SE EDC I MZN
H NO 60/168 LAXMAN VIHAR KAMBALWALA BAGH MUZAFFARNAGAR
WORK FOR 33 KV VCB AND CONTROL PANNEL SHIFTING REPAIR AND SUPPLY MAINTAIN WORK
2021_PVVNL_603024_1
15/2021-2022/EDC-I MZN
Open Tender
Miscellaneous Works
Lump-sum
UNDER THE AREA OF EDD II MZN
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
SE EDC I MZN
₹2,000
24 Jul 2021
12 Jul 2021
22 Jul 2021
12 Jul 2021
22 Jul 2021
12 Jul 2021
Amount
Opening the Jumphers and earthing strip of damaged 33 KV VCB installed at 33/11 KV Substation Begrajpur & 33/11 KV Substation Begrajpur Industrial.
Dismentling of old and damaged 33 KV VCB from structure with the help of Heavy Duty Vrain and safely moving it out side switch yard at 33/11 KV Substation Begrajpur & 33/11 KV Substation Begrajpur Industrial.
Dismentling of old and damaged 33 KV Control Pannel from the control room and shifting from control room to outside the control room of sub-station
Miner Repair and overhauling of 33 KV VCB and proper functioning.
Miner Repair and overhauling of 33 KV Control Pannel double circute and proper functioning.
Safe Carriage of 33 KV VCB from 33/11 KV Substation Charthawal to 33/11 KV Substation Begrajpur & 33/11 KV Substation Begrajpur Industrial including loading and unloading at both ends approximate distance 30 K.M.
Safe Carriage of 33 KV Control Pannel from 33/11 KV Substation Charthawal to 33/11 KV Substation Begrajpur & 33/11 KV Substation Begrajpur Industrial including loading and unloading at both ends approximate distance 30 K.M.
Instalation of 33 KV Control Pannel Shifting of 33 KV Control Pannel Carefully from out side of the switch gear room to inside the S.G.Room grouting of anchor bolts and proper connections
Instalation of 33 KV VCB Assembling and Instalation of 33 KV VCB on the 33 KV VCB Structure Adjusting of operating mechanisum in proper aligment so as to ensure smooth operation of the same and proper connection.
Laying of MIS Strip of size 20x6 mm for connecting the earth mat with the stell structure, strengthing and welding of the earth strip with earth mat.
Jampering of 33 KV BUS BAR including Clamping/Binding wihh ACSR Dog Conductor main BUS BAR to 33 KV VCB providing of 06 no All Lugs
Athrva Enterprises
GUPTA TRANSFORMER PRODUCTS
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .