BLOCK DEVELOPMENT OFFICER VP, SETHUBAVACHATRAM
BLOCK DEVELOPMENT OFFICE, SETHUBAVACHATRAM
Construction of New Cycle Shed AT Karisavayal GHS in Azhagiyanayagipuram Panchyat Sethubavachatram Block in Thanjavur District under AGAMT 2023-2024
2023_RDTN_355993_1
302/2023/B1
Open Tender
Civil Works - Others
Works
180 days
ALAGIYANAGIPURAM
Please refer Tender documents.
9 documents required · 9 mandatory
₹0
₹6,870
Yes
12 Aug 2023
7 Aug 2023
11 Aug 2023
7 Aug 2023
11 Aug 2023
7 Aug 2023
Amount
Construction of New Cycle Shed @ Karisavayal GHS in Azhagiyanayagipuram Panchyat
Earth work Excavation and depositing on bank with initial lead and lift in all classes of soil except hard rock requiring blasting including all labour charges etc.,complete for foundation
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Cement concrete 1:4:8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Brick work in cement mortar 1:5 mix using country bricks 83/4"x41/4"x23/4" including cost and conveyance of all materials to site and all labour charges etc complete
Below basement
Supply and providing centering, in all clause of soils including all charges etc complete
Below basement
Column
Above GL
Supplying and Fabricating and placing in position MS steel or ribbed for steel for all reinforced cement concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.
Reinforced Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs wherever necessary and bearing surfaces of walls , sides and bottom of the slabs, beams etc., shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.
Plastering with CM 1:3,10mm thick inculding cost and conveyance of all materials to site and all labour charges etc.,complete
Plastering with CM 1:5,12mm thick inculding cost and conveyance of all materials to site and all labour charges etc.,complete
Providing Gronolothick floor finish inculding cost and conveyance of all materials to site and all labour charges etc.,complete
White washing two coats inculding cost and conveyance of all materials to site and all labour charges etc complete
Exterior emulsion two coats over priming coat inculding cost and conveyance of all materials to site and all labour charges etc complete
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
VELAYUTHA THEVAR VEERAPPAN
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .