| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹4.2 LAccepted-AOC VILLAGE DALOG P O NARAIN TEHSIL RAMPUR BUSHAHR DISTT SHIMLA H P | SHIMLA | HIMACHAL PRADESH | 171001 | ₹4.2 L Quoted ₹5.8 L | L-1 | Accepted-AOC accepted |
| 2 | L2₹6.4 LRejected-Finance HIMACHAL PRADESH HP | ₹6.4 L | L2 | Rejected-Finance rejected |
| 3 | L3₹6.9 LRejected-Finance | ₹6.9 L | L3 | Rejected-Finance rejected |
| Sl No | Description | Qty | Unit | DEEPAK RAJ KAITH L1 | MUKESH KUMAR L2 | VIKAS RANA L3 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundation trenches etc.(for pipes & pits upto all depth) in earth work in all classification of earth work such as pick work, jumper work, saturated soil , blasting soft/hard rock or chiselling soft/ hard rock including wedging out of a rock where blasting is prohibited in all lifts including trimming and dressing of sides levelling of beds to correct grades including shoring, strutting, planking, timbering and dewatering where ever required, stacking the serviceable/unserviceable materials/soil separately and after laying and jointing of pipes, returning the usable soil in trenches in 15 CM layers including consolidation of each deposited layers by ramming and watering and then dispositng of all surplus excavated soil, useable materials as directed within all leads/lifts including restoration of metalled surfaces to its original condition and including cost of diversion for traffic night signals, fixing caution boards, crossing over trenches for access to houses fencing etc. complete in all respect within all leads and lifts as per the direction of Engineer-in-Charge. | 184.87 | Cum. | 575 ₹1.1 L | 600 ₹1.1 L | 620 ₹1.1 L |
| 2.00Relaying jointing and testing of GI pipe of following dia at site with circumferential butt welding (In three Layers) at both ends according to relevent BIS stanards/approved specification. The welding fo pipe with butt welding should confirm to IS: 816-1969 (with upto date amendment) to make the joint leak proof and air tight including bends of required degree complete in all respects. The welding electrodes shall be as per IS 814-1991 of advani/Oerlinken/L&T or ISI marked make .The Welding of Socket joint sould be done in two layers on both ends of socket to make the joints air tight upto all leads & lift as per entire satisfiction of Engineer- In -Charge | ||||||
| 2.01 | 80 mm nominal diameter. | 1,464 | Rmt. | 200 ₹2.9 L | 220 ₹3.2 L | 240 ₹3.5 L |
| 2.02 | 100 mm nominal diameter. | 816 | Rmt. | 220 ₹1.8 L | 250 ₹2.0 L | 280 ₹2.3 L |
Tender Value
₹5.3 L
EMD Value
₹10,685
Closing Date
12 Feb 2026, 5:00 pmClosed
EE Rampur
JSD Rampur
Restoration of rain damages to WSS Nehra
2026_HPIPH_127609_1
EE-JSD-RMP-E-ten/25-12949-999 dt 02.02.2026
Open Tender
Civil Works
90 days
Rampur
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
₹10,685
11 May 2026
5 Feb 2026
13 Feb 2026
5 Feb 2026
12 Feb 2026
5 Feb 2026
Excavation in foundation trenches etc.(for pipes & pits upto all depth) in earth work in all classification of earth work such as pick work, jumper work, saturated soil , blasting soft/hard rock or chiselling soft/ hard rock including wedging out of a rock where blasting is prohibited in all lifts including trimming and dressing of sides levelling of beds to correct grades including shoring, strutting, planking, timbering and dewatering where ever required, stacking the serviceable/unserviceable materials/soil separately and after laying and jointing of pipes, returning the usable soil in trenches in 15 CM layers including consolidation of each deposited layers by ramming and watering and then dispositng of all surplus excavated soil, useable materials as directed within all leads/lifts including restoration of metalled surfaces to its original condition and including cost of diversion for traffic night signals, fixing caution boards, crossing over trenches for access to houses fencing etc. complete in all respect within all leads and lifts as per the direction of Engineer-in-Charge.
Relaying jointing and testing of GI pipe of following dia at site with circumferential butt welding (In three Layers) at both ends according to relevent BIS stanards/approved specification. The welding fo pipe with butt welding should confirm to IS: 816-1969 (with upto date amendment) to make the joint leak proof and air tight including bends of required degree complete in all respects. The welding electrodes shall be as per IS 814-1991 of advani/Oerlinken/L&T or ISI marked make .The Welding of Socket joint sould be done in two layers on both ends of socket to make the joints air tight upto all leads & lift as per entire satisfiction of Engineer- In -Charge
80 mm nominal diameter.
100 mm nominal diameter.
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.58 MB
TC.pdf
Tender Documents • 0.02 MB
F6.pdf
Tender Documents • 0.66 MB
F8.pdf
Tender Documents • 1.07 MB
BOQ_188467.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid