Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.6 LAccepted-AOC | L1 | Accepted-AOC ok | |
| 2 | L2₹13.1 L+₹15,025.65 (1.16%)Rejected-Finance | L2 | Rejected-Finance OK |
Tender Value
₹10.0 L
EMD Value
₹20,000
Closing Date
28 Jun 2022, 6:00 pmClosed
Executive Engineer Jubbal
HPPWD Jubbal
C/O Breast wall at RD 1/389 to 1/434,1/457 to 1/484 and Retaining wall at RD 1/546 to 1/563.50
2022_PWD_62039_2
PW-JD/E-Tender/2022-23 -2795-97 DT. 18.06.2022
Open Tender
Civil Works - Roads
Item Rate
60 days
Jubbal
Please refer Tender documents.
11 documents required · 11 mandatory
₹350
₹20,000
26 Aug 2022
23 Jun 2022
29 Jun 2022
23 Jun 2022
28 Jun 2022
23 Jun 2022
Amount
Excavation in soil in Hilly Area in all kind of sand by mechanical/manual means including cutting and trimming of side slopes and disposing of excavated earth with a lift upto any lead and lift as per Technical Specification Clause 1603.1 and as per HPPWD, specification of 1990 Volume-I, or as directed by the Engineer-In-Charge.
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a any lead and lift , dressing of sides and bottom and backfilling in trenches with excavated suitable material.useful material available from excavation to be properly stacked and handed over to the department free of cost including all leads and lifts, as per HPPWD, specification of 1990 volume-I or as directed by the Engineer-In-Charge
Providing and Laying concrete concrete 1:6:12 (1cement: 6 sand: 12 graded stone aggregate 40mm nominal size)for plain/reinforced concrete in open foundations complete as per drawing and technical specification clauses 802, 803, 1202 and 1203 including all leads and lifts, as per HPPWD, specification of 1990 volume-I or as directed by the Engineer-In-Charge
Stone Random Rubble Masonry work In cement mortar 1:6 (1 cement : 6 sand ) in foundation complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203..including carriage of material with in all leads and lifts as per direction of Engineer-In-Charge.
Providing weapholes in brick masonry / stone masonry /plain reinforced concrete abutment, wing wall, return wall with 100 mm dia PVC pipe extending through the full with of the structures with slop of 1(v):20(H) towards drawing face complete as per drawing and technical specification clauses 614, 709, 1204.3.7
Backfilling with Granular material behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 including all leads and lifts, as per HPPWD, specification of 1990 volume-I or as directed by the Engineer-In-Charge
Rekha Chauhan
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .