| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.8 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹25.3 L+₹1.4 L (6.05%)Rejected-AOC PLEASE PROVIDE THE DOCUMENT CONTAINING THE ADDRESS | NEW DELHI | DELHI | 110001 | L2 | Rejected-AOC L2 | |
| 3 | L3₹25.8 L+₹1.9 L (8.10%)Rejected-AOC | L3 | Rejected-AOC L3 | |
| 4 | L4₹26.0 L+₹2.2 L (9.25%)Rejected-AOC | L4 | Rejected-AOC L4 | |
| 5 | Rejected-Technical | - | Rejected-Technical Documents Incompleted |
Tender Value
₹28.9 L
EMD Value
₹58,000
Closing Date
13 Dec 2022, 11:00 amClosed
E.E. M.G.C.C.D-5, Bijnor
E.E. M.G.C.C.D-5, Bijnor
Construction of D.R.B. at km. 8.738 of Dingarpur Dy. Under Madhya Ganga Canal Stage-II.
2022_UPIDC_756419_10
04/EE/2022-23
Open Tender
Civil Works - Bridges
Item Wise
90 days
Dingarpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹58,000
12 Jun 2023
7 Dec 2022
13 Dec 2022
7 Dec 2022
13 Dec 2022
7 Dec 2022
Amount
Earth work in excavation of foundation in ordinary soil with 30m lead and1.5m lift with proper disposal and back filling i/c all labour , T&P etc. complete.
Providing centering and shuttering for CC i/c all cost of material, laobur etc. complete.
Supplying & Laying Cement concrete 1:3:6 M-10 in foudation including cost of all material, labour T &P etc complete.
Ist Class (M-100) brick work in 1:4 cement & c.sand mortar including cost of all material ,labour and T&P etc. complete.
Ordinary centering and shuttering for R.C.C work i/c all cost of material, laobur etc. complete.
Supply & Laying R.C.C. (M-20) including all cost of material, labour T&P etc.complete.
Supply & Laying R.C.C. (M-25) for including all cost of material, labour T&P etc.complete.
Supply & Laying R.C.C. (M-15) for including all cost of material, labour T&P etc.complete.
Supply & Laying P.C.C. (M-15) for including all cost of material, labour T&P etc.complete.
Supply & placing steel Reinforcement i/c cost of all maerial , cutting , Bending, Binding,welding etc all completion of work.
Cement Struck pointing in 1:2 C.M. including cost of all Material, Labour, T&P etc Complete. But excluding cost of Bricks.
Supplying and Laying of two coat tarfelt painting as required including all cost of Labour and T&P, Material etc. complete required for proper complition of work. As directed by engineer in charge.
Supplying & laying 100 mm dia, G I spout pipe for Drainageas as per approved drawing Including all Cost of Materials & Labour ,T&P etc. all Completion of work /R.M
Supplying and Fixing Sign board (1.50X1.00M) i/c cost of all materials , labour, T&P etc. required for proper completion of work.
Earth work in filling in all type of soil including average lead upto 600 m and lift upto 1.50 m i/c cost of labour, T&P, ramming , dressing , etc. complete as per direction of Engineer-in -Charge.
Earth work in excavation For Removing diversion including lead upto 30 m and lift upto 1.50 m i/c cost of labour, T&P, ramming , dressing , etc. complete as per direction of Engineer-in -Charge.
Supplying and Laying of R.B.M.i/c cost of all materials, labour, T&P etc. required for proper completion of work.
Supply and Laying of Brick on Edge .i/c cost of all materials, labour, T&P etc. required for proper completion of work.
ABHAY SINGH
JS cONSTRUCTIONS
M/S MOHD. IDRIS CONTRACTOR
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .