Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹83.9 LAccepted-AOC | L1 | Accepted-AOC L1 Tenderer | |
| 2 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical EMD Not Furnished |
Tender Value
₹85.5 L
EMD Value
₹86,000
Closing Date
12 Jul 2022, 3:00 pmClosed
The Project Director DRDA Chengalpattu
O/o The Project Director DRDA Chengalpattu
Improvements to 9 Nos. of Tank/Ponds in Acharapakkam Block in Chengalpattu District Having Pacakage No 01Improvements to 9 Nos. of TankPonds in Acharapakkam Block in Chengalpattu District Having Pacakage No 01
2022_RDTN_237948_1
RC NO 4683.2022.A10 DT.24.06.2022
Open Tender
Civil Works
Item Rate
90 days
Acharapakkam Block
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹86,000
O/o The Project Director DRDA Chengalpattu
3 Nov 2022
29 Jun 2022
12 Jul 2022
29 Jun 2022
12 Jul 2022
29 Jun 2022
5 Jul 2022
Amount
PART I: Iprovements to Pillayar kovil kulam in Perumbakkam village @ Perumbakkam Panchayat Estimate Amount : Rs.8.00 Lakhs
Clearing and removing Light jungles including grubting the roots bushes waste logs and other debries ad directed by the departmental officers including labour charges for cutting and removing and all other incidental charges, etc. Complete as per standard.
Clearing and removing Heavy jungles including grubting the roots bushes waste logs and other debries ad directed by the departmental officers including labour charges for cutting and removing and all other incidental charges, etc. Complete as per standard.
Earth work in all soils Except hard rock requring blasting and conveyance for formation of bund with an extra lead of every 100mor part there of deploying earth moving machinery and tippers including benching ,formation of bunds.breaking clods,sectiong etc.,compelete
Earth work excavating and depositing on bank with initial lead of 10m & initial lift of 2m in Hard stiff clay ,stiff block cotton,hard red earth,shales,murram,gravel,stoney earth and earth mixed with small size boulders SS20B
Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete.,For Foundation
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
Cement concrete 1:3:6 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete.
Rough stone dry packing for aprons and revetments including cost and conveyance and all labour charges etc complete
Pointing with cement mortar 1:3 flush pointing for RR Masondry including cost and conveyance of all materialsand all labour charges etc complete
PART II: Iprovements to Gudapakkam Eri at Gudapakkam Village in Perumbakkam Panchayat Estimate Amount : Rs.10.71 Lakhs
Desilting and Strengthening in Gudapakkam Eri at Gudapakkam Village in Perumbakkam Panchayat
Clearing the Surub Jungle in Water Spread area with Uprooting and Disposing of the Same as Directed by the Engineer in charge of the Works as per technical Specification
Clearing the Light Jungle with Uprooting and Disposing of the Same as Directed by the Engineer in charge of the Works as per technical Specification
Earth work in all soils Except hard rock requring blasting and conveyance for formation of bund with an extra lead of every 100mor part there of deploying earth moving machinery and tippers including benching ,formation of bunds.breaking clods,sectiong etc.,compelete
Earth work excavation deploying earth moving machinery for desilting channel having a width of more than 10m and forming bund on either sides and depositing the eatrh on banks including jungle clearance.,etc.compelete
Extra watering and consolidation by power roller including hire charges (Baased on L.S & C.S Proposed Quantity for tank Bund)
Providing Revetment
Earth work excavation and depositing on bank with initial lead and lift in Hard gravelly soil.,etc
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyace , etc.
Supplying and Errecting centering for sides and soffits.,etc.compelete
Cement concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyace , etc.
Rough stone dry packing for aprons and revetments including cost and conveyance and all labour charges etc complete
Pointing with cement mortar 1:3 flush pointing for RR Masondry including cost and conveyance of all materialsand all labour charges etc complete for 10 Sqm
PART III: Iprovements to Valayaputhur Chitheri in Valayaputhur village in Vedanthangal village Panchayat Estimate Amount : Rs.11.04 Lakhs
Clearing the Surub Jungle in Water Spread area with Uprooting and Disposing of the Same as Directed by the Engineer in charge of the Works as per technical Specification
Clearing the Light Jungle with Uprooting and Disposing of the Same as Directed by the Engineer in charge of the Works as per technical Specification
Earth work in all soils Except hard rock requring blasting and conveyance for formation of bund with an extra lead of every 100mor part there of deploying earth moving machinery and tippers including benching ,formation of bunds.breaking clods,sectiong etc.,compelete
Earth work excavation deploying earth moving machinery for desilting channel having a width of more than 10m and forming bund on either sides and depositing the eatrh on banks including jungle clearance.,etc.compelete
Extra watering and consolidation by power roller including hire charges (Baased on L.S & C.S Proposed Quantity for tank Bund)
Provision of Revetment
Earth work excavation and depositing on bank with initial lead and lift in Hard gravelly soil.,etc
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyace , etc.
Supplying and Errecting centering for sides and soffits.,etc.compelete
Cement concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyace , etc.
Rough stone dry packing for aprons and revetments including cost and conveyance and all labour charges etc complete
Pointing with cement mortar 1:3 flush pointing for RR Masondry including cost and conveyance of all materialsand all labour charges etc complete for 10 Sqm
PART IV: Iprovements to Kunnadi Thangal in Ottapalayam habitation at Thinnalur village Panchayat Estimate Amount : Rs.9.90 Lakhs
Clearing the Surub Jungle in Water Spread area with Uprooting and Disposing of the Same as Directed by the Engineer in charge of the Works as per technical Specification
Clearing the Light Jungle with Uprooting and Disposing of the Same as Directed by the Engineer in charge of the Works as per technical Specification
Earth work in all soils Except hard rock requring blasting and conveyance for formation of bund with an extra lead of every 100mor part there of deploying earth moving machinery and tippers including benching ,formation of bunds.breaking clods,sectiong etc.,compelete
Earth work excavation deploying earth moving machinery for desilting channel having a width of more than 10m and forming bund on either sides and depositing the eatrh on banks including jungle clearance.,etc.compelete
Extra watering and consolidation by power roller including hire charges (Baased on L.S & C.S Proposed Quantity for tank Bund)
Provision of Revetment
Earth work excavation and depositing on bank with initial lead and lift in Hard gravelly soil.,etc
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyace , etc.
Supplying and Errecting centering for sides and soffits.,etc.compelete
Cement concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyace , etc.
Rough stone dry packing for aprons and revetments including cost and conveyance and all labour charges etc complete
Pointing with cement mortar 1:3 flush pointing for RR Masondry including cost and conveyance of all materialsand all labour charges etc complete for 10 Sqm
Re Costruction of Sluice
Earth work excavation and depositing on bank with initial lead and lift in Hard gravelly soil.,etc
Earth work excavation and depositing on bank with initial lead and lift in Hard gravelly soil.,etc
Collection and Supply of M. Sand filling in tio the Basement with cated river sand .,etc
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyace , etc.
Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyace , etc.
Supplying and Errecting centering for sides and soffits.,etc.compelete
Supply and Fabrication of steel for RCC Items including cost and Conveyance
RCC 1:1.5:3 mix using 20mm ISS HBG metal including cost and conveyace
Supplying and Fixing cut stone roughly dressed to all faces and set in cm 1:3 including all chrges.,etc
Refilling with the Excavated earth other than sand only labour charges.,etc
Fabrication and supply of Country wood plug of size 40x40 and 45cm to60cm height the plug rod with 20mm dia mild steel rod of size 3.0m to 4.50m height,the plug topside,middle,centre and bottom side coverd iron strap 3 nos
Providing Granite stone for Hydraulic Particulars of sluice
PART V: Iprovements to Vannan Thangal in Vadamanipakkam Village at Vadamanipakkam village Panchayat Estimate Amount : Rs.9.33 Lakhs
Clearing the Surub Jungle in Water Spread area with Uprooting and Disposing of the Same as Directed by the Engineer in charge of the Works as per technical Specification
Clearing the Light Jungle with Uprooting and Disposing of the Same as Directed by the Engineer in charge of the Works as per technical Specification
Earth work in all soils Except hard rock requring blasting and conveyance for formation of bund with an extra lead of every 100mor part there of deploying earth moving machinery and tippers including benching ,formation of bunds.breaking clods,sectiong etc.,compelete
Earth work excavation deploying earth moving machinery for desilting channel having a width of more than 10m and forming bund on either sides and depositing the eatrh on banks including jungle clearance.,etc.compelete
Extra watering and consolidation by power roller including hire charges (Baased on L.S & C.S Proposed Quantity for tank Bund)
Costruction of Weir
Earth work excavation and depositing on bank with initial lead and lift in Hard gravelly soil.,etc
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyace , etc.
Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyace , etc.
Cement concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyace , etc.
Supplying and Errecting centering for sides and soffits.,etc.compelete
PART VI: Iprovements to Kolathur chitheri at Kolathur village in Karikili village Panchayat Estimate Amount : Rs.13.05 Lakhs
Clearing the Surub Jungle in Water Spread area with Uprooting and Disposing of the Same as Directed by the Engineer in charge of the Works as per technical Specification
Clearing the Light Jungle with Uprooting and Disposing of the Same as Directed by the Engineer in charge of the Works as per technical Specification
Earth work in all soils Except hard rock requring blasting and conveyance for formation of bund with an extra lead of every 100mor part there of deploying earth moving machinery and tippers including benching ,formation of bunds.breaking clods,sectiong etc.,compelete
Earth work excavation deploying earth moving machinery for desilting channel having a width of more than 10m and forming bund on either sides and depositing the eatrh on banks including jungle clearance.,etc.compelete
Extra watering and consolidation by power roller including hire charges (Baased on L.S & C.S Proposed Quantity for tank Bund)
Provision of Revetment
Earth work excavation and depositing on bank with initial lead and lift in Hard gravelly soil.,etc
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyace , etc.
Supplying and Errecting centering for sides and soffits.,etc.compelete
Cement concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyace , etc.
Rough stone dry packing for aprons and revetments including cost and conveyance and all labour charges etc complete
Pointing with cement mortar 1:3 flush pointing for RR Masondry including cost and conveyance of all materialsand all labour charges etc complete for 10 Sqm
Costruction of Weir
Earth work excavation and depositing on bank with initial lead and lift in Hard gravelly soil.,etc
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyace , etc.
Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyace , etc.
Cement concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyace , etc.
Supplying and Errecting centering for sides and soffits.,etc.compelete
PART VII: Iprovements to Karunagaravilagam Periya eri in Karunagara vilagam at Morapakkam village Panchayat Estimate Amount : Rs.5.00 Lakhs
Clearing the Surub Jungle in Water Spread area with Uprooting and Disposing of the Same as Directed by the Engineer in charge of the Works as per technical Specification
Clearing the Light Jungle with Uprooting and Disposing of the Same as Directed by the Engineer in charge of the Works as per technical Specification
Earth work in all soils Except hard rock requring blasting and conveyance for formation of bund with an extra lead of every 100mor part there of deploying earth moving machinery and tippers including benching ,formation of bunds.breaking clods,sectiong etc.,compelete
Earth work excavation deploying earth moving machinery for desilting channel having a width of more than 10m and forming bund on either sides and depositing the eatrh on banks including jungle clearance.,etc.compelete
Extra watering and consolidation by power roller including hire charges (Baased on L.S & C.S Proposed Quantity for tank Bund)
Provision of Revetment
Earth work excavation and depositing on bank with initial lead and lift in Hard gravelly soil.,etc
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyace , etc.
Supplying and Errecting centering for sides and soffits.,etc.compelete
Cement concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyace , etc.
Rough stone dry packing for aprons and revetments including cost and conveyance and all labour charges etc complete
Pointing with cement mortar 1:3 flush pointing for RR Masondry including cost and conveyance of all materialsand all labour charges etc complete for 10 Sqm
PART VIII: Iprovements toVillage Kulam in Morapakkam Village at Morapakkam village Panchayat Estimate Amount : Rs.6.73 Lakhs
Clearing and removing Light jungles including grubting the roots bushes waste logs and other debries ad directed by the departmental officers including labour charges for cutting and removing and all other incidental charges, etc. Complete as per standard.
Clearing and removing Heavy jungles including grubting the roots bushes waste logs and other debries ad directed by the departmental officers including labour charges for cutting and removing and all other incidental charges, etc. Complete as per standard.
Earth work in all soils Except hard rock requring blasting and conveyance for formation of bund with an extra lead of every 100mor part there of deploying earth moving machinery and tippers including benching ,formation of bunds.breaking clods,sectiong etc.,compelete
Earth work excavating and depositing on bank with initial lead of 10m & initial lift of 2m in Hard stiff clay ,stiff block cotton,hard red earth,shales,murram,gravel,stoney earth and earth mixed with small size boulders SS20B
Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete.,For Foundation
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
Cement concrete 1:3:6 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete.
Rough stone dry packing for aprons and revetments including cost and conveyance and all labour charges etc complete
Pointing with cement mortar 1:3 flush pointing for RR Masondry including cost and conveyance of all materialsand all labour charges etc complete
PART IX: Iprovements to Rajampalayam Thangal in Annangal Village Panchayat Estimate Amount : Rs.11.79 Lakhs
Clearing the Surub Jungle in Water Spread area with Uprooting and Disposing of the Same as Directed by the Engineer in charge of the Works as per technical Specification
Clearing the Light Jungle with Uprooting and Disposing of the Same as Directed by the Engineer in charge of the Works as per technical Specification
Earth work in all soils Except hard rock requring blasting and conveyance for formation of bund with an extra lead of every 100mor part there of deploying earth moving machinery and tippers including benching ,formation of bunds.breaking clods,sectiong etc.,compelete
Earth work excavation deploying earth moving machinery for desilting channel having a width of more than 10m and forming bund on either sides and depositing the eatrh on banks including jungle clearance.,etc.compelete
Extra watering and consolidation by power roller including hire charges (Baased on L.S & C.S Proposed Quantity for tank Bund)
Provision of Revetment
Earth work excavation and depositing on bank with initial lead and lift in Hard gravelly soil.,etc
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyace , etc.
Supplying and Errecting centering for sides and soffits.,etc.compelete
Cement concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyace , etc.
Rough stone dry packing for aprons and revetments including cost and conveyance and all labour charges etc complete
Pointing with cement mortar 1:3 flush pointing for RR Masondry including cost and conveyance of all materialsand all labour charges etc complete for 10 Sqm
Re-Costruction of Sluice
Earth work excavation and depositing on bank with initial lead and lift in Hard gravelly soil.,etc
Earth work excavation and depositing on bank with initial lead and lift in Hard gravelly soil.,etc
Collection and Supply of M. Sand filling in tio the Basement with cated river sand .,etc
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyace , etc.
Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyace , etc.
Supplying and Errecting centering for sides and soffits.,etc.compelete
Supply and Fabrication of steel for RCC Items including cost and Conveyance
RCC 1:1.5:3 mix using 20mm ISS HBG metal including cost and conveyace
Supplying and Fixing cut stone roughly dressed to all faces and set in cm 1:3 including all chrges.,etc
Refilling with the Excavated earth other than sand only labour charges.,etc
Fabrication and supply of Country wood plug of size 40x40 and 45cm to60cm height the plug rod with 20mm dia mild steel rod of size 3.0m to 4.50m height,the plug topside,middle,centre and bottom side coverd iron strap 3 nos
Providing Granite stone for Hydraulic Particulars of sluice
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .