Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹12.7 LAdmitted-Fee/PreQual/Technical/Finance | -33.79% | ₹12.7 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹14.0 L+₹1.3 L (9.88%)Admitted-Fee/PreQual/Technical/Finance | -27.25% | ₹14.0 L+₹1.3 L (9.88%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹14.3 L+₹1.6 L (12.2%)Admitted-Fee/PreQual/Technical/Finance | -25.70% | ₹14.3 L+₹1.6 L (12.2%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹14.3 L+₹1.6 L (12.7%)Admitted-Fee/PreQual/Technical/Finance | -25.40% | ₹14.3 L+₹1.6 L (12.7%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹15.6 L+₹2.9 L (22.7%)Admitted-Fee/PreQual/Technical/Finance | -18.78% | ₹15.6 L+₹2.9 L (22.7%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹19.2 L
EMD Value
₹38,440
Closing Date
12 Sept 2026, 4:00 pmClosed
Executive Engineer
XEN HAND
Upgradation /Improvement of Satkoji links/inner links
2026_PWDJK_323456_3
NIT NO 35 OF 2026-27
Open Tender
Civil Works
Percentage
60 days
Handwara
Please refer Tender documents.
2 documents required · 2 mandatory
₹800
Yes
Executive Engineer Handwara
₹38,440
Yes
14 Sept 2026
5 Sept 2026
14 Sept 2026
5 Sept 2026
12 Sept 2026
5 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earthlead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.
All kinds of soil : | 720 | cum | 187.3 | ₹1,34,856 |
| 2 | Earth work in excavation in all kinds of soils by Mechanical means in foundation footings drains pipes etc trenches including disposal of excavated earth by MT upto disposal site as identified by site Engineer. | 54 | cum | 256.85 | ₹13,869.9 |
| 3 | Supply spreading and filling of nallah muck filling in layers incl. watering dressing ramming incl. all carriages of materials from source to site of work complete job. | 420.51 | cum | 900 | ₹3,78,459 |
| 4 | Supplying and stacking of graded stone agg. at site of size range 63-45mm Grade-IInd with stone screening / chippings 13.2mm size nominal size type A stone dust moorum (Khakh Bajri) at site incl. all carriage and laying water bound macadam with specified stone agg. stone screening and binding material incl. screening, sorting , spreading to template and consolidation with PRR with 8-10 tonne capacity etc. complete job (75 mm compacted thickness (MORTH) specifications | 206.13 | cum | 3,000 | ₹6,18,390 |
| 5 | Providing and laying RCC Spun pipes in position including excavation of trenches, ramming of bottom, dressing of sides providing required cushion over the pipes including loading , unloading and carriage upto site of work complete job
15" Pipe Dia= 2 NO | 4.88 | RM | 3,200 | ₹15,616 |
| 6 | R/B Wall | - | - | - | - |
| 7 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: | 46.05 | cum | 256.85 | ₹11,827.94 |
| 8 | Providing and laying dry Stone soling duly tightly hand packed and RBM/GSB filling i/c stacking, carriage etc, complete job. | 7.59 | cum | 1,000 | ₹7,590 |
| 9 | Providing and laying in position cement concrete of specified grade (1:4:8) mix,stone aggregate 40mm nominal size i/c the cost of centring and shuttering - All work upto plinth level. Complete job. Incl all carriages | 5.06 | cum | 5,552.5 | ₹28,095.65 |
| 10 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts,struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets etcupto floor V level, including curing but excluding the cost of centring, shuttering and finishing with.. 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)incl all carriages | 58.51 | cum | 8,900 | ₹5,20,739 |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.70 MB
BOQ_1088721.xls
BOQ • 0.25 MB
Satkoji.pdf
PDF • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .