Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹36.0 LAccepted-Finance | L1 | Accepted-Finance Lowest | |
| 2 | L2₹43.6 L+₹7.6 L (21.1%)Rejected-Finance SCHEME NO 07 BLOCK NO 22 FLAT NO 03 NEW GURDASPUR DISTT GURDASPUR PB 143521 | GURDASPUR | PUNJAB | 143521 | L2 | Rejected-Finance Other than lowest |
| Sl No | Description | Qty | Unit | P S BUILDERS L1 | HARPAL ENGINEERS AND BUILDERS L2 |
|---|---|---|---|---|---|
| 1.00 | S&F in replacement to STP main control panel by disconnecting all electric connections and dismentling the annuciator, alongwith all connected parts and re-assembling after necesssary repair, replacement of lugs,dressing of cable, replacement of connectror blocks, nuts bolts and washers of suitable size and joints complete all as specified and directed. | 2 | Each Job | 558 ₹1,116 Lowest | 800 ₹1,600 |
| 2.00 | S&F in replacement and disconnecting of all electrical connections of non clog submersible pump rating 9.5 KW & discharge of 60 cum/hr, taking out from sewge well dismantling of pump, shaft impeller unit etc and shifting it to work shop for reparing, re-assembling and back after repair to the site by transport and lowering to sewage well after testing and commissioning complete all as specified and directed by Engineer-in- Charge. (Note :- Spare parts and rewinding shall be measured and paid for separately). | 4 | Each Job | 1,558 ₹6,232 Lowest | 60,000 ₹2,40,000 |
| 3.00 | M&L for dismentaling/opening the burnt motor, (rotor & stator) rewinding the motor with super enamelled copper winding as per existing gauge including insulation material cotton tape, varnish, insulation paper, sleeves, dry and backing etc including replacing of bearing and re-assembling complete motor complete all as directed. | 4 | Each Job | 5,758 ₹23,032 Lowest | 9,000 ₹36,000 |
| 4.00 | Supply and replacement of stainless steel impeller for 9.5 KW & discharge of 60 cum/hr non clog submersible pump as per existing make and capacity complete all as speicifed and directed. | 4 | Each Job | 558 ₹2,232 | 500 ₹2,000 Lowest |
| 5.00 | M&L for repair pump shaft by filling of suitable material by welding and turning of pump shaft of capacity 9.5 KW & discharge of 60 cum/hr non clog submersible pump complete all as specified and directed. | 4 | Each Job | 158 ₹632 Lowest | 900 ₹3,600 |
| 6.00 | S&F in replacement of mechanical oil seal for 9.5 KW & discharge of 60 cum/hr submersible pump as per existing make and capacity complete all as specified and directed. | 8 | Each Job | 558 ₹4,464 | 200 ₹1,600 Lowest |
| 7.00 | S&F in replacement of framed work such as grills gratings, etc. with ends of bars shoulders and / or riveted, or forged into spikes, framed guard bars, ladders, framed balusters, railings and similar article as in strainer fabrication for MBBR including welding work etc complete all as specified and directed. | 55 | KG | 78 ₹4,290 | 70 ₹3,850 Lowest |
| 8.00 | S&F selector switch complete all as specified and directed by Engineer-in-Charge | 10 | Each | 58 ₹580 Lowest | 120 ₹1,200 |
| 9.00 | S&F in replacement of MCB 32 Amp, 4 pole with rupturing capacity10 KA, C curve all as specified and directed. | 2 | Each | 558 ₹1,116 Lowest | 600 ₹1,200 |
| 10.00 | S&F in replacement of MCCB 160 Amps 4 Pole 25KA complete all as specified and directed by Engineer-in-Charge. | 2 | Each | 6,758 ₹13,516 | 600 ₹1,200 Lowest |
Tender Value
₹49 L
EMD Value
₹98,000
Closing Date
16 Jun 2026, 6:00 pmClosed
Garrison Engineer, Gurdaspur.
Garrison Engineer, Gurdaspur (Tibri)
Repair and maint of STPs, high mast, parking and garden lights under GE Gurdaspur.
2026_MES_765048_1
GE GSR-33/2026-2027
Open Tender
Electrical and Maintenance Works
Item Rate
180 days
Garison Engineer
As per Tender Documents
8 documents required · 8 mandatory
₹500
GE Gurdaspur
₹98,000
9 Jul 2026
13 May 2026
23 Jun 2026
13 May 2026
16 Jun 2026
2 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | S&F in replacement to STP main control panel by disconnecting all electric connections and dismentling the annuciator, alongwith all connected parts and re-assembling after necesssary repair, replacement of lugs,dressing of cable, replacement of connectror blocks, nuts bolts and washers of suitable size and joints complete all as specified and directed. | 2 | Each Job | - | - |
| 2 | S&F in replacement and disconnecting of all electrical connections of non clog submersible pump rating 9.5 KW & discharge of 60 cum/hr, taking out from sewge well dismantling of pump, shaft impeller unit etc and shifting it to work shop for reparing, re-assembling and back after repair to the site by transport and lowering to sewage well after testing and commissioning complete all as specified and directed by Engineer-in- Charge. (Note :- Spare parts and rewinding shall be measured and paid for separately). | 4 | Each Job | - | - |
| 3 | M&L for dismentaling/opening the burnt motor, (rotor & stator) rewinding the motor with super enamelled copper winding as per existing gauge including insulation material cotton tape, varnish, insulation paper, sleeves, dry and backing etc including replacing of bearing and re-assembling complete motor complete all as directed. | 4 | Each Job | - | - |
| 4 | Supply and replacement of stainless steel impeller for 9.5 KW & discharge of 60 cum/hr non clog submersible pump as per existing make and capacity complete all as speicifed and directed. | 4 | Each Job | - | - |
| 5 | M&L for repair pump shaft by filling of suitable material by welding and turning of pump shaft of capacity 9.5 KW & discharge of 60 cum/hr non clog submersible pump complete all as specified and directed. | 4 | Each Job | - | - |
| 6 | S&F in replacement of mechanical oil seal for 9.5 KW & discharge of 60 cum/hr submersible pump as per existing make and capacity complete all as specified and directed. | 8 | Each Job | - | - |
| 7 | S&F in replacement of framed work such as grills gratings, etc. with ends of bars shoulders and / or riveted, or forged into spikes, framed guard bars, ladders, framed balusters, railings and similar article as in strainer fabrication for MBBR including welding work etc complete all as specified and directed. | 55 | KG | - | - |
| 8 | S&F selector switch complete all as specified and directed by Engineer-in-Charge | 10 | Each | - | - |
| 9 | S&F in replacement of MCB 32 Amp, 4 pole with rupturing capacity10 KA, C curve all as specified and directed. | 2 | Each | - | - |
| 10 | S&F in replacement of MCCB 160 Amps 4 Pole 25KA complete all as specified and directed by Engineer-in-Charge. | 2 | Each | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.39 MB
33TenderDocuments.pdf
Tender Documents • 1.01 MB
BOQ_856864.xls
BOQ • 0.80 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .