Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹15.1 LAccepted-AOC 615 BHAIROTAL BAZA DAFAI BHAIROTAL KORBA CG 495454 | KORBA | CHHATTISGARH | 495454 | ₹15.1 L Quoted ₹12.8 L | L-1 | Accepted-AOC Due to L-1 bidder |
| 2 | L-2₹18.5 L+₹5.7 L (44.2%)Rejected-Finance KATGHORA ROAD DIPKA KORBA CG 495677 | KORBA | CHHATTISGARH | 495677 | ₹18.5 L+₹5.7 L (44.2%) | L-2 | Rejected-Finance Due to L-2 bidder |
| 3 | L-3₹29.6 L+₹16.8 L (130.9%)Rejected-Finance B 71 VIKAS NAGAR COLONY NEAR GURUDWARA KUSMUNDA DIST KORBA C G 495454 | KORBA | CHHATTISGARH | 495454 | ₹29.6 L+₹16.8 L (130.9%) | L-3 | Rejected-Finance Due to L-3 bidder |
| 4 | L-4₹31.7 L+₹18.9 L (147.3%)Rejected-Finance 01 KATGHORA ROAD DIPKA DIPKA KORBA DIST KORBA CG | KORBA | CHHATTISGARH | 495119 | ₹31.7 L+₹18.9 L (147.3%) | L-4 | Rejected-Finance Due to L-4 bidder |
Tender Value
₹35.7 L
EMD Value
₹44,600
Closing Date
6 Apr 2026, 5:00 pmClosed
General Manager (Civil), SECL, Gevra Area
Office of the General Manager , SECL, Gevra Area, PO Gevra Project, Distt.- Korba (CG)Contact No. 9425534065
Goaf filling inside mine near Saraisingaar chowk for preventing illegal mining at Gevra project of Gevra Area
2026_SECL_357067_1
SECL/GA/GM(C)/ETN/25-26/85 dtd. 25.03.2026
Open Tender
Civil Works - Others
Percentage
30 days
GEVRA AREA
Please refer Tender documents.
4 documents required · 4 mandatory
₹44,600
6 Aug 2026
26 Mar 2026
7 Apr 2026
26 Mar 2026
6 Apr 2026
27 Mar 2026
26 Mar 2026 - 30 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Item Description/ Heading | |||||
| 1.01 | providing and placing empty cement bags filled with local available sandy soil including stitching of bag and placing in position including cost of labour,empty bags etc. as per instrution of engineer in charge | - | each | - | - |
| 1.02 | Providing and laying in position cement concrete of1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources).1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). specified grade excluding the cost of centering and shuttering - All work up to plinth level : | - | cum | - | - |
| 1.03 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | - | cum | - | - |
| 1.04 | Centering and shuttering including strutting, propping etc. and removalof form forFoundations, footings, bases of columns, etc. for massFoundations, footings, bases of columns, etc. for massconcreteconcrete | - | sqm. | - | - |
| 2Total impact of GST for the purpose of CTC | |||||
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.06 MB
Tendernotice_2.pdf
PDF • 0.70 MB
Tendernotice_3.pdf
PDF • 1.32 MB
BOQ_369936.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .