Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.2 LAccepted-AOC AT LAMTIBAHAL BRAJRAJNAGAR DIST JHARSUGUDA ODISHA 768216 | BRAJRAJNAGAR | JHARSUGUDA | ODISHA | 768216 | ₹1.2 L | 1 | Accepted-AOC L1 |
| 2 | Rejected-Technical | - | - | Rejected-Technical not being L1 |
| 3 | Rejected-Technical | - | - | Rejected-Technical not being L1 |
| Sl No | Description | Qty | Unit | Rohit Kumar Pachisia L1 | Rohini Sharma L3 | MARUTI CONSTRUCTIONS L2 |
|---|---|---|---|---|---|---|
| 1.00Rebuilding of Bearing seating Area, Neck Ring seating area. Both Rotating Assembly and upper lower half Assembly of quarry pump at LOCP. | ||||||
| 1.01 | Rebuilding of Bearing seating Area with special Electrode Lomelt 210 | 30 | kg | 3,328 ₹99,840 | 3,456 ₹1.0 L | 3,424 ₹1.0 L |
| 1.02 | Machining charge for hiring and keyway cutting | 16 | nos | 208 ₹3,328 | 216 ₹3,456 | 214 ₹3,424 |
| 1.03 | Grinding of Pump body area Assembly group and sizing Grinding stone | 6 | nos | 156 ₹936 | 162 ₹972 | 160 ₹960 |
| 1.04 | 01 semi Skilled labour X 02 Shift X 03 days (including Contrctor profit) | 6 | shift | 755.87 ₹4,535.23 | 784.94 ₹4,709.66 | 777 ₹4,662 |
| 1.05 | 02 un skilled labour X 02 shift X 03 days (including Contractor profit) | 12 | shift | 647.04 ₹7,764.43 | 671.92 ₹8,063.06 | 665 ₹7,980 |
| 2.00 | Total impact of GST plus Labour Cess [@ 1 % (BOCW Cess to be deducted from the RA bill as per the value of the work progress)] for the purpose of CTC | 1 | Nos | 1,164.04 ₹1,164.04 | 1,208.81 ₹1,208.81 | 1,197.46 ₹1,197.46 |
Tender Value
₹1.3 L
EMD Value
₹1,700
Closing Date
2 Mar 2026, 5:00 pmClosed
Project Engineer(EnM),Locp
Office of project engineer(EnM) LOCP
Rebuilding of Bearing seating Area, Neck Ring seating area. Both Rotating Assembly and upper lower half Assembly of quarry pump at LOCP.
2026_MCL_353448_1
MCL/GM/IBV/ENM/LOCP/037 dated 17/02/2026
Open Tender
Miscellaneous Works
7 days
Office of project engineer(EnM) LOCP
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,700
16 Mar 2026
17 Feb 2026
5 Mar 2026
17 Feb 2026
2 Mar 2026
18 Feb 2026
17 Feb 2026 - 23 Feb 2026
Rebuilding of Bearing seating Area, Neck Ring seating area. Both Rotating Assembly and upper lower half Assembly of quarry pump at LOCP.
Rebuilding of Bearing seating Area with special Electrode Lomelt 210
Machining charge for hiring and keyway cutting
Grinding of Pump body area Assembly group and sizing Grinding stone
01 semi Skilled labour X 02 Shift X 03 days (including Contrctor profit)
02 un skilled labour X 02 shift X 03 days (including Contractor profit)
Total impact of GST plus Labour Cess [@ 1 % (BOCW Cess to be deducted from the RA bill as per the value of the work progress)] for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.71 MB
Tendernotice_2.pdf
PDF • 1.13 MB
BOQ_366249.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid