvii ರಸ್ತೆ ಎಸ್ಎಚ್-83 (ಮುನವಳ್ಳಿ)ಯಿಂದ ಸೊಪ್ಪಡ್ಲ-ಸತ್ತಿಗೇರಿ-ಮುಗಳಿಹಾಳ-ಮೆಳ್ಳಿಕೇರಿ-ಕೌಜಲಗಿ-ಕಳ್ಳಿಗುದ್ದಿ-ಹುಲಕುಂದ-ಸಾಲಹಳ್ಳಿ-ಬನ್ನೂರು ತಾಂಡಾ-ದಾಡಿಬಾವಿ ತಾಂಡಾ-ಬಟಕುರ್ಕಿ-ನಂದಿಹಾಳ್ ಮೂಲಕ ಎಸ್ಎಚ್-134. ವರೆಗೆ 24.65
Total 54 Per day
2 Providing and Erecting Traffic census count post tent of size 20'*15' for 2 days at designated count posts in urban areas including cost of transportation, installation and clearing the site after completion of the census complete as per the directions of Engineer in charge of work. (5 Chair, 1 Table)
ii ಎನ್.ಎಚ್-4ಎ (ಕಮತಗಾ) ದಿಂದ ರಾಹೆ-56 (ಅಳಗವಾಡಿ) ಕೂಡು ರಸ್ತೆ ರಾಹೆ-ಎನ್21 126.56
Total 4 Per day
Assistant Executive Engineer
PWD Sub Division Saundatti
ಕೆಲಸದ ಹೆಸರು :- 2025-26 ನೇ ಸಾಲಿನ ಬೆಳಗಾವಿ ಜಿಲ್ಲೆಯ ಸವದತ್ತಿ ಉಪ ವಿಭಾಗದ ವ್ಯಾಪ್ತಿಯ ರಾಜ್ಯ ಹೆದ್ದಾರಿ ರಸ್ತೆಗಳ 27 ಸಂಚಾರ ಗಣತಿ ಕೇಂದ್ರ ಸ್ಥಾಪಿಸುವುದು ಹಾಗೂ ಅಗತ್ಯ ಮಾಹಿತಿ ಸಂಗ್ರಹಿಸುವುದು.
Sl. No Description Unit Vol No Page No Item No Basic Rate
1 Providing and Erecting of Ultra HD CC Cameras with day and night vision of good resolution with automated traffic count facility and data storage system along with UPS at Traffic census count post in two directions and suitably with all necessary arrangements round the clock with continuous operation for 2days without any interruptions. The assignment includes mobilization, collection of data including videography from-specified count location, data analysis and preparation of reports in prescribed (hard & soft copy and uploading in PMS formats in required as per classification and submission to the concerned Sub-Divisions/Divisions including arrangement of manpower with printing of Traffic details in multi colour, etc and all other incidental charges and as per the instruction of Engineer in charge of count post. Per day SEBC approved rate letter No: 03395 Dated: 30 SEP 2025 9650.00
2 Providing and Erecting Traffic census count post tent of size 20'*15' for 2 days at designated count posts in urban areas including cost of transportation, installation and clearing the site after completion of the census complete as per the directions of Engineer in charge of work. (5 Chair, 1 Table) Per Day SEBC approved rate letter No: 03395 Dated: 30 SEP 2025 1400.00
Assistant Executive Engineer
PWD Sub Division Saundatti
PÉ.¦.qÀ§Æèöå.r. ¥ÁågÁ 133 ¥ÀæPÁgÀ ¥ÀæªÀiÁt ¥ÀvÀæ
ಕೆಲಸದ ಹೆಸರು :- 2025-26 ನೇ ಸಾಲಿನ ಬೆಳಗಾವಿ ಜಿಲ್ಲೆಯ ಸವದತ್ತಿ ಉಪ ವಿಭಾಗದ ವ್ಯಾಪ್ತಿಯ ರಾಜ್ಯ ಹೆದ್ದಾರಿ ರಸ್ತೆಗಳ 27 ಸಂಚಾರ ಗಣತಿ ಕೇಂದ್ರ ಸ್ಥಾಪಿಸುವುದು ಹಾಗೂ ಅಗತ್ಯ ಮಾಹಿತಿ ಸಂಗ್ರಹಿಸುವುದು.
£Á£ÀÄ ²æÃ, J¸ï. J£ï. ªÀÄgÀ¼À¥Àà£ÀªÀgÀ, ¸ÀºÁAiÀÄPÀ PÁAiÀÄð¤ªÁºÀPÀ C©üAiÀÄAvÀgÀgÀÄ, ¯ÉÆÃ.E. G¥À «¨sÁUÀ £ÀA.1, ¨É¼ÀUÁ« ¸ÀévÀ: PÉ®¸ÀzÀ ¸ÀܼÀªÀ£ÀÄß ¥Àj²Ã°¹zÉÝãÉ. ºÁUÀÆ ªÀÄAdÆgÁzÀ zÀgÀ¥ÀnÖAiÀÄ ¥ÀæPÁgÀ CAzÁdÄ ¥ÀwæPÉAiÀÄ£ÀÄß vÀAiÀiÁj¸À¯ÁVzÀÄÝ, EzÀÄ CvÀåAvÀ PÀrªÉÄ ªÉaÑzÀÄÝ, ºÁUÀÆ ¸ÀÄgÀPÀëvÀªÉAzÀÄ F ªÀÄÆ®PÀ ¥ÀæªÀiÁtÂÃPÀj¸ÀÄvÉÛãÉ.
¸ÀºÁAiÀÄPÀ PÁAiÀÄðPÁj C©üAiÀÄAvÀgÀÄ,
¯ÉÆÃ.§AzÀgÀÄ ªÀÄvÀÄÛ M.d.¸Á.E¯ÁSÉ,
G¥À «¨sÁUÀ £ÀA.1, ¨É¼ÀUÁ«.
¸À.C.£ÀA:¦qÀ§Æèöå:J¸ï.J¯ï.¹.:J¸ï.JA.91:¢£ÁAPÀ: 27-6-1991 gÀ ¥ÀæPÁgÀ ¥ÀæªÀiÁt ¥ÀvÀæ
£ÀªÀÄä w¼ÀĪÀ½PÉ ºÁUÀÆ £ÀA©UÉAiÀÄAvÉ F CAzÁdÄ ¥ÀwæPÉAiÀÄ£ÀÄß vÀAiÀiÁj¸ÀĪÁUÀ vÁAwæPÀªÁV CUÀvÀå«gÀĪÀ J¯Áè LlAUÀ¼À£ÀÄß ¸ÁPÀµÀÄÖ ¥ÀæªÀiÁtzÀ°è C¼ÀªÀr¸À¯ÁVzÉ. JAzÀÄ F ªÀÄÆ®PÀ ¥ÀæªÀiÁtÂÃPÀj¸ÀÄvÉÛãÉ.
¸ÀºÁAiÀÄPÀ PÁAiÀÄðPÁj C©üAiÀÄAvÀgÀÄ,
¯ÉÆÃ.§AzÀgÀÄ ªÀÄvÀÄÛ M.d.¸Á.E¯ÁSÉ,
G¥À «¨sÁUÀ £ÀA.1, ¨É¼ÀUÁ«.
PÀ¼ÉzÀ ªÀÄÆgÀÄ ªÀµÀðUÀ¼À°è ¸ÀzÀj PÁªÀÄUÁjAiÀÄÄ ¨ÉÃgÉ AiÀiÁªÀÅzÉà AiÉÆÃd£ÉAiÀÄrAiÀÄ°è ¸ÉÃj®è , ºÁUÀÆ PÁªÀÄUÁjAiÀÄ£ÀÄß PÉÊUÉwÛPÉÆAr®èªÉAzÀÄ F ªÀÄÆ®PÀ ¥ÀæªÀiÁtÂÃPÀj¸ÀÄvÉÛãÉ.
¸ÀºÁAiÀÄPÀ PÁAiÀÄðPÁj C©üAiÀÄAvÀgÀÄ, PÁAiÀÄðPÁj C©üAiÀÄAvÀgÀÄ,
¯ÉÆÃ.§AzÀgÀÄ ªÀÄvÀÄÛ M.d.¸Á.E¯ÁSÉ, ¯ÉÆÃ.§AzÀgÀÄ ªÀÄvÀÄÛ M.d.¸Á.E¯ÁSÉ,
G¥À «¨sÁUÀ £ÀA.1,¨É¼ÀUÁ«. ¨É¼ÀUÁ« «¨sÁUÀ,¨É¼ÀUÁ«.
Financial Year Total value of Civil Engineering works executed and payments received in the last five years (in Rs. lac)
Attach Chartered Accountant's Yearwise Statements.with audited profit and loss account
Note : Documents shall be attested by the Notary or Government Gazetted and original documents to be submitted at the time of opening of Technical bid for verification
Work executed as prime contractor (in the same name) on works of similar nature during the five years specified)
Project Name Name & Address of the Employer Name of Work Contract Number Value of contract Rs. Lakhs Date of Markout /Date of Handing over of site Specified period of completion (including/excluding Monsoon Actual date of completion Remarks (appreciation letter received for early completion or reasons, if there is delay in completion)
Attach Workdone Certificate for each work indicated above, in Format 3, obtained from the Competent Authority
Note : Documents shall be attested by the Notary or Government Gazetted and original documents to be submitted at the time of opening of Technical bid for verification
Quantities of work executed as prime contractor (in the same name) during the last five years i.e., from 2015-16 to 2019-20
Year Name of Work Name of Employer Quantity of work performed Remarks(Indicate contract reference)
Earth work excavation in Cum Plain Cement Concrete (in Cum) Reinforced Cement Concrete (in Cum) Stone Masonry (in Cum) Brick Masonry (in Cum) Steel (in Qtl) Finishinh Items (in Sqm)
Attach Workdone Certificate for each work indicated above, obtained from the Competent Authority not below the rank of Executive Engineer or equivalent.
Note : Documents shall be attested by the Notary or Government Gazetted
FORMAT FOR WORK DONE CERTIFICATE TO BE OBTAINED FROM COMPETENT AUTHORITY
has executed/ is executing(strike off which ever is not applicable) the work of .............................................
in this Organisation. The details of the work is as under:
1 Name of the Project :
2 Name of the Work :
3 Contract Amount :
4 Date of signing the Agreement :
5 Date of handing over of the Site :
6 Progress * : 2019
January February March April May June July August September October November December
Earth work excavation Physical in cum :
Financial in lac :
Plain Cement Concrete Physical in Cum :
Financial in lac :
Reinforced Cement Concrete Physical in cum :
Financial in lac :
Brick Masonry Physical in Cum :
Financial in lac :
Steel Physical is Qtl :
Financial in lac :
Finishinh Items Physical in Sqm :
Financial in lac :
Financial in lac :
Progress * : 2020
January February March April May June July August September October November December
Earth work excavation Physical in cum :
Financial in lac :
Plain Cement Concrete Physical in Cum :
Financial in lac :
Reinforced Cement Concrete Physical in cum :
Financial in lac :
Brick Masonry Physical in Cum :
Financial in lac :
Steel Physical is Qtl :
Financial in lac :
Finishinh Items Physical in Sqm :
Financial in lac :
Financial in lac :
Progress * : 2021
January February March April May June July August September October November December
Earth work excavation Physical in cum :
Financial in lac :
Plain Cement Concrete Physical in Cum :
Financial in lac :
Reinforced Cement Concrete Physical in cum :
Financial in lac :
Brick Masonry Physical in Cum :
Financial in lac :
Steel Physical is Qtl :
Financial in lac :
Finishinh Items Physical in Sqm :
Financial in lac :
Financial in lac :
Progress * : 2022
January February March April May June July August September October November December
Earth work excavation Physical in cum :
Financial in lac :
Plain Cement Concrete Physical in Cum :
Financial in lac :
Reinforced Cement Concrete Physical in cum :
Financial in lac :
Brick Masonry Physical in Cum :
Financial in lac :
Steel Physical is Qtl :
Financial in lac :
Finishinh Items Physical in Sqm :
Financial in lac :
Financial in lac :
Progress * : 2023
January February March April May June July August September October November December
Earth work excavation Physical in cum :
Financial in lac :
Plain Cement Concrete Physical in Cum :
Financial in lac :
Reinforced Cement Concrete Physical in cum :
Financial in lac :
Brick Masonry Physical in Cum :
Financial in lac :
Steel Physical is Qtl :
Financial in lac :
Finishinh Items Physical in Sqm :
Financial in lac :
Financial in lac :
Progress * : 2024
January February March
Earth work excavation Physical in cum :
Financial in lac :
Plain Cement Concrete Physical in Cum :
Financial in lac :
Reinforced Cement Concrete Physical in cum :
Financial in lac :
Brick Masonry Physical in Cum :
Financial in lac :
Steel Physical is Qtl :
Financial in lac :
Finishinh Items Physical in Sqm :
Financial in lac :
Financial in lac :
7 Stipulated Period of Completion (including monsoon)
8 Prescribed Date of completion
9 Actual Date of Completion/ Probable Date of Completion
10 Cost of balance work (if work is in progress) :
11 Reasons if any for delay in completion, if work completion is delayed :
12 Penalty if any imposed :
13 Any other information :
* Monthwise progress shall be furnished seperately.
Date: (Authorised Signatory)
Address for correspondence:
Note : Documents shall be attested by the Notary or Government Gazetted and original documents to be submitted at the time of opening of Technical bid for verification
Monthly Physical and Financial Progress Achieved in all Contracts which are referred to in Format 3
Names of Works Item of Work Names of Employers 2019-20 Remarks (Indicate contract reference)
January February march April May June July August September October November December
Earthworks in cum Physical
Plain Cement Concrete (in Cum) Physical
Reinforced Cement Concrete (in Cum) Physical
Stone Masonry (in Cum) Physical
Brick Masonry (in Cum) Physical
Steel (in Qtl) Physical
Finishinh Items (in Sqm) Physical
Earthworks in cum Physical
Plain Cement Concrete (in Cum) Physical
Reinforced Cement Concrete (in Cum) Physical
Stone Masonry (in Cum) Physical
Brick Masonry (in Cum) Physical
Steel (in Qtl) Physical
Finishinh Items (in Sqm) Physical
Earthworks in cum Physical
Plain Cement Concrete (in Cum) Physical
Reinforced Cement Concrete (in Cum) Physical
Stone Masonry (in Cum) Physical
Brick Masonry (in Cum) Physical
Steel (in Qtl) Physical
Finishinh Items (in Sqm) Physical
Earthworks in cum Physical
Plain Cement Concrete (in Cum) Physical
Reinforced Cement Concrete (in Cum) Physical
Stone Masonry (in Cum) Physical
Brick Masonry (in Cum) Physical
Steel (in Qtl) Physical
Finishinh Items (in Sqm) Physical
Earthworks in cum Physical
Plain Cement Concrete (in Cum) Physical
Reinforced Cement Concrete (in Cum) Physical
Stone Masonry (in Cum) Physical
Brick Masonry (in Cum) Physical
Steel (in Qtl) Physical
Finishinh Items (in Sqm) Physical
Note : Documents shall be attested by the Notary or Government Gazetted and original documents to be submitted at the time of opening of Technical bid for verification.
Information on works which are yet to be completed.
(EXISTING COMMITMENTS AND ON-GOING WORKS)
Project Name Name & Address of the Employer Name of Work Contract Number Value of contract Rs. Lakhs Date of Markout /Date of Handing over of site Specified period of completion (including/excluding Monsoon cost of balance works remaining Rs. in lac Probable date of completion
Attach Certificate for each work indicated above, in Format 3, obtained from the Competent Authority
Note : Documents shall be attested by the Notary or Government Gazetted.
Information of the works for which Tender acceptance letters are received.
Project Name Name & Address of the Employer Name of Work Tendered Amount in Rs lac Specified period of completion (including/excluding Monsoon Probable Date of Handing over of site
Attach letters of Acceptance received.
Note : Documents shall be attested by the Notary or Government Gazetted.
Information of the works for which Tenderer has submitted Tender.
Project Name Name & Address of the Employer Name of Work Amount put to Tender in Rs lac. Specified period of completion (including/excluding Monsoon Prescribed last date of submission of tender Probable date of decision on the Tender Remarks if any.
List of Machineries Required
Item of Equipment Requirement Owned/ Hired/Leased Owned/ Hired/Lease and available Remarks
No. Capacity Number/Capacity Age/ Condition
Note : Documents shall be attested by the Notary or Government Gazetted and original documents to be produced at the time of opening of Technical bid for verification.
BANKER’S CERTIFICATE
This is to certify that M/s. ………………………….. is a reputed company with a good financial standing. If the contract for this work, namely............................................................................... ............................................................................................................................................... (Name of the work) is awarded to the above firm, we shall be able to provide overdraft/credit facilities to the extent of Rs. …………....../- (inwards) .................................................................... ............................................................................................................................................... to meet the working capital requirements for executing the above contract
Name of the Bank, Senior Bank Manger
Note : Documents shall be attested by the Notary or Government Gazetted and original documents to be submitted at the time of opening of Technical bid for verification.
Information on litigation in which the Tenderer is involved:
Other Party/Parties Employer Details of Dispute Amount involved Remarks showing Present Status
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
Govt Circular Agreement Format FD756EXP-12-2024-Dtd-08-10-2024.pdf
Others - Govt ltr • 2.38 MB
TRAFFIC CENSUS Formats-2025 1-4.xls
Others - formats • 0.52 MB
28528 bid doc gen kw-1.doc
Tender Document • 2.01 MB
appeal go.pdf
Others - Govt ltr • 0.93 MB
royalty go.zip
Others - Royalty • 0.07 MB
Detail Estimate SH SDT 28528.xlsx
Others - Estimate • 0.06 MB
NIT kppp_formats.xls
Others - formats • 0.12 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .