| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹42.7 CrAdmitted-Finance | ₹42.7 Cr | L1 | Admitted-Finance |
| 2 | L2₹45.9 CrAdmitted-Finance | ₹45.9 Cr | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical Required documents are not uploaded as per NIT, Hence Disqualified |
| Sl No | Description | Qty | Unit | Ozone Research and Applications India Private Limited L1 | M/s Eco Paryavaran Engineers and Consultants Private Limited L2 |
|---|---|---|---|---|---|
| 1.00Sub Estimate No 1- Chavdar Tale (Civil Work) (Please refer the Schedule B in tender document) | |||||
| 2.00 | Dismantling stone masonry in lime or cement mortar including stacking the materils as directed with all leads, lifts etc. | 58.32 | Cubic Meter | 392.5 ₹22,890.60 | 423.36 ₹24,690.36 |
| 3.00 | Removing rich mix cement concrete including stacking the spoils as directed with all leads, lifts etc, complete. | 354 | Cubic Meter | 960 ₹3.4 L | 1,036.13 ₹3.7 L |
| 4.00 | Removing cement tiles, or marble or polished shahabad floor or dado without bed concrete including stacking the materials as directed with all leads, lifts etc. complete | 935.36 | Square Meter | 46.5 ₹43,494.24 | 50.11 ₹46,872.76 |
| 5.00 | Removing iron pipe raling having wooden R.C.C. or C.C. or iron post and stacking the materials as directed etc. complete. | 923.4 | Running Meter | 72 ₹66,484.80 | 76.85 ₹70,966.06 |
| 6.00 | Excavation for foundation in hard murum and boulders including removing the excavated material up to a distance 50 metres, beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. with all leads and lift By Mechanical Means | 355.5 | Cubic Meter | 260 ₹92,430 | 280.8 ₹99,824.40 |
| 7.00 | Excavation for foundation in Soft rock and old cement or lime masonry foundations including removing the excavated material upto a distance of 50 metres beyond the building area and stacking as directed, including dewatering, preparing the bed for the foundation and necessary back filling with available earth /murum, ramming, watering including shoring and strutting etc. complete with all leads and lift By Mechanical Means | 5.4 | Cubic Meter | 325 ₹1,755 | 347.6 ₹1,877.03 |
| 8.00 | Excavation for foundation in Hard rock by chiselling, wedging, line drilling, etc. including trimming and levelling the bed, removing the excavated material upto a distance of 50 metres beyond the building area stacking as directed, dewatering and back filling with available earth/ murum watering, ramming etc. complete. with all leads and lift By Mechanical Means | 2.7 | Cubic Meter | 1,348.5 ₹3,640.95 | 1,456.16 ₹3,931.64 |
| 9.00 | Providing preconstructional antitermite treatment as per I.S. 6313 (Part-II) by treating the bottom surface and sides of excavation at the rate of 5 litres of emulsion concentrate of 1.0 percent of chlorophyrifos per square meter of surface area covering 5 years guarantee on bond paper. | 9 | Square Meter | 110.38 ₹993.42 | 119.88 ₹1,078.92 |
| 10.00 | Excavation for foundation in hard murum and boulders including shoring and strutting, dewatering as necessary and disposing off excavated stuff as directed etc. complete. with all leads and lifts. | 38.02 | Cubic Meter | 384 ₹14,599.68 | 414.23 ₹15,749.18 |
Tender Value
₹42.5 Cr
EMD Value
₹21.3 L
Closing Date
7 Apr 2026, 12:00 pmClosed
Executive Engineer
Office of the Executive Engineer, Civil Division, Mahad.
DC Work ..Providing and installing an Ozonisation-based water purification system and carrying out development and beautification of the surrounding area at the historic Chavdar Tale, Mahad.
2026_MIDC_1289823_1
425364751
Open Tender
Civil Works - Others
Chavdar Tale Mahad
Please refer Tender documents.
2 documents required · 2 mandatory
₹30,680
₹21.3 L
Yes
10 Apr 2026
25 Mar 2026
8 Apr 2026
25 Mar 2026
7 Apr 2026
1 Apr 2026
25 Mar 2026 - 30 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1Sub Estimate No 1- Chavdar Tale (Civil Work) (Please refer the Schedule B in tender document) | ||||||
| 2 | Dismantling stone masonry in lime or cement mortar including stacking the materils as directed with all leads, lifts etc. | 58.32 | Cubic Meter | 392.01 | ₹22,862.02 | BI01010001010000000000000515BI0100001113 |
| 3 | Removing rich mix cement concrete including stacking the spoils as directed with all leads, lifts etc, complete. | 354 | Cubic Meter | 959.39 | ₹3,39,624.06 | BI01010001010000000000000515BI0100001114 |
| 4 | Removing cement tiles, or marble or polished shahabad floor or dado without bed concrete including stacking the materials as directed with all leads, lifts etc. complete | 935.36 | Square Meter | 46.42 | ₹43,419.41 | BI01010001010000000000000515BI0100001115 |
| 5 | Removing iron pipe raling having wooden R.C.C. or C.C. or iron post and stacking the materials as directed etc. complete. | 923.4 | Running Meter | 71.18 | ₹65,727.61 | BI01010001010000000000000515BI0100001116 |
| 6 | Excavation for foundation in hard murum and boulders including removing the excavated material up to a distance 50 metres, beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. with all leads and lift By Mechanical Means | 355.5 | Cubic Meter | 259.96 | ₹92,415.78 | BI01010001010000000000000515BI0100001117 |
| 7 | Excavation for foundation in Soft rock and old cement or lime masonry foundations including removing the excavated material upto a distance of 50 metres beyond the building area and stacking as directed, including dewatering, preparing the bed for the foundation and necessary back filling with available earth /murum, ramming, watering including shoring and strutting etc. complete with all leads and lift By Mechanical Means | 5.4 | Cubic Meter | 321.86 | ₹1,738.04 | BI01010001010000000000000515BI0100001118 |
| 8 | Excavation for foundation in Hard rock by chiselling, wedging, line drilling, etc. including trimming and levelling the bed, removing the excavated material upto a distance of 50 metres beyond the building area stacking as directed, dewatering and back filling with available earth/ murum watering, ramming etc. complete. with all leads and lift By Mechanical Means | 2.7 | Cubic Meter | 1,348.3 | ₹3,640.41 | BI01010001010000000000000515BI0100001119 |
| 9 | Providing preconstructional antitermite treatment as per I.S. 6313 (Part-II) by treating the bottom surface and sides of excavation at the rate of 5 litres of emulsion concentrate of 1.0 percent of chlorophyrifos per square meter of surface area covering 5 years guarantee on bond paper. | 9 | Square Meter | 110.38 | ₹993.42 | BI01010001010000000000000515BI0100001120 |
| 10 | Excavation for foundation in hard murum and boulders including shoring and strutting, dewatering as necessary and disposing off excavated stuff as directed etc. complete. with all leads and lifts. | 38.02 | Cubic Meter | 383.55 | ₹14,582.57 | BI01010001010000000000000515BI0100001121 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.84 MB
TenderDocument.pdf
Tender Documents • 0.74 MB
ChavdaarTaleDrawings.pdf
Other Document • 10.20 MB
ItemSpecification.pdf
Tender Documents • 0.34 MB
BOQ_2217514.xls
BOQ • 0.50 MB
Download all tender documents and submit your bid