Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.5 LAccepted-Finance | L1 | Accepted-Finance QUALIFIED | |
| 2 | L2₹12.7 L+₹2.3 L (21.8%)Accepted-Finance | L2 | Accepted-Finance QUALIFIED | |
| 3 | L3₹16.0 L+₹5.5 L (52.8%)Accepted-Finance | L3 | Accepted-Finance QUALIFIED |
Tender Value
₹20.0 L
EMD Value
₹59,880
Closing Date
4 Aug 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
WILDLIFE WARDEN KATHUA
forest complex kathua
Slope stabilization by way of laying of G I wire crate in soil erosion prone areas in different locations in Comptt Co 10 11 12 13 KTH of Thein Conservation Reserve in Wildlife Division Kathua Under CAMPA 2023 24
2023_FD_223987_1
NIT 58 WLW/K OF 2023-24
Open Tender
Civil Works
Item Rate
60 days
Thein CR
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
WILDLIFE WARDEN KATHUA
₹59,880
7 Aug 2023
28 Jul 2023
5 Aug 2023
28 Jul 2023
4 Aug 2023
28 Jul 2023
Amount
1.Slope stabilization by way of laying G.I wire crate in soil erosion prone areas Co.11/KTH. Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, depth upto 1.5 M including the disposal of excavated earth upto 1 M from the cutting edge, disposed earth to be levelled and neatly dressed in all kinds of soil
Filling of stones or spawls into crates and hand packing in vertical and side slopes including supply of stones.
Carriage of materials from source to site of work Distance 400 mtr by HL
Cost of crates (G.I wire 20x4x4 ft) of mesh size 100mmx100mmX4MM including all leads lift carriage complete job
2.Slope stabilization by way of laying G.I wire crate in soil erosion prone areas Co.11/KTH. Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, depth upto 1.5 M including the disposal of excavated earth upto 1 M from the cutting edge, disposed earth to be levelled and neatly dressed in all kinds of soil.
Filling of stones or spawls into crates and hand packing in vertical and side slopes including supply of stones.
Carriage of materials from source to site of work Distance 400 mtr by HL
Cost of crates (G.I wire 20x4x4 ft) of mesh size 100mmx100mmX4MM including all leads lift carriage complete job
3.Slope stabilization by way of laying G.I wire crate in soil erosion prone areas Co.13/KTH. Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, depth upto 1.5 M including the disposal of excavated earth upto 1 M from the cutting edge, disposed earth to be levelled and neatly dressed in all kinds of soil.
Filling of stones or spawls into crates and hand packing in vertical and side slopes including supply of stones.
Carriage of materials from source to site of work Distance 400 mtr by HL
Cost of crates (G.I wire 20x4x4 ft) of mesh size 100mmx100mmX4MM including all leads lift carriage complete job
4.Slope stabilization by way of laying G.I wire crate in soil erosion prone areas Co.11/KTH. Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, depth upto 1.5 M including the disposal of excavated earth upto 1 M from the cutting edge, disposed earth to be levelled and neatly dressed in all kinds of soil.
Filling of stones or spawls into crates and hand packing in vertical and side slopes including supply of stones.
Carriage of materials from source to site of work Distance 400 mtr by HL
Cost of crates (G.I wire 20x4x4 ft) of mesh size 100mmx100mmX4MM including all leads lift carriage complete job
5.Slope stabilization by way of laying G.I wire crate in soil erosion prone areas Co.12/KTH. Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, depth upto 1.5 M including the disposal of excavated earth upto 1 M from the cutting edge, disposed earth to be levelled and neatly dressed in all kinds of soil.
Filling of stones or spawls into crates and hand packing in vertical and side slopes including supply of stones.
Carriage of materials from source to site of work Distance 400 mtr by HL
Cost of crates (G.I wire 20x4x4 ft) of mesh size 100mmx100mmX4MM including all leads lift carriage complete job
6.Slope stabilization by way of laying G.I wire crate in soil erosion prone areas Co.13/KTH. Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, depth upto 1.5 M including the disposal of excavated earth upto 1 M from the cutting edge, disposed earth to be levelled and neatly dressed in all kinds of soil
Filling of stones or spawls into crates and hand packing in vertical and side slopes including supply of stones.
Carriage of materials from source to site of work Distance 400 mtr by HL
Cost of crates (G.I wire 20x4x4 ft) of mesh size 100mmx100mmX4MM including all leads lift carriage complete job
7.Slope stabilization by way of laying G.I wire crate in soil erosion prone areas Co.13/KTH. Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, depth upto 1.5 M including the disposal of excavated earth upto 1 M from the cutting edge, disposed earth to be levelled and neatly dressed in all kinds of soil
Filling of stones or spawls into crates and hand packing in vertical and side slopes including supply of stones.
Carriage of materials from source to site of work Distance 400 mtr by HL
Cost of crates (G.I wire 20x4x4 ft) of mesh size 100mmx100mmX4MM including all leads lift carriage complete job
Khem Raj
SANJEEV SINGH
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .